00 31-Mar-15
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
In-Process Inspection of Refractory Applied by Casting SAIC-N-2026 30-Apr-17 CO-200131-02
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
SAES-N-110,
B1 Mixing of refractory materials is done in a paddle type mixer.
Para. 9.5.1
Only full contents of refractory bags or drums are placed in the mixer. SAES-N-110,
B2
Fractional parts of the bag or drum are not used. Para. 9.5.2
When fiber reinforcement is used, the fibers are added to the mixer SAES-N-110,
B3
through a wire mesh screen with approximately 12 mm openings. Para. 9.5.3
SAES-N-110,
C3 Refractory shall be compacted by spading or vibrating.
Para. 9.6.2
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
SAES-N-110,
C5 Work shall not be terminated until a panel or section is complete.
Para. 9.6.3
SAES-N-110,
01-FEB-2020/09.30AM
Curing is carried out whenever the application is interrupted.
Para. 9.6.4
Two (2) Production test samples were taken once per shift or each
SAES-N-110,
D2 change of nozzleman/installer (1 sample to lab, 1 sample site stored
Para. 11.3.1
& cured)
REFERENCE DOCUMENTS:
1. SAES-N-100 -- Refractory Systems (15 August 2012)
2. SAES-N-110 -- Installation Requirements-Castable Refractories (22 July 2012)
3. SAES-N-120 -- Installation Requirements-Extreme Erosion Resistant Refractories (11 April 2012)
ATTACHMENTS:
1. Attachment 1 -- SA INSP FORM 175-328110 (Refractories)
NOTES: 1. Use Table 2 & 3 – Mandatory Refractory Systems of SAES-N-100 (Not Attached) for Pre-installation inspection checks of
materials.