Working Area m2 Ha

1. Loading Area 37,252 3.7


Stripping 2. Drilling Area 31,398 3.1
3. Blasting Stok Area 62,796 6.3
1. Coal Cleaning 4,737 0.5
Mining 2. Coal Mining 4,981 0.5
3. Coal Expose 9,475 0.9
1. Sump 10,000 1.0
Infrastructure
2. Road 240,000 24.0
Total WG Required 400,638 40.1
Available Area Inpit 912,258 91.2
Ratio 2.28

A. Stripping

Days Of Blast Vol 2 <------------- Lamanya rencana Blasting Stock ( Input Data )

MOHH 24

PA Avg 91%

UA Avg 73%

W.Hours/day 15.97

Blasting Target 100%


Daily Production Daily Blasting Volume Blasting Stock Daily Working Area Required
Prodty Jumlah Unit Loading Geometri
Blasting Non-Blast Total Working Area Target Working Area Target Working Area Loading Drilling B. Stock 1) Blasting 2) TOTAL

bcm/hr
Loading Factor Height Width Long Luas Per Day Long Luas Per 2 days Long Luas Luas Luas Luas Luas Luas
Meter Meter bcm bcm bcm Meter M2 bcm Meter M2 bcm Meter M2 M2 M2 M2 M2 M2
PC2000 800 6 1 3 35 76,632 - 76,632 730 25,544 76,632 730 25,544 153,264 1,460 51,088 25,544 25,544 25,544 25,544 102,176
PC 3000 1,050 0 2 4 35 - - - - - - - - - - - - - - - -
EX 2500 1,100 0 2 4 30 - - - - - - - - - - - - - - - -
PC1250 550 4 1 3 30 17,562 17,562 35,123 390 11,708 17,562 195 5,854 35,123 390 11,708 11,708 5,854 5,854 5,854 29,269
PC 200/300 220 2 1 0.5 20 - 7,025 7,025 - - - -
Loading Capability 12 118,780 24,586 118,780 37,252 94,194 31,398 188,387 62,796 37,252 31,398 31,398 31,398 131,445
Catatan : Blasting Stock ----> B. Stock 1)= Jumlah OB Blasting yang tersedia dalam "beberapa" hari dikurangi dengan OB Blasting yang diloading pada hari berjalan. 13.14 Ha
Blasting 2) = Jumlah OB yang di Blasting pada hari berjalan (daily) = Daily Production OB Blasting

B. Coal Mining

Jumlah Inventory (hari) 2.00


Dip (derajat) 18.00
W.Hours/day 15.97
Density 1.30
Prodty Jumlah Unit Loading Geometri Coal Mine Coal Expose Coal Cleaning
Dip 2.30
bcm/hr Thick Long Width Tonase Working Area Jumlah Stok Working Area Working Area
Tonase
Meter Meter Meter Long Luas Hari Luas by Dip Luas Datar
Tonase Meter M2 Tonase m2 M2 Tonase
PC1250 500 0 1.00 - 30 - - - - - - - -
PC800 300 0 4.00 - 30 - - - - - - - -
PC 300 200 0 2.00 - 30 - - - - - - - -
PC 200 120 2 1.00 166 30 4,981 166 4,981 9,962 9,962 9,475 4,981 4,737
4,981 4,981 9,962 9,475 4,981 4,737

C. Infrastructure
PERHITUNGAN INFRASTRUKTUR
Access Utama Inpit 2 ramp
Panjang (P) 2,100 m
Lebar (L) 40 m
Luas 168,000 m2 16.80 Ha
Acces Utama Inpit to Front Loading
Jumlah Front Loading 8 ramp
Panjang (P) 300 m
Lebar (L) 30 m
Luas 72,000 m2 7.20 Ha

Sump 1
Panjang (P) 100 m
Lebar (L) 100 m
Luas 10,000 m2 1.00 Ha

TOTAL 25.00 Ha