WEEK 38
(14-20 SEP 2020) & PLAN WEEK
39 (21-27 SEP 2020)
1
2020 1,926 2 5 - - - - - - - - - - - - -
Property 0 0
Damage JULI AGUSTUS SEPTEMBER
2 2
Performance
0 0 0
Fire Case
JULI AGUSTUS SEPTEMBER 1 1 1
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
First Aid JULI AGUSTUS SEPTEMBER
NM PD FC FA
3
Pra-Kualifikasi K3LH
4
Pra-Kualifikasi K3LH
5
MONTH to DATE PERFORMANCE
Problem PA PC400 : FEX420 track adjuster broken, FEX428 backlog swing circle; FEX419 oil hydraulic low
Problem PA Hauler OB : FDT242 air pressure drop, FDT239 AC panas , malfunction & parking brake tidak mau rilis, FDT252 incident
Problem UA Hauler OB : unit standby wait loader (PA)
Problem UA Hauler Coal : LCT Breakdown RFU tanggal 15 Shift 2, progress sidecast Mineout Seam N, proses recruitment 5 orang
operator dari PT. BBA
WEEKLY PRODUCTION REVIEW
PA
• PC400 : FEX420 track adjuster
broken, FEX428 backlog swing
circle; FEX419 oil hydraulic low
• PC200 : FEX210 track kiri lepas
(start BD 15/09/20)
• GD705A-4 : FGD203 BD control
valve
UA
• DT FMX400 wait loader (PA)
• Operator D375 masih dalam proses
rekrutmen (kurang 1 orang)
• Grader running 1 unit. Kebutuhan
operator grader masih dibawah
plan, masih proses rekrutmen 2
0rang
• DT Coal : LCT Breakdown RFU
tanggal 15 Shift 2, progress
sidecast Mineout Seam N, proses
recruitment 5 orang operator dari
PT. BBA
PRODUCTION PERFORMANCE
STRIPPING RATIO PERFORMANCE
OB FLEET RUNNING
OB PRODUCTIVITY
COAL HAULING RUNNING UNIT
COAL PRODUCTIVITY
COAL HAULING LOAD & DISTANCE
WEATHER
3. General Issue: PICA
2 RFU DT OB saat ini hanya 20-21 unit dari 24 DT yang 1. Optimalisasi MPP dari OJT yang sudah
ready dari Plant karena kendala No Operator/driver. lulus sebanyak 14 orang untuk
Kebutuhan Unit DT vs Plan Forecast Sep’20 : memenuhi MPP di populasi unit DT yg
ready. Oct’20 TDC Open
3 Terkait dengan terbatasnya jumlah unit excavator PC400 1. Tambahan 1 unit PC 400 dengan opsi EOM Sep’20 PJO - FAD Open
yang RFU yang disebabkan adanya unit yang B/D untuk rental.
support konsisten 5 fleet OB dan 2 Unit Coal
3 Loss time produksi awal shift => Change Shift & P5M a. Pengganti man haul (elf) masih proses BA EOM Sep’20 HRGS Open
dan kelengkapan administrasi
commissioning.
b. Pemenuhan administrasi man haul (bis) BA EOM Sep’20 HRGS Open
kontrak dan dokumen komisioning.
4 Penambahan kapasitas office Dept. Plant a. Pengadaan 2 x unit container (20 ft) EOM Sept’20 HO FAD Open
1. Review Week 38 : Joint Survey Vs Truck Count
TRUCK COUNT VS JOINT SURVEY MTD 11-17 September (Week 3720-Week 3820)
SEAM N N
SEAM Q N1 44 (STOCK 13,688.595 12,073.341
ROM)
42 M 33,383.534 43,398.594
Q1
53 Q 3,500.426 4,550.554
Key Point :
N 1. Progress Penambangan Pit N1_N
a. Mineout seam N strip Progress mineout seam N sisi selatan
strip 25 aktual telah mineout per tgl 17 sept 2020
b. Pembentukan counter weight di kaki IPD N1 Selatan mulai
diprogress tanggal 14 Sept, vol. lumpur 3.7kBCM. Est. 23 Sep 2020
6 2a 2. Progress Penambangan Pit Q1 O
2b a. Progress pemompaan Sump PIT Q1 Seam O progress
4a pemompaan terkendala hose fuel pompa rusak di tgl 15, RFU tgl
18 sept pkl. 10.00
b. Penempatan 1 fleet OB Removal belum terprogress, menunggu
4b progress pemompaan estimasi selesai tgl 22 sept shift 1
3. Progress Penambangan di Pit N1 Seam M
7 a. Continue 4 fleet progress penambangan continue 4 fleet OB di
1a
seam M
1b
b. Progress land clearing seam M Selatan Continue land clearing,
3a remain area Land Clearing 0.82 Ha
c. Cut soil seam M Selatan Progress tidak continue estimasi
remain 19 kBCM.
5 4. Dumping IPD N1
3c
a. Dumping IPD N1 up to RL +10 Progress penimbunan di posisi RL
+5 per tanggal 20 Sept 2020
b. Dumping ramp dari LW IPD N1 Tengah mengarah ke utara UP to RL
3b +30 Cancel
5. Dumping Stok Soil N1 Akses terputus karena kebutuhan front
loading. Peralihan spreading soil di IPD N1 Utara
6. Pembentukan paritan Q1 direct to WMP belum terprogress
7. Peralihan jalan akses masuk IPD N1 ke sisi tengah IPD N1
1. Review Week 38 : Rainbow Countour (Pit)
PIT DISPOSAL
N N
IPD N1
SEAM O
SEAM N
SEAM M
STOK
SOIL
1. Review Week 38 : Foto Lapangan
AL +26
RL +15 ramp to +25
AL +5
RL +0
AL -10
RL -10
1. Review Week 38 : General Activity => Dewatering Seam O (20 September 2020)
PIT
OB
N 4 Fleet PC 400 di PIT N1 seam M => 3 fleet material OB & 1-2 fleet
material soil
1 Fleet PC 400 di PIT N1 Seam O => Expose seam O
Coal
1 Fleet PC Pit to ROM Parapatan Seam M dan Seam O, Seam N Pilar
1 Fleet PC 400 Coal ROM to CPP di ROM Parapatan (Seam N)
DISPOSAL
Dumping IPD N1 hingga RL +20
Dumping IPD N1 Selatan pembentukan counterweight kaki disposal
Dumping di Stok Soil Utara RL +30
OB Production Plan W39 2020
BASED ON DESIGN WK 36 DISTANCE
NO. PIT SEAM BLOCK RL MATERIAL FLEET VOLUME (BCM) DISTANCE (m) DUMPING POINT
Key Point :
N 1. Progress Penambangan Pit N1_N
a. Pembentukan counter weight di kaki IPD N1 Selatan
b. Mineout seam N strip Progress mineout seam N sisi
5 selatan strip 25
2. Progress Penambangan Pit Q1 O
6 2a a. Progress pemompaan Sump PIT Q1 Seam O
3d 2b b. Penempatan 2 fleet OB Removal
c. Coal Getting Seam O
2c
d. Land Clearing Seam O Selatan
4 2d
3. Progress Penambangan di Pit N1 Seam M
a. Continue 3-4 fleet progress penambangan
b. Progress land clearing seam Selatan
c. Cut soil seam M Selatan, tidak continue
1a
1b d. Coal getting seam M Utara
3a
4. Dumping IPD N1
Dumping IPD N1 up to RL +20
5. Spreading soil IPD N1 Utara di area bench sisi barat
6. Pembentukan paritan Q1 direct to WMP
3c
3b
3. General Issue : Design Revisi September
N
1
2
3
2
1
3
Key point:
1. Extend area Seam O Selatan aktivitas Land Clearing
2. Penyesuaian boundary material lunak di Lowwall Seam M
3. Design rencana Void IPD N1
3. General Issue : Design Revisi September (Rainbow Countur)
PIT DISPOSAL
N N
IPD N1
SEAM O
SEAM N
SEAM M
STOK
SOIL
3. General Issue : Annual Design
4 5