PERIODE : 2020
DIVISION : PT. TUBINDO
REVISION :0
BARGING
No Rate Cost Min Charge
Equipment
Unit (Rp) (hours)
EXCAVATOR PC 400 A 300,000 -
PC CAT 320 (ZPS) B 225,000 -
Buldozer D65 C 350,000 -
Dump Truck 1 250,000
Dump Truck 2 250,000
Dump Truck 3 250,000
Dump Truck 4
LV Barging
Tower Lamp 85,000
Tower Lamp 85,000
Tower Lamp 85,000
EXCAVATOR PC 400 D 0
Dump Truck 5
Dump Truck 6
Dump Truck 7
Dump Truck 8
TOTAL
TOTAL COST
PRODUCTION PLAN
BUDGET COST
FUEL RATIO PLAN
200
Production Plan
Overburden
Coal
SR
Maret April May June July
01-31 01-30 01-31 01-30 01-31
2,087,526.4
616,241.1
3.4