This bill of quantities is from Nous Construction Ltd for excavation work on a dam in Msimba, Morogoro Region, Tanzania. It provides estimates for clearing, excavating, and filling works. The preliminary works are estimated to cost TZS 24.5 million. Earthworks are estimated to cost TZS 413.79 million, including clearing and grubbing around the dam for TZS 43.35 million, excavating the dam area for TZS 225 million, and filling the embankment for TZS 145.44 million. The total cost for clearing and excavation works is estimated at TZS 438.29 million, with an additional TZS 78.89 million for 18% VAT. The
This bill of quantities is from Nous Construction Ltd for excavation work on a dam in Msimba, Morogoro Region, Tanzania. It provides estimates for clearing, excavating, and filling works. The preliminary works are estimated to cost TZS 24.5 million. Earthworks are estimated to cost TZS 413.79 million, including clearing and grubbing around the dam for TZS 43.35 million, excavating the dam area for TZS 225 million, and filling the embankment for TZS 145.44 million. The total cost for clearing and excavation works is estimated at TZS 438.29 million, with an additional TZS 78.89 million for 18% VAT. The
This bill of quantities is from Nous Construction Ltd for excavation work on a dam in Msimba, Morogoro Region, Tanzania. It provides estimates for clearing, excavating, and filling works. The preliminary works are estimated to cost TZS 24.5 million. Earthworks are estimated to cost TZS 413.79 million, including clearing and grubbing around the dam for TZS 43.35 million, excavating the dam area for TZS 225 million, and filling the embankment for TZS 145.44 million. The total cost for clearing and excavation works is estimated at TZS 438.29 million, with an additional TZS 78.89 million for 18% VAT. The
SALAAM BILL OF QUANTITIES FOR DAM EXCAVATION AT MSIMBA – MOROGORO REGION.
CONTRACTORS NAME: NOUS CONSTRUCTION LTD.
Description Unit Qty Rate Amount
S/N Quantity Tshs Tshs PART 1: PRELIMINARIES AND GENERAL ITEMS Mobilization/Demobilization 1.1 of equipments, site LS 1 24,500,000.00 24,500,000.00 establishment including removal on completion TOTAL PRELIMINARIES 24,500,000.00 2.0 PART 2: EARTHWORKS Clearing and grubbing around 2.1 m2 28,900 1,500 the dam to the specified width. 43,350,000.00 Excavation of the new Dam as per 2.2 engineer's instructions m3 45,000 5,000 225,000,000.00 and submitted drawings. Fill selected materials at the edge of the dam to raise embarkment as 2.3 per drawings (Fill and compact in m3 24,240 6,000 145,440,000.00 layers as per engineers’ TOTAL EARTHWORKS 413,790,000.00 TOTAL QUANTITIES FOR CLEARING AND REMOVAL OF MUD IN THE DAM AT KILOSA -MOROGORO 438,290,000.00 REGION ADD VAT 18% 78,892,000.00 GRAND TOTAL 517,182,000.00
Design, Supply, Installation, Testing and Commissioning of Extension For Sgr-1 220Kv Transmission Line From Kingolwira To Msamvu Sinohydro Corporation Limited