SAUDI ARAMCO INSPECTION CHECKLIST
Material Verification of Pressure Containing Repair
SAIC-L-2142 30-Apr-17 PIPE-
Sleeves
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
A General Requirements

Sleeve material is equivalent to API 5L, Gr.X-60 material, having a


specified minimum yield strenght (SMYS) of not less than
413.7 MPa.
SAEP-310,
NOTES:
Para. 2.1& 2.2
A1 a. ASTM A537 Class 2 is an acceptable alternate) -Refer to
SASD-AB-
Std. Dwg. L-AB-036262, Sht. 2, Note 2
036262
b. For Sleeves not issued by Saudi Aramco, material test
certificate shall be available to verify conformance of the
sleeve to item # A1 above

SAEP-310,
Sleeve dimension conforms with the table in Std. Dwg. L-AB- Para. 2.1& 2.2
A2
036262, Sht. 2, (Attachment 1) SASD-AB-
036262 Sht. 002

SAEP-310,
The pipe size is stenciled on the outside surface of each half of the Para. 2.1& 2.2
A3
sleeve. (Refer to Attachment 1, Note 3) SASD-AB-
036262

SAEP-310,
The longitudinal weld joint sides of the two halves of sleeves are
Para. 2.1& 2.2
A4 beveled to 37 degrees +/- 2.5 degrees without a land. (Refer to
SASD-AB-
Attachment 1 Note:5)
036262 Sht. 002

SAEP-310,
The minimum length of sleeves shall be at least 102 mm. SASD-AB Para. 2.1& 2.2
A5
036262 Sht 1-Note:9) SASD-AB-
036262

SAEP-310,
Run-out tabs are made from low carbon steel with thickness equal to Para. 2.1& 2.2
A6
sleeve thickness.(Refer to Attachment 1 Note:5) SASD-AB-
036262

Backing Strip fabricated from low carbon steel material is tack welded SAEP-310,
to the lower half of the repair sleeve. Para. 2.1& 2.2
A7
(NOTE: If the sleeves are not provided with backing strips, the srips SASD-AB-
shall be installed in the field.- Std. Dwg. L-AB-036262, Sh.1, Note 6) 036262

Saudi Aramco: Company General Use


SAEP-310,
Backing Strip dimension is 1.6 mm X 25 mm and covers the total
Para. 2.1& 2.2
A8 length of the longitudinal joint including the run-out tabs on both ends
SASD-AB-
of the sleeves. (Refer to Attachment 1)
036262

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 30-Apr-2017 - REV. 2015.03.00 (Standards Cutoff - March 2015) Rev. 2015.03.00 31-Mar-15
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Material Verification of Pressure Containing Repair
SAIC-L-2142 30-Apr-17 PIPE-
Sleeves
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

No physical damage (dents, gouges, pittings, etc) are noted on the Project Specific
A9
sleeves, backing strips and run-out tabs. Schedule Q

REMARKS:

ATTACHMENT:
1. Attachment 1 - Fabrication of pipeline repair sleeves(Pressure Containing sleeves)

REFERENCE DOCUMENTS:
1. SAEP-310, Piping & Pipeline repair (10 March, 2012)
2. Standard Drawing - AB-036262 - SHT-001, 002 AND 003.
3. Schedule Q- Project Specific & Contractor's Quality Procedures
Contractor / Third-Party Saudi Aramco
Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 30-Apr-2017 - REV. 2015.03.00 (Standards Cutoff - March 2015) Rev. 2015.03.00 31-Mar-15
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Material Verification of Pressure Containing Repair
SAIC-L-2142 30-Apr-17 PIPE-
Sleeves

ATTACHMENT 1 - Fabrication of Pipeline Repair Sleeves (Pressure Containing Sleeves)

1. SAEP-310, Piping & Pipeline repair (10 March, 2012)