Saic N 2031
Saic N 2031
00 31-Mar-15
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Final Inspection & Punchlisting of Castable Refractories SAIC-N-2031 30-Apr-17 MECH-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
A. General Requirements (SAES-N-110 & SAES-N-120 Applications, See Note 1)
After air curing and drying out, all samples shall be subjected to cold- SAES-N-120
A2
crushing strength tests in accordance with ASTM C133. Para. 10.5.7
After air curing and drying out, two density checks shall be made
SAES-N-120
A5 from each shift's samples in accordance with ASTM C134. Densities
Para. 10.5.6
shall not be less than 2,400 kg/m³.
At the completion of curing and drying, the lining shall be randomly SAES-N-110,
A6 checked for voids or damaged areas. The check shall be conducted Para. 11.3.6
by lightly tapping with a 1-pound hammer.
For a specific band all rebound and loose material shall be removed
from the surface before application of the next band is started. No SAES-N-110
A9
rebound material shall be allowed to accumulate at any point where Para. 9.4.8
the lining has already been applied.
REMARKS:
REFERENCE DOCUMENTS:
1. SAES-N-110 -- Installation Requirements-Castable Refractories (22 Jul 2012)
2. SAES-N-120 -- Installation Requirements-Extreme Erosion Resistant Refractories (11 April 2012)