Saic L 2142
Saic L 2142
00 31-Mar-15
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Material Verification of Pressure Containing Repair
SAIC-L-2142 30-Apr-17 PIPE-
Sleeves
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
A General Requirements
SAEP-310,
Sleeve dimension conforms with the table in Std. Dwg. L-AB- Para. 2.1& 2.2
A2
036262, Sht. 2, (Attachment 1) SASD-AB-
036262 Sht. 002
SAEP-310,
The pipe size is stenciled on the outside surface of each half of the Para. 2.1& 2.2
A3
sleeve. (Refer to Attachment 1, Note 3) SASD-AB-
036262
SAEP-310,
The longitudinal weld joint sides of the two halves of sleeves are
Para. 2.1& 2.2
A4 beveled to 37 degrees +/- 2.5 degrees without a land. (Refer to
SASD-AB-
Attachment 1 Note:5)
036262 Sht. 002
SAEP-310,
The minimum length of sleeves shall be at least 102 mm. SASD-AB Para. 2.1& 2.2
A5
036262 Sht 1-Note:9) SASD-AB-
036262
SAEP-310,
Run-out tabs are made from low carbon steel with thickness equal to Para. 2.1& 2.2
A6
sleeve thickness.(Refer to Attachment 1 Note:5) SASD-AB-
036262
Backing Strip fabricated from low carbon steel material is tack welded SAEP-310,
to the lower half of the repair sleeve. Para. 2.1& 2.2
A7
(NOTE: If the sleeves are not provided with backing strips, the srips SASD-AB-
shall be installed in the field.- Std. Dwg. L-AB-036262, Sh.1, Note 6) 036262
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
No physical damage (dents, gouges, pittings, etc) are noted on the Project Specific
A9
sleeves, backing strips and run-out tabs. Schedule Q
REMARKS:
ATTACHMENT:
1. Attachment 1 - Fabrication of pipeline repair sleeves(Pressure Containing sleeves)
REFERENCE DOCUMENTS:
1. SAEP-310, Piping & Pipeline repair (10 March, 2012)
2. Standard Drawing - AB-036262 - SHT-001, 002 AND 003.
3. Schedule Q- Project Specific & Contractor's Quality Procedures
Contractor / Third-Party Saudi Aramco
Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date: