You are on page 1of 20

Data 1 PT.

ARKANANTA APTA PRATISTA Data 2


CYCLE TIME MONITORING of DUMPTRUCK
Day/date : Kamis/18 Juli 2013 Material : Sand stone Day/date
Operator : DEDE Kondisi Front : Sedang Operator
Cuaca : cerah Lokasi Angkut : Pit 01 Cuaca
Excavator Unit : e44 Disposal/Kondisi : Sedang Excavator Unit
Time : 08:00 - 09:40 Distance 2,366 meter Time

CATERPILLAR 777D HUNGRY BOARD, Unit RD-028

Manuver Travel Manuver Dumping Travel CT tnp


RIT Loading Delay CT Total Ket. RIT
Front Load Disposal Empty Delay
Rit 1 35.74 117.23 403.25 54.46 43.36 554.64 0 1,208.7 1,208.7 Second Rit 1
Rit 2 31.03 99.38 469.86 41.69 39.43 372.72 523.11 1,577.2 1,054.1 Second Rit 2
Rit 3 30.42 92.33 442.67 35.7 35.12 366 139.33 1,141.6 1,002.2 Second Rit 3
Rit 4 36.49 140.62 448.34 35.45 44.73 365.35 381.66 1,452.6 1,071.0 Second Rit 4
Rit 5 21.45 103.01 452.74 43.71 41.3 585.63 2.05 1,249.9 1,247.8 Second Rit 5
Total 155.1 552.6 2,216.9 211.0 203.9 2,244.3 1,046.2 6,630.0 5,583.9 Second Total
Avr 31.03 110.51 443.37 42.20 40.79 448.87 209.23 1,326.0 1,116.8 Second Avr
Avr 0.01 0.03 0.12 0.01 0.01 0.12 0.06 0.37 0.31 Hour Avr
Kecepatan 19.21 18.98 Km/jam Kecepatan
Truck Count 5 rit x 44 Bcm = 220 Bcm Truck Count
Densitas Material 1.70 Densitas Mater
Swell factor 76% Swell factor
fill factor alat muat 101% fill factor alat m
job efficiency 84% job efficiency
Cycle Time 1,116.77 Second Cycle Time
kapasitas vessel ( ton) 104.57 Ton kapasitas vesse
kapasitas vessel ( LCM ) 61.51 LCM kapasitas vesse
kapasitas bucket 15 LCM kapasitas buck
Jumlah pass 4.06 pass Jumlah pass
Productivity 126.92 Bcm/Jam Productivity
Data 2 PT. ARKANANTA APTA PRATISTA Data 3
CYCLE TIME MONITORING of DUMPTRUCK
Day/date : Kamis/18 Juli 2013 Material : Sand stone Day/date
Operator : DEDE Kondisi Front : Sedang Operator
Cuaca : cerah Lokasi Angkut : Pit 01 Cuaca
Excavator Unit : e44 Disposal/Kondisi : Sedang Excavator Unit
Time : 09:40-11:30 Distance 2,366 meter Time

CATERPILLAR 777D HUNGRY BOARD, Unit RD-028 CA

Manuver Travel Manuver Dumping Travel CT tnp


Loading Delay CT Total Ket. RIT
Front Load Disposal Empty Delay
35.16 194.71 465.74 45.08 40.1 375.43 207.5 1,363.7 1,156.2 Second Rit 1
33.62 119.85 388.6 34.61 38.5 349.92 289.52 1,254.6 965.1 Second Rit 2
31.25 99.85 417.5 37.35 37.14 377.87 41.91 1,042.9 1,001.0 Second Rit 3
63.81 117.38 400.64 34.77 42.41 366.02 406.88 1,431.9 1,025.0 Second Rit 4
83.92 122.04 377.36 30.6 38.67 341.03 443.57 1,437.2 993.6 Second Rit 5
247.8 653.8 2,049.8 182.4 196.8 1,810.3 1,389.4 6,530.3 5,140.9 Second Total
49.55 130.77 409.97 36.48 39.36 362.05 277.88 1,306.1 1,028.2 Second Avr
0.01 0.04 0.11 0.01 0.01 0.10 0.08 0.36 0.29 Hour Avr
Kecepatan 20.78 23.53 Km/jam Kecepatan
Truck Count 5 rit x 44 Bcm = 220 Bcm Truck Count
Densitas Material 1.70 Densitas Material
Swell factor 76% Swell factor
fill factor alat muat 101% fill factor alat muat
job efficiency 79% job efficiency
Cycle Time 1,028.2 Second Cycle Time
kapasitas vessel ( ton) 104.57 Ton kapasitas vessel ( ton)
kapasitas vessel ( LCM ) 61.51 LCM kapasitas vessel ( LCM
kapasitas bucket 15 LCM kapasitas bucket
Jumlah pass 4.06 pass Jumlah pass
Productivity 128.86 Bcm/Jam Productivity
Data 3 PT. ARKANANTA APTA PRATISTA Data 4
CYCLE TIME MONITORING of DUMPTRUCK
Day/date : Kamis/18 Juli 2013 Material : Sand stone Day/date
Operator : DEDE Kondisi Front : Sedang Operator
Cuaca : cerah Lokasi Angkut : Pit 01 Cuaca
Excavator Unit : e44 Disposal/Kondisi : Sedang Excavator Unit
Time : 13:30-15:00 Distance 2,366 meter Time

CATERPILLAR 777D HUNGRY BOARD, Unit RD-028 CA

Manuver Travel Manuver Dumping Travel CT tnp


Loading Delay CT Total Ket. RIT
Front Load Disposal Empty Delay
29.56 82.36 430.43 37.12 47.16 403.64 77.04 1,107.3 1,030.3 Second Rit 1
37.08 132.03 392.4 44.26 39.02 411.51 0 1,056.3 1,056.3 Second Rit 2
41.96 103.86 446.68 47.08 41.13 356.99 6.25 1,044.0 1,037.7 Second Rit 3
54.69 131.23 473.79 41.23 39.7 342.77 299.88 1,383.3 1,083.4 Second Rit 4
45.41 123.88 438.07 58.2 34.46 462.58 132.26 1,294.9 1,162.6 Second Rit 5
208.7 573.4 2,181.4 227.9 201.5 1,977.5 515.4 5,885.7 5,370.3 Second Total
41.74 114.67 436.27 45.58 40.29 395.50 103.09 1,177.1 1,074.1 Second Avr
0.01 0.03 0.12 0.01 0.01 0.11 0.03 0.33 0.30 Hour Avr
Kecepatan 19.52 21.54 Km/jam Kecepatan
Truck Count 5 rit x 44 Bcm = 220 Bcm Truck Count
Densitas Material 1.70 Densitas Material
Swell factor 76% Swell factor
fill factor alat muat 101% fill factor alat muat
job efficiency 91% job efficiency
Cycle Time 1,074.1 Second Cycle Time
kapasitas vessel ( ton) 104.57 Ton kapasitas vessel ( ton)
kapasitas vessel ( LCM ) 61.51 LCM kapasitas vessel ( LCM
kapasitas bucket 15 LCM kapasitas bucket
Jumlah pass 4.06 pass Jumlah pass
Productivity 142.97 Bcm/Jam Productivity
Data 4 PT. ARKANANTA APTA PRATISTA
CYCLE TIME MONITORING of DUMPTRUCK
Day/date : Kamis/18 Juli 2013 Material : Sand stone
Operator : DEDE Kondisi Front : Sedang
Cuaca : cerah Lokasi Angkut : Pit 01
Excavator Unit : e44 Disposal/Kondisi : Sedang
Time : 15:00-17:00 Distance 2,379 meter

CATERPILLAR 777D HUNGRY BOARD, Unit RD-028

Manuver Travel Manuver Dumping Travel CT tnp


Loading Delay CT Total Ket.
Front Load Disposal Empty Delay
34.91 159.03 435.4 39.85 40.88 390.13 161.34 1,261.5 1,100.2 Second
33.14 115.02 480.37 37.94 36.09 399.31 385.89 1,487.8 1,101.9 Second
38.82 133.95 451.64 42.21 37.35 493.36 0 1,197.3 1,197.3 Second
28.16 143.57 490.54 22.33 31.47 390.6 602.1 1,708.8 1,106.7 Second
37.12 100.84 427.88 44.81 34.88 399.26 0 1,044.8 1,044.8 Second
172.2 652.4 2,285.8 187.1 180.7 2,072.7 1,149.3 6,700.2 5,550.9 Second
34.43 130.48 457.17 37.43 36.13 414.53 229.87 1,340.0 1,110.2 Second
0.01 0.04 0.13 0.01 0.01 0.12 0.06 0.37 0.31 Hour
Kecepatan 18.73 20.66 Km/jam
Truck Count 5 rit x 44 Bcm = 220 Bcm
Densitas Material 1.70
Swell factor 76%
fill factor alat muat 101%
job efficiency 83%
Cycle Time 1,110.2 Second
kapasitas vessel ( ton) 104.57 Ton
kapasitas vessel ( LCM ) 61.51 LCM
kapasitas bucket 15 LCM
Jumlah pass 4.06 pass
Productivity 125.59 Bcm/Jam
Data 5 PT. ARKANANTA APTA PRATISTA
CYCLE TIME MONITORING of DUMPTRUCK
Day/date : Senin/22 juli 2013 Material : Clay and Sand Stone
Operator : Hendra Kondisi Front : baik
Cuaca : cerah Lokasi Angkut :Pit 01
Excavator Unit : E-44 Disposal/Kondisi :baik
Time : 07:00 - 09:00 Distance 2,509 meter

CATERPILLAR 777D HUNGRY BOARD, Unit RD-028


Manuver Travel Manuver Dumping Travel CT tnp
RIT Loading Delay CT Total Ket.
Front Load Disposal Empty Delay
Rit 1 18.77 69.71 349.02 25.96 30.67 364.15 94.79 953.1 858.3 Second
Rit 2 66.37 130 329 37.35 31.61 372.36 218.4 1,185.1 966.7 Second
Rit 3 40 117.33 383.73 33.25 40.24 362.45 156.68 1,133.7 977.0 Second
Rit 4 27.96 162.84 408.3 31.31 40.99 319.65 138.56 1,129.6 991.1 Second
Rit 5 26.81 98.77 352.36 45.87 34.73 318.2 308.48 1,185.2 876.7 Second
Rit 6 56.59 85.05 390.72 29.67 34.37 322.8 294.32 1,213.5 919.2 Second
Total 236.5 663.7 2,213.1 203.4 212.6 2,059.6 1,211.2 6,800.2 5,589.0 Second
Avr 39.42 110.62 368.86 33.90 35.44 343.27 201.87 1,133.4 931.49 Second
Avr 0.01 0.03 0.10 0.01 0.01 0.10 0.06 0.31 0.26 Hour
Kecepatan 24.49 26.31 Km/jam
Truck Count 6 rit x 44 Bcm = 264 Bcm
Densitas Material 1.70
Swell factor 76%
fill factor alat muat 101%
job efficiency 82%
Cycle Time 931.5 Second
kapasitas vessel ( ton) 104.57 Ton
kapasitas vessel ( LCM ) 61.51 LCM
kapasitas bucket 15 LCM
Jumlah pass 4.06 pass
Productivity 148.49 Bcm/Jam

180.6735
174.7521
161.0456
159.7145
Data 6 PT. ARKANANTA APTA PRATISTA
CYCLE TIME MONITORING of DUMPTRUCK
Day/date : Senin/22 juli 2013 Material : Clay and Sand Stone
Operator : Hendra Kondisi Front : baik
Cuaca : cerah Lokasi Angkut :Pit 01
Excavator Unit : E-44 Disposal/Kondisi :baik
Time : 09:00-11:00 Distance 2,509 meter

CATERPILLAR 777D HUNGRY BOARD, Unit RD-028


Manuver Travel Manuver Dumping Travel CT tnp
RIT Loading Delay CT Total Ket.
Front Load Disposal Empty Delay
Rit 1 35.16 104.09 361.42 28.28 34.72 363.77 61.06 988.5 927.44 Second
Rit 2 30.57 106.37 353.31 32.78 45 404.61 116.95 1,089.6 972.64 Second
Rit 3 30.82 124.19 386.8 42.22 37.08 366.36 205.21 1,192.7 987.47 Second
Rit 4 28.29 108.83 367.34 38.74 41.23 404.64 85.22 1,074.3 989.07 Second
Rit 5 28.55 82.59 371.69 33.17 34.98 370.56 66.21 987.8 921.54 Second
Rit 6 33.73 104.79 415.47 52.64 32.85 340.7 103.55 1,083.7 980.18 Second
Total 187.1 630.9 2,256.0 227.8 225.9 2,250.6 638.2 6,416.5 5,778.3 Second
Avr 31.19 105.14 376.01 37.97 37.64 375.11 106.37 1,069.4 963.06 Second
Avr 0.01 0.03 0.10 0.01 0.01 0.10 0.03 0.30 0.27 Hour
Kecepatan 24.02 24.08 Km/jam
Truck Count 6 rit x 44 Bcm = 264 Bcm
Densitas Material 1.70
Swell factor 76%
fill factor alat muat 101%
job efficiency 90%
Cycle Time 963.1 Second
kapasitas vessel ( ton) 104.57 Ton
kapasitas vessel ( LCM ) 61.51 LCM
kapasitas bucket 15 LCM
Jumlah pass 4.06 pass
Productivity 157.37 Bcm/Jam
Data 7 PT. ARKANANTA APTA PRATISTA
CYCLE TIME MONITORING of DUMPTRUCK
Day/date : Senin/22 juli 2013 Material : Clay and Sand Stone
Operator : Hendra Kondisi Front : baik
Cuaca : cerah Lokasi Angkut :Pit 01
Excavator Unit : E-44 Disposal/Kondisi :baik
Time : 13:00-15:00 Distance 2,509 meter

CATERPILLAR 777D HUNGRY BOARD, Unit RD-028


Manuver Travel Manuver Dumping Travel CT tnp
RIT Loading Delay CT Total Ket.
Front Load Disposal Empty Delay
Rit 1 37.78 97.05 396.34 40.32 40.96 405.58 26.87 1,044.9 1,018.0 Second
Rit 2 46.88 88.17 394.99 37.5 37.59 351.78 151.59 1,108.5 956.9 Second
Rit 3 35.6 112.6 412.49 23.27 32.23 353.54 50.37 1,020.1 969.7 Second
Rit 4 36.04 125.23 485.06 33.33 36.64 385.85 63.84 1,166.0 1,102.2 Second
Rit 5 34.17 120.33 490.19 36.36 42.97 415.47 12.1 1,151.6 1,139.5 Second
Rit 6 33.51 123.09 450.93 42.02 30.6 403.67 153.98 1,237.8 1,083.8 Second
Total 224.0 666.5 2,630.0 212.8 221.0 2,315.9 458.8 6,728.9 6,270.1 Second
Avr 37.33 111.08 438.33 35.47 36.83 385.98 76.46 1,121.5 1,045.0 Second
Avr 0.01 0.03 0.12 0.01 0.01 0.11 0.02 0.31 0.29 Hour
Kecepatan 20.61 23.40 Km/jam
Truck Count 6 rit x 44 Bcm = 264 Bcm
Densitas Material 1.70
Swell factor 76%
fill factor alat muat 101%
job efficiency 93%
Cycle Time 1,045.0 Second
kapasitas vessel ( ton) 104.57 Ton
kapasitas vessel ( LCM ) 61.51 LCM
kapasitas bucket 15 LCM
Jumlah pass 4.06 pass
Productivity 150.07 Bcm/Jam
Data 8 PT. ARKANANTA APTA PRATISTA
CYCLE TIME MONITORING of DUMPTRUCK
Day/date : Senin/22 juli 2013 Material : Clay and Sand Stone
Operator : Hendra Kondisi Front : baik
Cuaca : cerah Lokasi Angkut :Pit 01
Excavator Unit : E-44 Disposal/Kondisi :baik
Time : 15:00-17:00 Distance 2,529 meter

CATERPILLAR 777D HUNGRY BOARD, Unit RD-028


Manuver Travel Manuver Dumping Travel CT tnp
RIT Loading Delay CT Total Ket.
Front Load Disposal Empty Delay
Rit 1 22.72 157.33 492.63 54.7 32.07 414.87 0 1,174.3 1,174.3 Second
Rit 2 21.99 99.63 457.52 34.38 36.59 424.2 136.57 1,210.9 1,074.3 Second
Rit 3 22.12 108.3 464.71 39.23 41.38 441.12 6.68 1,123.5 1,116.9 Second
Rit 4 25.23 118.65 423.82 27.6 29.46 349.72 19.81 994.3 974.5 Second
Rit 5 33.28 117.35 421.75 36.71 28.54 376.79 258.25 1,272.7 1,014.4 Second
Rit 6 31.97 116.24 400.37 25.16 30.35 363.91 0 968.0 968.0 Second
Total 157.3 717.5 2,660.8 217.8 198.4 2,370.6 421.3 6,743.7 6,322.4 Second
Avr 26.22 119.58 443.47 36.30 33.07 395.10 70.22 1,124.0 1,053.7 Second
Avr 0.01 0.03 0.12 0.01 0.01 0.11 0.02 0.31 0.29 Hour
Kecepatan 20.53 23.04 Km/jam
Truck Count 6 rit x 44 Bcm = 264 Bcm
Densitas Material 1.70
Swell factor 76%
fill factor alat muat 101%
job efficiency 94%
Cycle Time 1,053.7 Second
kapasitas vessel ( ton) 104.57 Ton
kapasitas vessel ( LCM ) 61.51 LCM
kapasitas bucket 15 LCM
Jumlah pass 4.06 pass
Productivity 149.74 Bcm/Jam
Data 9 PT. ARKANANTA APTA PRATISTA Data 10
CYCLE TIME MONITORING OF DUMPTRUCK
Day/date : Sabtu, 20 July 2013 Material : Clay Masive (No Ripping) Day/date
Orerator : Hendra Kondisi Front : Sedang Orerator
Cuaca : Cerah Lokasi Angkut : Pit 1 Cuaca
Exavator : E-042 Kondisi Disposal : WD 4 Exavator
Time : 07:00-08:35 Distance : 1743 meter Time
CATERPILLAR 777D HUNGRY BOARD, Unit RD-028
Manufer Travel Manuver Dumpin Travel Waktu Waktu
Rit Loading Delay Ket. Rit
Front Load Disposal g Empety Kerja Efesien
1 63.01 176.02 359.18 23.22 34.48 289.57 816.46 1761.94 945.48 Second 1
2 32.75 176.02 396.78 29.33 44.20 269.48 207.65 1156.21 948.56 Second 2
3 51.48 107.31 390.83 24.04 39.09 268.34 54.18 935.27 881.09 Second 3
4 16.63 105.28 374.42 24.66 33.28 241.97 152.90 949.14 796.24 Second 4
5 21.88 100.63 416.61 13.37 27.23 265.78 6.90 852.40 845.50 Second 5
Total 185.75 665.26 1937.82 114.62 178.28 1335.14 1238.09 5654.96 4416.87 Second Total
Avr 37.15 133.05 387.56 22.92 35.66 267.03 247.62 1130.99 883.37 Second Avr
Avr 0.01 0.04 0.11 0.01 0.01 0.07 0.07 0.31 0.25 Hour Avr
Kecepatan 16.19 23.50 Km/Jam Kecepatan
Truck Count 5 Rit x 40 = 200 Bcm Truck Count
Densitas Material 1.70 Densitas Mat
Swell factor 76% Swell factor
fill factor alat muat 96% fill factor ala
job efficiency 78% job efficiency
Cycle Time 883.4 Second Cycle Time
kapasitas vessel ( ton) 104.57 Ton kapasitas ves
kapasitas vessel ( LCM ) 61.51 LCM kapasitas ves
kapasitas bucket 12 LCM kapasitas buc
Jumlah pass 5.34 pass Jumlah pass
Productivity 148.80 Bcm/Jam Productivity

190.5152
199.1991
186.7872
186.1004
198.8729
185.3303
Data 10 PT. ARKANANTA APTA PRATISTA Data 11
CYCLE TIME MONITORING OF DUMPTRUCK
Day/date : Sabtu, 20 July 2013 Material : Clay Masive (No Ripping) Day/date
Orerator : Hendra Kondisi Front : Sedang Orerator
Cuaca : Cerah Lokasi Angkut : Pit 1 Cuaca
Exavator : E-042 Kondisi Disposal : WD 4 Exavator
Time : 08:35 - 10:00 Distance : 1743 meter Time
CATERPILLAR 777D HUNGRY BOARD, Unit RD-028 C
Manufer Travel Manuver Dumpin Travel Waktu Waktu
Loading Delay Ket. Rit
Front Load Disposal g Empety Kerja Efesien
13.84 120.46 368.99 24.80 29.70 271.56 213.33 1042.68 829.35 Second 1
32.75 144.00 339.18 12.13 36.81 278.05 319.95 1162.87 842.92 Second 2
54.76 110.93 389.72 23.02 41.11 311.65 206.24 1137.43 931.19 Second 3
22.66 179.71 355.70 21.80 48.72 289.34 632.34 1550.27 917.93 Second 4
55.55 162.84 378.89 18.89 48.72 38.04 408.42 1111.35 702.93 Second 5
179.56 717.94 1832.48 100.64 205.06 1188.64 1780.28 6004.60 4224.32 Second 6
35.91 143.59 366.50 20.13 41.01 237.73 356.06 1200.92 844.86 Second Total
0.01 0.04 0.10 0.01 0.01 0.07 0.10 0.33 0.23 Hour Avr
Kecepatan 17.12 26.39 Km/Jam Avr
Truck Count 5 Rit x 40 = 200 Bcm Kecepatan
Densitas Material 1.70 Truck Count
Swell factor 76% Densitas Material
fill factor alat muat 96% Swell factor
job efficiency 70% fill factor alat muat
Cycle Time 844.9 Second job efficiency
kapasitas vessel ( ton) 104.57 Ton Cycle Time
kapasitas vessel ( LCM ) 61.51 LCM kapasitas vessel ( to
kapasitas bucket 12 LCM kapasitas vessel ( LC
Jumlah pass 5.34 pass kapasitas bucket
Productivity 140.14 Bcm/Jam Jumlah pass
Productivity
Data 11 PT. ARKANANTA APTA PRATISTA Data 12
CYCLE TIME MONITORING OF DUMPTRUCK
Day/date : Sabtu, 20 July 2013 Material : Clay Masive (No Ripping) Day/date
Orerator : Hendra Kondisi Front : Sedang Orerator
Cuaca : Cerah Lokasi Angkut : Pit 1 Cuaca
Exavator : E-042 Kondisi Disposal : WD 4 Exavator
Time : 10:00 - 11:43 Distance : 1743 meter Time
CATERPILLAR 777D HUNGRY BOARD, Unit RD-028 C
Manufer Travel Manuver Dumpin Travel Waktu Waktu
Loading Delay Ket. Rit
Front Load Disposal g Empety Kerja Efesien
17.39 127.51 393.26 58.10 45.10 274.18 308.64 1224.18 915.54 Second 1
37.96 132.74 409.81 16.23 36.79 286.72 39.99 960.24 920.25 Second 2
33.16 94.91 383.37 32.07 30.76 274.99 17.59 866.85 849.26 Second 3
41.53 103.45 379.03 25.93 41.04 279.32 0.00 870.30 870.30 Second 4
60.38 131.96 388.61 19.67 41.12 293.40 120.92 1056.06 935.14 Second 5
17.39 127.51 393.26 58.10 45.10 274.18 308.64 1224.18 915.54 Second Total
207.81 718.08 2347.34 210.10 239.91 1682.79 795.78 6201.81 5406.03 Second Avr
34.64 119.68 391.22 35.02 39.99 280.47 132.63 1033.64 901.01 Second Avr
0.01 0.03 0.11 0.01 0.01 0.08 0.04 0.29 0.25 Hour Kecepatan
Kecepatan 16.03892 22.37285 Km/Jam Truck Count
Truck Count 6 Rit x 40 = 240 Bcm Densitas Material
Densitas Material 1.70 Swell factor
Swell factor 76% fill factor alat muat
fill factor alat muat 96% job efficiency
job efficiency 87% Cycle Time
Cycle Time 901.0 Second kapasitas vessel ( to
kapasitas vessel ( ton) 104.57 Ton kapasitas vessel ( LC
kapasitas vessel ( LCM ) 61.51 LCM kapasitas bucket
kapasitas bucket 12 LCM Jumlah pass
Jumlah pass 5.34 pass Productivity
Productivity 162.82 Bcm/Jam
Data 12 PT. ARKANANTA APTA PRATISTA Data 13
CYCLE TIME MONITORING OF DUMPTRUCK
Day/date : Sabtu, 20 July 2013 Material : Clay Masive (No Ripping) Day/date
Orerator : Hendra Kondisi Front : Sedang Orerator
Cuaca : Cerah Lokasi Angkut : Pit 1 Cuaca
Exavator : E-042 Kondisi Disposal : WD 4 Exavator
Time : 13:00 -14:20 Distance : 1618 meter Time
CATERPILLAR 777D HUNGRY BOARD, Unit RD-028 C
Manufer Travel Manuver Dumpin Travel Waktu Waktu
Loading Delay Ket. Rit
Front Load Disposal g Empety Kerja Efesien
37.96 132.74 409.81 16.23 36.79 286.72 39.99 960.24 920.25 Second 1
33.16 94.91 383.37 32.07 30.76 274.99 17.59 866.85 849.26 Second 2
41.53 103.45 379.03 25.93 41.04 279.32 0.00 870.30 870.30 Second 3
60.38 131.96 388.61 19.67 41.12 293.40 120.92 1056.06 935.14 Second 4
45.53 123.25 387.42 10.08 46.12 334.30 106.72 1053.42 946.70 Second 5
218.56 586.31 1948.24 103.98 195.83 1468.73 285.22 4806.87 4521.65 Second Total
43.71 117.26 389.65 20.80 39.17 293.75 57.04 961.37 904.33 Second Avr
0.01 0.03 0.11 0.01 0.01 0.08 0.02 0.27 0.25 Hour Avr
Kecepatan 14.95 19.83 Km/Jam Kecepatan
Truck Count 5 Rit x 40 = 200 Bcm Truck Count
Densitas Material 1.70 Densitas Material
Swell factor 76% Swell factor
fill factor alat muat 96% fill factor alat muat
job efficiency 94% job efficiency
Cycle Time 904.3 Second Cycle Time
kapasitas vessel ( ton) 104.57 Ton kapasitas vessel ( to
kapasitas vessel ( LCM ) 61.51 LCM kapasitas vessel ( LC
kapasitas bucket 12 LCM kapasitas bucket
Jumlah pass 5.34 pass Jumlah pass
Productivity 175.06 Bcm/Jam Productivity
Data 13 PT. ARKANANTA APTA PRATISTA Data 14
CYCLE TIME MONITORING OF DUMPTRUCK
Day/date : Sabtu, 20 July 2013 Material : Clay Masive (No Ripping) Day/date
Orerator : Hendra Kondisi Front : Sedang Orerator
Cuaca : Cerah Lokasi Angkut : Pit 1 Cuaca
Exavator : E-042 Kondisi Disposal : WD 4 Exavator
Time : 14:20 - 15:55 Distance : 1618 meter Time
CATERPILLAR 777D HUNGRY BOARD, Unit RD-028 C
Manufer Travel Manuver Dumpin Travel Waktu Waktu
Loading Delay Ket. Rit
Front Load Disposal g Empety Kerja Efesien
48.12 137.20 394.96 21.80 47.49 318.60 49.50 1017.67 968.17 Second 1
41.51 128.73 341.17 12.40 39.06 249.83 592.03 1404.73 812.70 Second 2
39.21 101.17 334.39 21.84 44.40 231.83 227.78 1000.62 772.84 Second 3
40.00 137.16 334.39 46.85 48.08 227.51 284.88 1118.87 833.99 Second 4
34.90 146.55 342.62 47.99 32.80 238.69 369.79 1213.34 843.55 Second 5
203.74 650.81 1747.53 150.88 211.83 1266.46 1523.98 5755.23 4231.25 Second Total
40.75 130.16 349.51 30.18 42.37 253.29 304.80 1151.05 846.25 Second Avr
0.01 0.04 0.10 0.01 0.01 0.07 0.08 0.32 0.24 Hour Avr
Kecepatan 16.67 23.00 Km/Jam Kecepatan
Truck Count 5 Rit x 40 = 200 Bcm Truck Count
Densitas Material 1.70 Densitas Material
Swell factor 76% Swell factor
fill factor alat muat 96% fill factor alat muat
job efficiency 74% job efficiency
Cycle Time 846.3 Second Cycle Time
kapasitas vessel ( ton) 104.57 Ton kapasitas vessel ( to
kapasitas vessel ( LCM ) 61.51 LCM kapasitas vessel ( LC
kapasitas bucket 12 LCM kapasitas bucket
Jumlah pass 5.34 pass Jumlah pass
Productivity 146.21 Bcm/Jam Productivity
Data 14 PT. ARKANANTA APTA PRATISTA
CYCLE TIME MONITORING OF DUMPTRUCK
Day/date : Sabtu, 20 July 2013 Material : Clay Masive (No Ripping)
Orerator : Hendra Kondisi Front : Sedang
Cuaca : Cerah Lokasi Angkut : Pit 1
Exavator : E-042 Kondisi Disposal : WD 4
Time : 15:55 - 17:30 Distance : 1618 meter
CATERPILLAR 777D HUNGRY BOARD, Unit RD-028
Manufer Travel Manuver Dumpin Travel Waktu Waktu
Loading Delay Ket.
Front Load Disposal g Empety Kerja Efesien
42.62 192.76 362.52 25.46 41.46 324.46 241.48 1230.76 989.28 Second
60.07 112.46 325.66 59.95 44.08 232.64 249.35 1084.21 834.86 Second
60.07 137.71 356.75 62.06 46.10 251.37 169.42 1083.48 914.06 Second
55.46 114.88 387.76 37.33 27.88 330.90 252.73 1206.94 954.21 Second
51.63 118.18 352.33 40.94 47.83 237.12 289.95 1137.98 848.03 Second
269.85 675.99 1785.02 225.74 207.35 1376.49 1202.93 5743.37 4540.4 Second
53.97 135.20 357.00 45.15 41.47 275.30 240.59 1148.67 908.09 Second
0.01 0.04 0.10 0.01 0.01 0.08 0.07 0.32 0.25 Hour
Kecepatan 16.32 21.16 Km/Jam
Truck Count 5 Rit x 40 = 200 Bcm
Densitas Material 1.70
Swell factor 76%
fill factor alat muat 96%
job efficiency 79%
Cycle Time 908.1 Second
kapasitas vessel ( ton) 104.57 Ton
kapasitas vessel ( LCM ) 61.51 LCM
kapasitas bucket 12 LCM
Jumlah pass 5.34 pass
Productivity 146.51 Bcm/Jam
PT. MANDALA KARYA PRIMA
DATA CYCLE TIME UNTUK ALAT ANGKUT (MENIT)
KOMATSU HD-785, NOMOR

Manufer Travel Manuver Travel


No. Data Loading Dumping Delay Total
Front Load Disposal Empety

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
11 11
12 12
13 13
14 14
15 15
16 16
17 17
18 18
19 19
20 20
21 21
22 22
23 23
24 24
25 25
26 26
27 27
28 28
29 29
30 30
31 31
32 32
33 33
TOTAL - - - - - - - -
Average #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
Average Ct
sum ct
Average productivity
T)

Distance (
km )

#REF! -
#REF! #DIV/0!
#REF! Second
#REF! Second
#REF! Bcm/jam
141.84
154.06
147.48 0.76
142.68
170.05 DS 1.7 2.24
164.48 FF 101% 46.74894
151.58 SF 0.76
150.32 Kb 15 LCM 11.4
163.01 KV 61.51176 LCM 46.68304 61.42505
170.44 KV 104.57 ton
159.82 jmlh pas 4.061122 4.055397
159.23
170.16 catatan loose
127.116 benk
155.1619 rata2
150.4866

0.76