PAMAPERSADA NUSANTARA
DISTRICT AREM - ARUTMIN, SATUI - KALIMANTAN SELATAN
SUMMARY PRODUCTION ARIA EAST MULIA
03 November 2018
01. Summary Production
DAILY MTD REMAINING REMAINING/DAY
ACTIVITY REMARK
Plan Site Plan WO Actual Ach. Site Ach. WO Plan IBS Plan Site Actual Ach. IBS Ach. Site IBS SITE IBS SITE
OB 30,031 35,922 49,565 165% 138% 97,792 90,092 97,518 100% 1.08242445
Mud - - - -
TS Inpit - - - - -
TS Outpit - - - -
Daywork 2,566 - 6,289 7,699 16,154 210% 60,840 2,253
OB 30,031 35,922 49,565 165% 138% 90,092 90,092 97,518 108% 108% 803,404 803,404 29,756 29,756
Total OB+Daywork (Bcm) 32,597 35,922 55,854 171% 155% 97,792 97,792 113,672 116% 116% 987,387 864,244 36,570 32,009 OK
Coal Pit to Rom 1,269 1,978
Coal Pit to Port 6,512 11,894
Coal Rom to Port 2,789 10,945
Coal Mining Pit 4 5,332 3,909 4,334 81% 111% 15,997 15,997 9,406 59% 59%
Coal Mining Pit 7 4,595 3,369 3,448 75% 102% 13,785 13,785 4,467 32% 32%
Total Coal Hauling 9,301 22,839
Total Coal Mining (Ton) 9,872 7,238 7,781 79% 108% 29,617 29,617 13,872 47% 47% 282,300 282,300 10,456 10,456 OK
* Remark terhadap Plan WO Mineplan
Daily Actual
1,500,000 60,000
MTD Plan Site 1,200,000
900,000 40,000
04. Proporsi Material 05. Produksi Per Shift 06. Distance 07. SR Monitoring 08. Outlook
Daily MTD TODAY MTD
Loader ACTIVITY Distance SR Daily Monthly Waste Removal Coal Mining
ON MD ON MD Shift 1 Shift 2 Shift 1 Shift 2
EX1045 50.00% 50.00% 51.32% 48.68% OB 26,432 23,133 56,937 40,581 Shift 1 1,876 Plan 3.042 3.042 907,822.22 145,616.21
EX1112 100.00% 0.00% 100.00% 0.00% OB Daywwork 2,927 3,363 7,884 8,271 Shift 2 1,867 Actual 6.370 7.030
EX1143 84.80% 15.20% 85.39% 14.61% OB+Daywork 29,359 26,496 64,821 48,852 Daily 1,872
EX1064 100.00% 0.00% 100.00% 0.00% Coal Mining 2,143 5,638 7,103 6,770 * Jarak Include Daywork Eks Peti
EX1091 100.00% 0.00% 100.00% 0.00%
EX2313 0.00% 0.00% #DIV/0! #DIV/0!
EX2319 100.00% 0.00% 100.00% 0.00%
EX2325 100.00% 0.00% 100.00% 0.00%
Proporsi All Daywork 88.74% 12.69% #DIV/0! #DIV/0!
EX1112 (Pit7) OP 510 0.00 0 3(HD785) 510 0.00 0 3(HD785) 0 0 S1: Front sempit, S2: Front amblas
ON 510 6.95 3,567 513 101% 1,975 510 1.93 738 382 75% 1,975 485 485
EX1143 (Pit7) OP 510 0.00 0 4(HD785) 510 0.77 738 958 188% 1,975 4(HD785) 958 958 S1:OK, S2: putaran DT tidak normal karena perbaikan front
MD 255 0.00 0 255 3.08 840 273 107% 1,975 273 273
EX1045 (Pit7) OP 510 3.10 1,435 463 91% 1,975 3(HD785) 510 4.60 1,066 232 45% 1,975 3(HD785) 325 381 0
MD 255 7.35 1,702 231 91% 1,975 255 4.95 1,148 232 91% 1,975 232 240
ON 460 10.41 5,453 524 114% 1,591 460 10.00 5,125 513 111% 1,591 518 504
EX1091 (Pit4) OP 460 0.00 0 4(HD785) 460 0.00 0 4(HD785) 0 0 S1: OK, S2: material keras-ripping
ON 290 10.35 3,125 302 104% 2,407 290 9.65 3,125 324 112% 2,407 313 321
2(HD465)+3(HM4
EX2325 (Pit4) OP 290 0.00 0 5(HM400) 290 0.00 0 00) 0 0 0
370 357
Actual PC1250 Pit 4
307 312 312
320
Actual PC1250 Pit 7
270
Actual PC800 Pit 4
220
Plan PC800 Pit 7 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 01 MTD
Actual PC800 Pit 7
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
24 5
21 18.70 18.70
4
18
15 3
2.46 2.46
12
9 2
6
1
3 2.03 2.03
0 0
01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 MTD
100 1,000
90 84.07 84.07
80 800
70
60 600
50
40 400
30
20 200
78 54 54
53
10 27
0 0
01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 MTD
188 186
177
172 175
180 169
19. Monitoring Daywork Pit Rama
160 6.00
MF
140
117
120 106 107
100 4.00
85
80
60
1.43 2.00
40 0.94 1.11 1.14
20
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0.00
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 MTD
Plan Prod'ty HD465 (ON) Actual HD465 ON (Pit 4) Plan Prod'ty HD785 Actual HD785 ON (Pit 4) Actual HD465 ON (Pit 7) Actual HD785 ON (Pit 7) Actual MF