SAUDI ARAMCO INSPECTION CHECKLIST
HDPE Liner Placement and Seaming Inspection SAIC-A-1016 30-Apr-17 Civil-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

A Liner Placement

The subgrade should be smooth and free of all rocks, sharp stones, Method
A1
sticks, roots, sharp objects, or debris of any kind Statement

Liner materials can be deployed by several methods. Ensure that


Method
A2 whichever method is used does not damage the liner, and that the
Statement
material is not folded, creased of crimped during deployment.

Deployment of liner shall be started first from the floor section. Floor Method
A3
section HDPE panels of required sizes shall be cut & prepared ready. Statement

Deployment should not be attempted during periods of high wind, in


Method
A4 the precence of excessive moisture or when ambient conditions
Statement
prohibit successful welding operations

Vertical section panels and floor section panels are jointed by


Method
A5 extrusion welding, with a min.clearance distance 300 mm from the
Statement
vertical surface.

Liner placement shall not be done during any precipitation, in the Method
A6
presence of excessive moisture (e.g., fog, rain, dew). Statement

B Seaming Inspection

Joint shall be prepared and executed in accordance with lining Method


B1
manufacturer's instructions. Statement

Before making field joints, all wrinkles shall be removed from the Method
B2
surfaces to be joined. Statement

Method
B3 Joining surfaces shall be clean and dry.
Statement

Cleaning solvents may not be used unless the product is approved Method
B4
by the liner manufacturer. Statement

Field pints shall be lapped between 100 and 150 mm or as per Method
B4
manufacturer recommendation. Statement

Wherever feasible, joining of surfaces shall use a wedge weld, with a Method
B5
void for air pressure testing and remaining by extrusion weld. Statement

As the installation progresses all seams should be assigned an


Method
B6 identification number and operators name should be recorded in the
Statement
daily reports.

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 30-Apr-2017 - REV. 2015.03.00 (Standards Cutoff - March 2015) Rev. 2015.03.00 31-Mar-15
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
HDPE Liner Placement and Seaming Inspection SAIC-A-1016 30-Apr-17 CIVIL-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

C Patching and Repairing

Method
C1 Patching - Used to repair large holes, tears and sample cut locations.
Statement

All patches shall extend at least three inches (3") or as per


Method
C2 manufacturer recommendation beyond the edges of the defect and
Statement
all corners of patches shall be rounded.

Grinding and welding is used to repair section of extruded fillet Method


C3
seams. Statement

Spot welding or seaming is used to repair small tears, pinholes or Method


C4
other minor localized flaws. Statement

Capping is used to repair lengths of extrusion or fusion welded Method


C5
seams. Statement

Method
C6 Extrude overlap runs along the length of fusion welded seams.
Statement

Removal of suspected seam and replace with a strip of new material Method
C7
seamed into place. Statement

REMARKS:

REFERENCE DOCUMENTS:
1- SAES-A-104 -- Wastewater Treatment, Reuse and Disposal, 28 December 2011

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED