PRODUCTION DAILY REPORT PT.

KONINIS FAJAR MINERAL

DAILY REPORT
PRODUCTION MONITORING

PERIODE 6 MARCH - 12 MARCH 2021

DAY SHIFT NIGHT SHIFT SUMMARY Date Monday, 8 March 2021


SUMMARY OB 187 - 187 Date To Date : 565 Wmt SHIFT 1 Rainfall SHIFT 2 Rainfall
SUMMARY QUARRY 1,560 - 1,560 Month To Date : 3,977 Wmt Work Day 07.00-17.00 19.00-21.00 -
SUMMARY TOP SOIL PRODUCTION - - - Year To Date : 3,977 Wmt Rain 8.5
SUMMARY ORE PRODUCTION 565 - 565 Project To Date : 3,977 Wmt Slippery

PIT CENDRAWASIH PIT MALEO ETO TOTAL PER SHIFT TOTAL PRODUKSI INTENSITAS HUJAN SLIPPERY

WEEK #1 SHIFT TOP SOIL QUARRY TOP SOIL QUARRY TOTAL PER TOTAL PER
ORE OB TOP SOIL ORE OB TOP SOIL TOP SOIL ORE (wmt) OB (wmt) ORE (wmt) OB (wmt) SHIFT (mm) SHIFT (jam)
(wmt) (bcm) (wmt) (wmt) DAY (mm) DAY (jam)

SHIFT 1 - - - - - - 516 7.23


6-Mar-21 - - - 516 - 7.23
SHIFT 2 - - - - - - - - - - -

SHIFT 1 - 532 - - - 532 - - 288 3.5 7.16


7-Mar-21 532 - - 288 3.5 7.16
SHIFT 2 - - - - - - - - - - - - -

SHIFT 1 - 187 - 565 - - - 565 187 - 1,560 8.5 3.50


8-Mar-21 565 187 - 1,560 8.5 3.50
SHIFT 2 - - - - - - - - - - - - -

SHIFT 1 - - - - - - - - -
9-Mar-21 - - - - - -
SHIFT 2 - - - - - - - - - - - - -

SHIFT 1 - - - - - - - - - -
10-Mar-21 - - - - - -
SHIFT 2 - - - - - - - - - - - -

SHIFT 1 - - - - - - - - - - -
11-Mar-21 - - - - - -
SHIFT 2 - - - - - - - - - - -

SHIFT 1 - - - - - - - - - -
12-Mar-21 - - - - -
SHIFT 2 - - - - - - - - - - - - -

TOTAL PRODUKSI PER PIT - 187 - 1,098 - - - 1,098 187 - 2,364 1,098 187 - 2,364 SUMMARY
SUMMARY RAIN FALL 12.00 17.89
SLIPPERY
STRIPPING RATIO (SR) STRIPPING RATIO ALL PIT WEEK #1 0.17