You are on page 1of 6

Sr No Description Locatio Before After

n
TURBINE PROPER SYSTEM
1 MS common line drain 6.9 38 35
2 MS left side drain 6.9 37 37
3 MS right side drain 6.9 36 35
4 MSV Top side drain 6.9 190 140

5 MSV Bottom side drain 6.9 170 130

6 CRH before NRV drain 0 157 47


7 CRH after NRV drain 0 45 38
8 CRH line drain 13 39 38
9 HP regulating valve drain 0 45 40
10 RSV left side drain 6.9 50 45
11 RSV right side drain 6.9 40 38
12 HRH left side drain 6.9 61 58
13 HRH right side drain 6.9 118 101
14 LP bypass drain 0 40 38
EXTRACTION SYSTEM
15 Extraction 1 before NRV drain 6.9 280 185
16 Extraction 1 after NRV drain 6.9 48 45
17 Extraction 1 after MOV drain 6.9 46 40
18 Extraction 1 before HPH 1 drain 6.9 40 40
19 Extraction 2 before MOV drain 6.9 205 220
20 Extraction 2 after MOV drain 6.9 50 40
21 Extraction 3 before NRV drain 6.9 85 57
22 Extraction 3 after NRV drain 6.9 110 45
23 Extraction 3 after MOV drain 6.9 100 60
24 Extraction 4 before 1st pneumatic valve 6.9 56 44
25 drain
Extraction 4 after 1st pneumatic valve 6.9 78 76
26 drain
Extraction 4 before MOV drain 6.9 82 40
27 Extraction 4 after MOV drain 6.9 54 42
28 Extraction 5 before NRV drain 6.9 78 42
29 Extraction 5 before MOV drain 6.9 65 50
30 Extraction 5 after MOV drain 6.9 41 38
31 Extraction 6 before NRV drain 6.9 45 40
ASH
32 APRDS Header drain 6.9 120 80

33 CRH to APRDS before Control valve 6.9 180 180


34 drain
Extraction 4 to APRDS NRV before drain 0 90 70

35 Extraction 4 to APRDS NRV after drain 6.9 77 44

36 APRDS to Gland steam line drain 6.9 125 48


GLAND STEAM SYSTEM
37 Auxiliary steam + CRH line to Gland 0 120 60
steam Header drain
38 Gland steam supply line HDR drain 6.9 130 52
39 MS to Gland steam header line drain 6.9 38 35
TDBFP SYSTEM
40 Ext 4 & APRDS to TDBFP A drain before 13 94 50
41 MOV
Ext 4 & APRDS to TDBFP B drain before 13 105 52
42 MOV
Ext 4 & APRDS to TDBFP A drain after 13 130 64
43 MOV
Ext 4 & APRDS to TDBFP B drain after 13 140 62
44 MOV
CRH to TDBFP A drain before MOV 6.9 45 38
45 CRH to TDBFP B drain before MOV 6.9 40 38
46 CRH to TDBFP A drain after MOV 6.9 44 36
47 CRH to TDBFP B drain after MOV 6.9 39 34
48 TDBFP Gland supply line drain 6.9 45 37
49 TDBFP Gland return line drain 6.9 100 44
50 TDBFP A exhaust line drain 6.9 61 40
51 TDBFP B Ext 4 + APRDS steam I/L line 6.9 40 38
52 drain
APRDS to TDBFP line drain 6.9 55 50

FEED WATER SYSTEM


53 TDBFP A & B Main pump Casing vent 13 42 48
54 HPH 3 tube side drain 13 43 40
55 HPH 2 tube side drain 13 48 42
56 HPH 1 tube side drain 13 52 39
57 HPH 3 shell side drain 13 39 36
58 HPH 3 emergency drip 0 38 38
59 HPH 2 shell side drain 13 42 39
60 HPH 2 emergency drip 0 36 35
61 HPH 1 shell side drain 13 40 38
62 HPH 1 emergency drip 0 80 35
63 Deaerator drain 13 75 72
Priority Before After Priority

45 38
42 38
41 37
160 123
2 2

123 55
2 2

150 45
145 40
45 42

128 80
165 150
150 65
3 118 133 3

1 152 45
248 44
91 40
42 38
1 43 42 1
110 45
66 43
92 75
82 70

82 48
125 105
130 85
55 43
85 55
48 39
43 34

110 85

1 185 85 1
135 80

105 85

110 45

39 38
57 46
58 40
55 48
151 45
44 42
65 45
52 47
45 37
46 36
45 37
128 82
110 55
43 41
115 50
83

44 43
43 41
45 41
42 41
43 42
43 38
43 41
85 42
44 42
55 43
51 47