Data 6 PT. ARKANANTA APTA PRATISTA
CYCLE TIME MONITORING of DUMPTRUCK
Day/date : Senin/22 juli 2013 Material : Clay and Sand Stone
Operator : Hendra Kondisi Front : baik
Cuaca : cerah Lokasi Angkut :Pit 01
Excavator Unit : E-44 Disposal/Kondisi :baik
Time : 09:00-11:00 Distance 2,509 meter
190.5152
199.1991
186.7872
186.1004
198.8729
185.3303
Data 10 PT. ARKANANTA APTA PRATISTA Data 11
CYCLE TIME MONITORING OF DUMPTRUCK
Day/date : Sabtu, 20 July 2013 Material : Clay Masive (No Ripping) Day/date
Orerator : Hendra Kondisi Front : Sedang Orerator
Cuaca : Cerah Lokasi Angkut : Pit 1 Cuaca
Exavator : E-042 Kondisi Disposal : WD 4 Exavator
Time : 08:35 - 10:00 Distance : 1743 meter Time
CATERPILLAR 777D HUNGRY BOARD, Unit RD-028 C
Manufer Travel Manuver Dumpin Travel Waktu Waktu
Loading Delay Ket. Rit
Front Load Disposal g Empety Kerja Efesien
13.84 120.46 368.99 24.80 29.70 271.56 213.33 1042.68 829.35 Second 1
32.75 144.00 339.18 12.13 36.81 278.05 319.95 1162.87 842.92 Second 2
54.76 110.93 389.72 23.02 41.11 311.65 206.24 1137.43 931.19 Second 3
22.66 179.71 355.70 21.80 48.72 289.34 632.34 1550.27 917.93 Second 4
55.55 162.84 378.89 18.89 48.72 38.04 408.42 1111.35 702.93 Second 5
179.56 717.94 1832.48 100.64 205.06 1188.64 1780.28 6004.60 4224.32 Second 6
35.91 143.59 366.50 20.13 41.01 237.73 356.06 1200.92 844.86 Second Total
0.01 0.04 0.10 0.01 0.01 0.07 0.10 0.33 0.23 Hour Avr
Kecepatan 17.12 26.39 Km/Jam Avr
Truck Count 5 Rit x 40 = 200 Bcm Kecepatan
Densitas Material 1.70 Truck Count
Swell factor 76% Densitas Material
fill factor alat muat 96% Swell factor
job efficiency 70% fill factor alat muat
Cycle Time 844.9 Second job efficiency
kapasitas vessel ( ton) 104.57 Ton Cycle Time
kapasitas vessel ( LCM ) 61.51 LCM kapasitas vessel ( to
kapasitas bucket 12 LCM kapasitas vessel ( LC
Jumlah pass 5.34 pass kapasitas bucket
Productivity 140.14 Bcm/Jam Jumlah pass
Productivity
Data 11 PT. ARKANANTA APTA PRATISTA Data 12
CYCLE TIME MONITORING OF DUMPTRUCK
Day/date : Sabtu, 20 July 2013 Material : Clay Masive (No Ripping) Day/date
Orerator : Hendra Kondisi Front : Sedang Orerator
Cuaca : Cerah Lokasi Angkut : Pit 1 Cuaca
Exavator : E-042 Kondisi Disposal : WD 4 Exavator
Time : 10:00 - 11:43 Distance : 1743 meter Time
CATERPILLAR 777D HUNGRY BOARD, Unit RD-028 C
Manufer Travel Manuver Dumpin Travel Waktu Waktu
Loading Delay Ket. Rit
Front Load Disposal g Empety Kerja Efesien
17.39 127.51 393.26 58.10 45.10 274.18 308.64 1224.18 915.54 Second 1
37.96 132.74 409.81 16.23 36.79 286.72 39.99 960.24 920.25 Second 2
33.16 94.91 383.37 32.07 30.76 274.99 17.59 866.85 849.26 Second 3
41.53 103.45 379.03 25.93 41.04 279.32 0.00 870.30 870.30 Second 4
60.38 131.96 388.61 19.67 41.12 293.40 120.92 1056.06 935.14 Second 5
17.39 127.51 393.26 58.10 45.10 274.18 308.64 1224.18 915.54 Second Total
207.81 718.08 2347.34 210.10 239.91 1682.79 795.78 6201.81 5406.03 Second Avr
34.64 119.68 391.22 35.02 39.99 280.47 132.63 1033.64 901.01 Second Avr
0.01 0.03 0.11 0.01 0.01 0.08 0.04 0.29 0.25 Hour Kecepatan
Kecepatan 16.03892 22.37285 Km/Jam Truck Count
Truck Count 6 Rit x 40 = 240 Bcm Densitas Material
Densitas Material 1.70 Swell factor
Swell factor 76% fill factor alat muat
fill factor alat muat 96% job efficiency
job efficiency 87% Cycle Time
Cycle Time 901.0 Second kapasitas vessel ( to
kapasitas vessel ( ton) 104.57 Ton kapasitas vessel ( LC
kapasitas vessel ( LCM ) 61.51 LCM kapasitas bucket
kapasitas bucket 12 LCM Jumlah pass
Jumlah pass 5.34 pass Productivity
Productivity 162.82 Bcm/Jam
Data 12 PT. ARKANANTA APTA PRATISTA Data 13
CYCLE TIME MONITORING OF DUMPTRUCK
Day/date : Sabtu, 20 July 2013 Material : Clay Masive (No Ripping) Day/date
Orerator : Hendra Kondisi Front : Sedang Orerator
Cuaca : Cerah Lokasi Angkut : Pit 1 Cuaca
Exavator : E-042 Kondisi Disposal : WD 4 Exavator
Time : 13:00 -14:20 Distance : 1618 meter Time
CATERPILLAR 777D HUNGRY BOARD, Unit RD-028 C
Manufer Travel Manuver Dumpin Travel Waktu Waktu
Loading Delay Ket. Rit
Front Load Disposal g Empety Kerja Efesien
37.96 132.74 409.81 16.23 36.79 286.72 39.99 960.24 920.25 Second 1
33.16 94.91 383.37 32.07 30.76 274.99 17.59 866.85 849.26 Second 2
41.53 103.45 379.03 25.93 41.04 279.32 0.00 870.30 870.30 Second 3
60.38 131.96 388.61 19.67 41.12 293.40 120.92 1056.06 935.14 Second 4
45.53 123.25 387.42 10.08 46.12 334.30 106.72 1053.42 946.70 Second 5
218.56 586.31 1948.24 103.98 195.83 1468.73 285.22 4806.87 4521.65 Second Total
43.71 117.26 389.65 20.80 39.17 293.75 57.04 961.37 904.33 Second Avr
0.01 0.03 0.11 0.01 0.01 0.08 0.02 0.27 0.25 Hour Avr
Kecepatan 14.95 19.83 Km/Jam Kecepatan
Truck Count 5 Rit x 40 = 200 Bcm Truck Count
Densitas Material 1.70 Densitas Material
Swell factor 76% Swell factor
fill factor alat muat 96% fill factor alat muat
job efficiency 94% job efficiency
Cycle Time 904.3 Second Cycle Time
kapasitas vessel ( ton) 104.57 Ton kapasitas vessel ( to
kapasitas vessel ( LCM ) 61.51 LCM kapasitas vessel ( LC
kapasitas bucket 12 LCM kapasitas bucket
Jumlah pass 5.34 pass Jumlah pass
Productivity 175.06 Bcm/Jam Productivity
Data 13 PT. ARKANANTA APTA PRATISTA Data 14
CYCLE TIME MONITORING OF DUMPTRUCK
Day/date : Sabtu, 20 July 2013 Material : Clay Masive (No Ripping) Day/date
Orerator : Hendra Kondisi Front : Sedang Orerator
Cuaca : Cerah Lokasi Angkut : Pit 1 Cuaca
Exavator : E-042 Kondisi Disposal : WD 4 Exavator
Time : 14:20 - 15:55 Distance : 1618 meter Time
CATERPILLAR 777D HUNGRY BOARD, Unit RD-028 C
Manufer Travel Manuver Dumpin Travel Waktu Waktu
Loading Delay Ket. Rit
Front Load Disposal g Empety Kerja Efesien
48.12 137.20 394.96 21.80 47.49 318.60 49.50 1017.67 968.17 Second 1
41.51 128.73 341.17 12.40 39.06 249.83 592.03 1404.73 812.70 Second 2
39.21 101.17 334.39 21.84 44.40 231.83 227.78 1000.62 772.84 Second 3
40.00 137.16 334.39 46.85 48.08 227.51 284.88 1118.87 833.99 Second 4
34.90 146.55 342.62 47.99 32.80 238.69 369.79 1213.34 843.55 Second 5
203.74 650.81 1747.53 150.88 211.83 1266.46 1523.98 5755.23 4231.25 Second Total
40.75 130.16 349.51 30.18 42.37 253.29 304.80 1151.05 846.25 Second Avr
0.01 0.04 0.10 0.01 0.01 0.07 0.08 0.32 0.24 Hour Avr
Kecepatan 16.67 23.00 Km/Jam Kecepatan
Truck Count 5 Rit x 40 = 200 Bcm Truck Count
Densitas Material 1.70 Densitas Material
Swell factor 76% Swell factor
fill factor alat muat 96% fill factor alat muat
job efficiency 74% job efficiency
Cycle Time 846.3 Second Cycle Time
kapasitas vessel ( ton) 104.57 Ton kapasitas vessel ( to
kapasitas vessel ( LCM ) 61.51 LCM kapasitas vessel ( LC
kapasitas bucket 12 LCM kapasitas bucket
Jumlah pass 5.34 pass Jumlah pass
Productivity 146.21 Bcm/Jam Productivity
Data 14 PT. ARKANANTA APTA PRATISTA
CYCLE TIME MONITORING OF DUMPTRUCK
Day/date : Sabtu, 20 July 2013 Material : Clay Masive (No Ripping)
Orerator : Hendra Kondisi Front : Sedang
Cuaca : Cerah Lokasi Angkut : Pit 1
Exavator : E-042 Kondisi Disposal : WD 4
Time : 15:55 - 17:30 Distance : 1618 meter
CATERPILLAR 777D HUNGRY BOARD, Unit RD-028
Manufer Travel Manuver Dumpin Travel Waktu Waktu
Loading Delay Ket.
Front Load Disposal g Empety Kerja Efesien
42.62 192.76 362.52 25.46 41.46 324.46 241.48 1230.76 989.28 Second
60.07 112.46 325.66 59.95 44.08 232.64 249.35 1084.21 834.86 Second
60.07 137.71 356.75 62.06 46.10 251.37 169.42 1083.48 914.06 Second
55.46 114.88 387.76 37.33 27.88 330.90 252.73 1206.94 954.21 Second
51.63 118.18 352.33 40.94 47.83 237.12 289.95 1137.98 848.03 Second
269.85 675.99 1785.02 225.74 207.35 1376.49 1202.93 5743.37 4540.4 Second
53.97 135.20 357.00 45.15 41.47 275.30 240.59 1148.67 908.09 Second
0.01 0.04 0.10 0.01 0.01 0.08 0.07 0.32 0.25 Hour
Kecepatan 16.32 21.16 Km/Jam
Truck Count 5 Rit x 40 = 200 Bcm
Densitas Material 1.70
Swell factor 76%
fill factor alat muat 96%
job efficiency 79%
Cycle Time 908.1 Second
kapasitas vessel ( ton) 104.57 Ton
kapasitas vessel ( LCM ) 61.51 LCM
kapasitas bucket 12 LCM
Jumlah pass 5.34 pass
Productivity 146.51 Bcm/Jam
PT. MANDALA KARYA PRIMA
DATA CYCLE TIME UNTUK ALAT ANGKUT (MENIT)
KOMATSU HD-785, NOMOR
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
11 11
12 12
13 13
14 14
15 15
16 16
17 17
18 18
19 19
20 20
21 21
22 22
23 23
24 24
25 25
26 26
27 27
28 28
29 29
30 30
31 31
32 32
33 33
TOTAL - - - - - - - -
Average #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
Average Ct
sum ct
Average productivity
T)
Distance (
km )
#REF! -
#REF! #DIV/0!
#REF! Second
#REF! Second
#REF! Bcm/jam
141.84
154.06
147.48 0.76
142.68
170.05 DS 1.7 2.24
164.48 FF 101% 46.74894
151.58 SF 0.76
150.32 Kb 15 LCM 11.4
163.01 KV 61.51176 LCM 46.68304 61.42505
170.44 KV 104.57 ton
159.82 jmlh pas 4.061122 4.055397
159.23
170.16 catatan loose
127.116 benk
155.1619 rata2
150.4866
0.76