SHIFT REPORT
PT. Bakti Pertiwi Nusantara Site Sepo PT. Djava Berkah Mineral
SHIFT 1 (Day Shift) 15/10/2022
SHIFT 1 PRODUCTION REPORT HEAVY EQUIPMENT & MANPOWER
ACTIVITY PLAN EXISTING UNIT ACH. (%) Model EQ Class Populasi RFU BD MP Deviasi
OB Removal (Bcm) 2.882 889 31 Exca 300 Loader 5 3 2 3 -2
Ore Getting (Ton) 2.880 1.100 38 Exca 200 Loader 7 5 2 5 -2
Hauling ETO- EFO (Ton) 2.765 1.113 40 DT 20 Ton Hauler 26 26 0 18 -8
Barging (Ton) 7.875 7.875 100 Dozer 85 SS Unit Support 2 2 0 1 -1
Breaker Unit Support 1 1 0 1 0
REVIEW SHIFT 1 PRODUCTION REPORT Grader Unit Support 2 1 1 1 0
ACTIVITY PLAN ACTUAL ACH. (%) Vibro Case Unit Support 2 2 0 1 -1
OB Removal (Bcm) 889 0 0 Fuel Truck Unit Support 2 2 0 1 -1
Ore Getting (Ton) 1.100 0 0 Water Truck Unit Support 1 1 0 1 0
Hauling ETO- EFO (Ton) 1.113 0 0
Barging (Ton) - 0 0
Remarks : Update 14 Oktober (Shift 1)