Professional Documents
Culture Documents
b.
2 Bangunan
a. Pos Cheker Blok Selatan IUP 1 5.000.000
b. Workshop Blok Tengah IUP 1 30.000.000
c. Pos Security Blok Selatan IUP 1 5.000.000
d. Sample House Blok Tengah IUP 1 50.000.000
e. Area Parkir Blok Selatan IUP -
3 Stock Pile Blok Tengah IUP -
Total Rp. 90.000.000,-
Bulan
Deskripsi Lokasi/PIT TOTAL
Januari Februari Maret April Mei Juni Juli Agustus September Oktober November Desember
(1) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16)
RENCANA PIT Barat 10,322 10,322 10,322 10,322 10,322 10,322 10,322 10,322 10,322 10,322 10,322 10,322 123,864
TAHUN
2019
TOTAL 10,322 10,322 10,322 10,322 10,322 10,322 10,322 10,322 10,322 10,322 10,322 10,322 123,864
REALISASI PIT Barat 10,322 10,322 10,322 10,322 10,322 10,322 10,322 10,322 10,322 10,322 10,322 10,322 123,864
TAHUN
2019
TOTAL 10,322 10,322 10,322 10,322 10,322 10,322 10,322 10,322 10,322 10,322 10,322 10,322 123,864
RENCANA
TAHUN
Pit Barat 10,322 10,322 10,322 10,322 10,322 10,322 10,322 10,322 10,322 10,322 10,322 10,322 123,864
2020
TOTAL 10,322 10,322 10,322 10,322 10,322 10,322 10,322 10,322 10,322 10,322 10,322 10,322 123,864
Kegiatan Lokasi Bulan TOTAL
Januari Februari Maret April Mei Juni Juli Agustus September Oktober November Desember
Rencana 2020 Blok-A 5.304.167 5.304.167 5.304.167 5.304.167 5.304.167 5.304.167 5.304.167 5.304.167 5.304.167 5.304.167 5.304.167 5.304.167 63.650.000 BCM
Total 5.304.167 5.304.167 5.304.167 5.304.167 5.304.167 5.304.167 5.304.167 5.304.167 5.304.167 5.304.167 5.304.167 5.304.167 63.650.000 BCM
Rencana 2021 BloK-B 5.591.667 5.591.667 5.591.667 5.591.667 5.591.667 5.591.667 5.591.667 5.591.667 5.591.667 5.591.667 5.591.667 5.591.667 67.100.000 BCM
Total 5.591.667 5.591.667 5.591.667 5.591.667 5.591.667 5.591.667 5.591.667 5.591.667 5.591.667 5.591.667 5.591.667 5.591.667 67.100.000 BCM
Rencana 2022 BloK-C 2.589.583 2.589.583 2.589.583 2.589.583 2.589.583 2.589.583 2.589.583 2.589.583 2.589.583 2.589.583 2.589.583 2.589.583 31.075.000 BCM
Total 2.589.583 2.589.583 2.589.583 2.589.583 2.589.583 2.589.583 2.589.583 2.589.583 2.589.583 2.589.583 2.589.583 2.589.583 31.075.000 BCM
Total 5.304.167 5.304.167 5.304.167 5.304.167 5.304.167 5.304.167 5.304.167 5.304.167 5.304.167 5.304.167 5.304.167 5.304.167 63.650.000 BCM
Rencana 2021 BloK-B 5.591.667 5.591.667 5.591.667 5.591.667 5.591.667 5.591.667 5.591.667 5.591.667 5.591.667 5.591.667 5.591.667 5.591.667 67.100.000 BCM
Total 5.591.667 5.591.667 5.591.667 5.591.667 5.591.667 5.591.667 5.591.667 5.591.667 5.591.667 5.591.667 5.591.667 5.591.667 67.100.000 BCM
Rencana 2022 BloK-C 2.589.583 2.589.583 2.589.583 2.589.583 2.589.583 2.589.583 2.589.583 2.589.583 2.589.583 2.589.583 2.589.583 2.589.583 31.075.000 BCM
Total 2.589.583 2.589.583 2.589.583 2.589.583 2.589.583 2.589.583 2.589.583 2.589.583 2.589.583 2.589.583 2.589.583 2.589.583 31.075.000 BCM
No Jenis Litologi BLOK-A (m3) BLOK-B (m3) BLOK-C (m3) TOTAL (m3)
4. Tower Lamp 10 10 10
5. Fasilitas LV Mitsubishi 5 orang 2 2 2
NO Rencana & Lokasi Deskripsi Deskripsi
Realisasi Blok/Pit LAND CLEARING (Ha) OVERBURDEN REMOVAL (Bcm) COAL GETTING (Ton) RECONTURING (Ha) JUMLAH
NO KEGIATAN SATUAN* Jarak/To Biaya satuan TOTAL BIAYA Jarak ATAU Biaya satuan TOTAL Jarak ATAU Biaya satuan TOTAL BIAYA
nase Tonase BIAYA Tonase
1 Jarak hauling Km 225,000 56,250 0.25 225,000 56,250 0.25 225,000 56,250
0.25
2 Hauling dan stocking Ton 250,000 70,000 0.28 250,000 70,000 0.28 250,000 70,000
0.3
2. Coal Hauling Km 0,45 5.000 2.250 0,40 5.000 2.000 0,45 5.000 2.500
25038208000
7746195600
14866436000
RENCANA TAHUN REALISASI TAHUN
PENCAPAIAN (%) RENCANA TAHUN 2020 (MT)
2019 (MT) 2019 (MT)
No BULAN
EKSPOR DOMESTIC EKSPOR DOMESTIC EKSPOR DOMESTIC EKSPOR DOMESTIC KADAR/KUALITAS BUYER/PEMBELI*
1 Januari 2,145 2,145 100% - TM = 17,72 (%)
2 Perbuari 2,145 2,145 100% - IM = 19, 76 (%)
3 Maret 2,145 2,145 100% - VM = 42, 92 (%)
4 April 2,145 2,145 100% - FC = 42, 28 (%)
5 Mei 2,145 2,145 100% - TS = 3,47(%)
6 Juni 2,145 2,145 100% 2,145 CV =6,411 ADB Kcal/kg
7 Juli 2,145 2,145 100% 2,145 HGI = 56 ip PT Semen Tonasa
8 Agustus 2,145 2,145 100% 2,145 ……. (%)
9 September 2,145 2,145 100% 2,145 ……. (%)
10 Oktober 2,145 2,145 100% 2,145
11 November 2,145 2,145 100% 2,145
12 Desember 2,145 2,145 100% 2,145
TOTAL 25,734 25,734 100% 15,011.72
Rencana Tahun 2020 (MT) Rencana Tahun 2021 (MT) Rencana Tahun 2022 (MT)
No. Bulan Ekspor Domestic Ekspor Domestic Ekspor Domestic
1. Januari - 206.250 166.667 166.667 98.958 98.958
2. Februari - 206.250 166.667 166.667 98.958 98.958
3. Maret - 206.250 166.667 166.667 98.958 98.958
4. April - 206.250 166.667 166.667 98.958 98.958
5. Mei - 206.250 166.667 166.667 98.958 98.958
6. Juni - 206.250 166.667 166.667 98.958 98.958
7. Juli - 206.250 166.667 166.667 98.958 98.958
8. Agustus - 206.250 166.667 166.667 98.958 98.958
9. September - 206.250 166.667 166.667 98.958 98.958
10 Oktober - 206.250 166.667 166.667 98.958 98.958
11 November - 206.250 166.667 166.667 98.958 98.958
12 Desember - 206.250 166.667 166.667 98.958 98.958
Realisasi Tahun 2019 Rencana Tahun 2020
Uraian Kegiatan
Tri. I Tri. II Tri. III Tri. IV Tri. I Tri. II Tri. III Tri. IV
1 2 3 4 5 6 7 8 9
I. Pengelolaan lingkungan
a. Pemupukan 0 0 0 0 0 0 0 0
a. Pengumpulan limbah 1 1 1 1 1 1 1 1
b. Penyimpanan Limbah 1 1 1 1 1 1 1 1
1. Kualitas air 0 0 1 0 1 1 1 1
2. Kualitas udara 0 0 1 0 0 1 0 1
3. Kualitas tanah 0 0 1 0 0 1 0 0
4. Kestabilan lereng 0 0 0 0 0 0 0 0
5. Limbah B3 0 0 0 0 0 0 0 0
Tri I Tri II Tri III Tri IV Tri I Tri II Tri III Tri IV Tri I Tri II Tri III Tri IV
I. Pengelolaan Lingkungan
1. Pengelolaan kualitas air 0 0 1 1 1 1 1 1 1 1 1 1
a. Pemeberian kapur (kg) 0 0 0 0 0 0 0 0 0 0 0 0
b. Pemberian tawas (kg) 0 0 0 0 0 0 0 0 0 0 0 0
c. Pemberian reagen lainnya (vulume) 0 0 0 0 0 0 0 0 0 0 0 0
2. Pengolahan Kualitas Udara
a. Penyiraman jalan tambang 0 0 1 1 1 1 1 1 1 1 1 1
b. Penyiraman jalan hauling 0 0 1 1 1 1 1 1 1 1 1 1
3. Pengelolaan Kualits Tanah 0 0 1 1 1 1 1 1 1 1 1 1
a. Pemupukan
b. Pemberian kapur pertanian 0 0 0 0 0 0 0 0 0 0 0 0
4. Pengelolaan Limbah B3
a. Pengumpulan limbah 0 1 1 1 1 1 1 1 1 1 1 1
b. Penyimpanan limbah 0 1 1 1 1 1 1 1 1 1 1 1
c. Pengiriman kepihak ke-3 0 1 1 1 1 1 1 1 1 1 1 1
d. Remediasi 0 0 0 0 0 0 0 0 0 0 0 0
e. Pemusnahan di insinerator 0 0 0 0 0 0 0 0 0 0 0 0
II. Pemantauan (berapakali per triwulan)
1. Kualitas air 0 1 1 1 1 1 1 1 1 1 1 1
2. Kualitas tanah 0 1 1 1 1 1 1 1 1 1 1 1
3. Kualitas udara 0 1 1 1 1 1 1 1 1 1 1 1
5. Kestabilan lereng 0 1 1 1 1 1 1 1 1 1 1 1
6. Limbah B3 0 1 1 1 1 1 1 1 1 1 1 1
7. Amblesan 0 0 1 1 1 1 1 1 1 1 1 1
8. Revegetasi 0 0 1 1 1 1 1 1 1 1 1 1
9. Flora dan Fauna 0 0 1 1 1 1 1 1 1 1 1 1