You are on page 1of 8

SAUDI ARAMCO ID/PIEU - 15-Nov-2017 - REV. 2016.06.00 (Standards Cutoff -June 30, 2016) Rev. 2016.06.

00 30-Jun-16

SAUDI ARAMCO INSPECTION CHECKLIST SAIC NUMBER DATE APPROVED QR NUMBER

Geotechnical Field Works Inspection SAIC-A-1008 15-Nov-17 CIVIL-


PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

A General

The Geotechnical Contractor shall provide an Engineer or Geologist in the


field full-time during exploration activities. The Engineer/Geologist shall SAES-A-113
A1
supervise and observe all subsurface exploration operations, classify Sec. 5.3
samples and prepare log of borings, soundings, pits etc.

For the field tests, the Geotechnical Contractor shall utilize Inspection
SAES-A-113
A2 Department's list of Saudi Aramco approved Third Party laboratories with
Sec. 5.2.1.2
specific approval in geotechnical category.

The Geotechnical Contractor shall furnish all labor, equipment, tools,


supervision, supplies and transportation required to perform the
SAES A-113
A3 geotechnical investigation, exploration, testing, analyses and reporting in
Sec. 6.1.1
accordance with ASTM D420 and SAES A113 including requirements in
Appendix A

The Geotechnical Contractor shall immediately notify Saudi Aramco if


SAES-A-113
A4 initial field works and/or testing indicate a need for modifications in the
Sec.6.1.3
geotechncial investigation scope of works

UTM coordinates and Mean Sea Level (MSL) elevations must be provided
for all field tests. MSL elevations and UTM coordinates must be shown on
SAES-A-113
A5 the field test log. If local coordinates and elevations are available, a table
Sec. 6.3.2
shall be included in the report showing both local and UTM/MSL data for
each boring location.

SAES-A-113
A6 All boring logs must be prepared in Saudi Aramco Boring log format
Sec. 7.5

The Geotechnical Contractor shall comply with all aspects of the Saudi
SAES-A-113
A7 Aramco Construction Safety Manual and all safety programs and policies
Sec. 6.1.2
of Saudi Aramco.

B Boreholes

The location and depth of boreholes shall be as specified in the SAES-A-113


B1
geotechnical investigation Scope of Work. Sec. 6.4.1.1

Saudi Aramco: Company General Use


Automatic SPT hammers shall be used and standard penetration tests are
to be performed in accordance with ASTM D1586 at depths of 0.15, 0.75, SAES-A-113
B2
1.5,2.25, 3.0, 3.75, 4.5m and at 1.5m intervals thereafter and at changes in Sec. 6.4.1.2
soil strata.

Saudi Aramco: Company General Use


R

LANT NO.

NO.

TRAVEL TIME
ONLY
PERMIT REQUIRED?

RE-INSP DATE

Saudi Aramco: Company General Use


Saudi Aramco: Company General Use
SAUDI ARAMCO ID/PIEU - 15-Nov-2017 - REV. 2016.06.00 (Standards Cutoff -June 30, 2016) Rev. 2016.06.00 30-Jun-16

SAUDI ARAMCO INSPECTION CHECKLIST SAIC NUMBER DATE APPROVED QR NUMBER

Geotechnical Field Works Inspection SAIC-A-1008 15-Nov-17 CIVIL-


PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

If the soil is cohesive, undisturbed thin-wall tube samples shall be obtained


SAES-A-113
B3 in accordance with ASTM D1587. Double-tube core barrels shall be used
Sec. 6.4.1.2
for rock coring

If hand excavation is required, soils shall be sampled and logged including SAES-A-113
B4
estimation of the relative density (i.e. loose, medium dense etc.) Sec. 6.4.1.3

Groundwater measurements shall be made after stabilization of the water SAES-A-113


B5
table in the borehole Sec. 6.4.1.4

All boreholes shall be sealed with sand-cement mortar at the end of SAES-A-113
B6
groundwater measurements. Sec. 6.4.1.5

C Electronic Piezocone Penetration Testing

The location and depth of cone penetration soundings shall be as specified SAES-A-113
C1
in the geotechnical investigation Scope of Work. Sec. 6.4.2.1

Cone penetration testing shall include pore pressure measurements (i.e


SAES-A-113
C2 piezocone). Where stiff/dense soils are encountered, the piezocone shall
Sec. 6.4.2.2
be replaced with a higher capacity electronic cone.

For all cone penetration calibration, testing and data reporting, ASTM SAES-A-113
C3
D5778 shall be followed Sec. 6.4.2.3

D Cross-hole Seismic Testing

The location and depth of cross-hole seismic tests shall be as specified in


SAES-A-113
D1 the geotechnical investigation Scope of Work and exact location should be
Sec. 6.4.3.1
determined by Contractor's field Geologist based on field conditions.

Cross-hole Seismic Tests shall be as described in ASTM D4428. One shot


hole and two receiver holes shall be used. The tests shall be conducted at
SAES-A-113
D2 a minimum 0.75m interval to depth of 10m or as specified in scope of
Sec. 6.4.3.2
work. Only the shot hole shall be sampled and logged. The receiver holes
need not be sampled and logged.

E Shallow Refraction Seismic Soundings

The location of refraction seismic tests shall be as specified in the SAES-A-113


E1
geotechnical investigation Scope of Work. Sec. 6.4.4.1

The geophone spread should be twelve geophones at 2 m intervals for a


total of 24m spread. Soundings shall be taken at least twice at each SAES-A-113
E2
location with energy source at 0 and again at 26m. Additional sounding Sec. 6.4.4.2
should be taken if the results do not clearly define the rock layers

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 15-Nov-2017 - REV. 2016.06.00 (Standards Cutoff -June 30, 2016) Rev. 2016.06.00 30-Jun-16

SAUDI ARAMCO INSPECTION CHECKLIST SAIC NUMBER DATE APPROVED QR NUMBER

Geotechnical Field Works Inspection SAIC-A-1008 15-Nov-17 CIVIL-


PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

Seismic refraction testing and analysis shall be in accordance with ASTM SAES-A-113
E3
D5777 Sec. 6.4.4.3

F Test Pits

The location and depth of test pits shall be as specified in the geotechnical SAES-A-113
F1
investigation Scope of Work. Sec. 6.4.5.1

Unless otherwise specified in scope of work, the pits should extend to a


depth of 1m and logged. Density tests shall be performed on undisturbed
SAES-A-113
F2 soils at depths 0.0, 0.3, 0.6, and every 0.3m thereafter. Representative
Sec. 6.4.5.2
bulk samples of soil layers shall be taken for CBR testing per ASTM
D1883.

G Percolation Testing

The location of percolation test area shall be as specified in the SAES-A-113


G1
geotechnical investigation Scope of Work. Sec. 6.4.6.1

Percolation testing shall be performed as described in SASC-S-02. The


SAES-A-113
G2 depth of test holes should be the same as the depth of proposed trenches
Sec. 6.4.6.2
or seepage pits and uniformly spread over the proposed absorption field.

REMARKS:

REFERENCE DOCUMENTS:
1- SAES-A-113 -- Geotechnical Engineering Requirements, 16 March 2016

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Saudi Aramco: Company General Use


R

RE-INSP DATE

Saudi Aramco: Company General Use


R

Work Verified

Work Verified

Work Verified

N = NO F = FAILED

Saudi Aramco: Company General Use

You might also like