You are on page 1of 2

STRIPPING OB

Produktivitas Produktifitas Perbulan


Unit Jumlah Unit Produktifitas Perhari (BCM)
(M3/jam) (BCM)
PC 200 3 122
4380 129.532
DOZER D65 1 123

ORE GETTING
Produktivitas
Unit Jumlah Unit Produktifitas Perhari (MT) Produktifitas Perbulan (MT)
(Bcm/jam) (Ton/jam)
PC 200 1 112 169
1778 52.660
PC 200 1 SUPPORT ORE GETTING/LOADING ORE

HAULING ORE EFO 6


Loaded Weight Produktivitas
Unit Jumlah Unit Cycle Time (min) Distance (km) Produktifitas Perhari (MT) Produktifitas Perbulan (MT)
Ton/Trip (Ton/jam)
Dump Truck 5 23.45 3.50 14 39.00
1154 33.852
PC 200 1 SUPPORT TRIMMING ORE ON DOME

MATCH FACTOR 0.65


HAULING ORE 2
Loaded Weight Produktivitas
Unit Jumlah Unit Cycle Time (min) Distance (km) Produktifitas Perhari (MT) Produktifitas Perbulan (MT)
Ton/Trip (Ton/jam)
Dump Truck 10 56.88 12.50 14 14
829 24.034
PC 200 1 SUPPORT TRIMMING ORE ON DOME
MATCH FACTOR 0.47

PLAN EQUIPMENT 40.000 - 50.000


Estimasi Cadangan Block Model TOTAL VOL TOTAL (MT) RATIO NO EQUIPMENT TOTAL
OB 166,463 249,695 1 Exca Ore 2 UNIT
2.8
Cadangan Ore 40,244 60,366 2 Exca Ob 3 UNIT
3 DOZER D65 1 UNIT
AREA TOTAL OB (BCM) TOTAL OB (BCM) RECOVERY 90% 4 DT EFO 2 5 UNIT
STRIPPING OB 129.532 5 DT EFO 6 10 UNIT
129.532 116.579
-
Balence Equipment Unit Pit 3D
AREA PRODUKSI TOTAL ORE (MT) TOTAL ORE (MT) RECOVERY 80% NO EQUIPMENT TOTAL
1 Exca Ore 3 UNIT
PIT 52.660 52.660 42.128
2 Exca Ob 4 UNIT
3 DOZER D85SS 1 UNIT
*Note : - Tonase/DT disesuaikan actual muatan 10 Bucket 4 DT 15 UNIT
5 SPARE DT 2 UNIT
STRIPPING OB
Produktivitas Produktifitas Perbulan
Unit Jumlah Unit Produktifitas Perhari (BCM)
(M3/jam) (BCM)
PC 200 3 122
4380 129.532
DOZER D65 1 123

ORE GETTING
Produktivitas
Unit Jumlah Unit Produktifitas Perhari (MT) Produktifitas Perbulan (MT)
(Bcm/jam) (Ton/jam)
PC 200 1 112 169
1778 52.660
PC 200 1 SUPPORT ORE GETTING/LOADING ORE

HAULING ORE EFO 6


Loaded Weight Produktivitas
Unit Jumlah Unit Cycle Time (min) Distance (km) Produktifitas Perhari (MT) Produktifitas Perbulan (MT)
Ton/Trip (Ton/jam)
Dump Truck 12 23.45 3.50 14 39.00
2771 81.244
PC 200 1 SUPPORT TRIMMING ORE ON DOME
MATCH FACTOR 1.56

PLAN EQUIPMENT 40.000 - 50.000


Estimasi Cadangan Block Model TOTAL VOL TOTAL (MT) RATIO NO EQUIPMENT TOTAL
OB 166,463 249,695 1 Exca Ore 2 UNIT
2.8
Cadangan Ore 40,244 60,366 2 Exca Ob 3 UNIT
3 DOZER D65 1 UNIT
AREA TOTAL OB (BCM) TOTAL OB (BCM) RECOVERY 90% 4 DT EFO 2 12 UNIT
STRIPPING OB 129.532
129.532 116.579
- Balence Equipment Unit Pit 3D
NO EQUIPMENT TOTAL
AREA PRODUKSI TOTAL ORE (MT) TOTAL ORE (MT) RECOVERY 80% 1 Exca Ore 3 UNIT
2 Exca Ob 4 UNIT
PIT 52.660 52.660 42.128
3 DOZER D85SS 1 UNIT
4 DT 12 UNIT
*Note : - Tonase/DT disesuaikan actual muatan 10 Bucket