You are on page 1of 32

PROPOSED WESTIN MINA SEYAHI

WATER PARK, DUBAI,


UNITED ARAB EMIRATES

TENDER BOQ

Sanderson International Theme LLC 1 of 32 - COVER


PROPOSED WESTIN MINA SEYAHI WATER PARK, DUBAI, BILLS OF QUANTITIES

UNITED ARAB EMIRATES MEP

TOTAL PRICE
ITEM DESCRIPTION QTY UNIT UNIT RATE
AED

MEP

A MECHANICAL ENGINEERING INSTALLATIONS

PLUMBING AND HVAC

Entrance wash room

Supply and install meters and gages adjacent equipment as


detailed on drawings and specification.

1 Thermostat as specified 1 item

1 Sensors 1 item

Supply and install duct insulation complete with adhesive


fasteners, anchors, joint tapes, tie wires and finish as
detailed on drawings and specification.

1 Insulation for ducts 35 m2

Supply and installation of chilled water pipes, complete with


fittings, valves, joints, hangers / supports and insulation,
aluminum jacketing, and cladding, expansion joints, anchors,
guides, etc. as specified.

1 Chilled water pipes 1 item

Supply and install HVAC ductwork complete with duct


hangers/supports, vcd's, fittings, flanges, flexible, duct
connectors, wire mesh end covers, access doors, test, points
for air/water and identification as detailed on drawings and
specification.

1 Ducts 168 Kg

Supply and install air duct accessories including all


necessary components as detailed on drawings and
specification.

1 250 x100 VCD 1 nr

2 200 x100 VCD 21 nr

3 150x150 VCD 2 nr

4 400x200 VCD 2 nr

5 150mm Disc valve 20 nr

Supply and install air outlets and inlets (diffuser, registers and
grilles) including all necessary fittings and accessories as
required for a fully functional and complete installation.

1 150x150mm extract diffuser 2 nr

HVAC equipment compete with all accessories including


hangers, vibration isolators, drain pan, controls as specified

1 Extract fan 435L/s 2 nr

Sanderson International Theme LLC 2 of 32 - MEP


PROPOSED WESTIN MINA SEYAHI WATER PARK, DUBAI, BILLS OF QUANTITIES

UNITED ARAB EMIRATES MEP

TOTAL PRICE
ITEM DESCRIPTION QTY UNIT UNIT RATE
AED

2 Civil works related to the installation of HVAC works 1 item

3 Testing, adjusting and balancing 1 item

4 Spare Parts 1 item

5 As built drawings and operational manual 1 item

Allow for connecting chilled water supply and return pipes to


D.C. line including Isolation Valves and other required works
6 1 item
all as shows on drawings and as specified in the
specifications

Electrical works for HVAC including the control wiring , power


cabling termination with cable glands, lugs and other
7 1 item
fixing/supporting devices to the HVAC equipment's as per
requirements of the specifications & drawings

Light House

Supply and install meters and gages adjacent equipment as


detailed on drawings and specification.

1 Thermostat as specified 1 item

2 Sensors 1 item

Supply and install duct insulation complete with adhesive


fasteners, anchors, joint tapes, tie wires and finish as
detailed on drawings and specification.

1 Insulation for ducts 4 m2

Supply and installation of chilled water pipes, complete with


fittings, valves, joints, hangers / supports and insulation,
aluminum jacketing, and cladding, expansion joints, anchors,
guides, etc. as specified.

1 15mm CHW FR 17 m

2 15mm CDP 6 m

Supply and install HVAC ductwork complete with duct


hangers/supports, vcd's, fittings, flanges, flexible, duct
connectors, wire mesh end covers, access doors, test, points
for air/water and identification as detailed on drawings and
specification.

1 Ducts 20 Kg

Supply and install air duct accessories including all


necessary components as detailed on drawings and
specification.

1 300x150 FD 2 nr

Supply and install air outlets and inlets (diffuser, registers and
grilles) including all necessary fittings and accessories as
required for a fully functional and complete installation.

1 300x150 grille 2 nr

2 300x200 Grille 1 nr

Sanderson International Theme LLC 3 of 32 - MEP


PROPOSED WESTIN MINA SEYAHI WATER PARK, DUBAI, BILLS OF QUANTITIES

UNITED ARAB EMIRATES MEP

TOTAL PRICE
ITEM DESCRIPTION QTY UNIT UNIT RATE
AED

HVAC equipment compete with all accessories including


hangers, vibration isolators, drain pan, controls as specified

1 Extract fan 1 nr

2 FCU LH-01,02 & 03 3 nr

3 Civil works related to the installation of HVAC works 1 item

4 Testing, adjusting and balancing 1 item

5 Spare Parts 1 item

6 As built drawings and operational manual 1 item

Allow for connecting chilled water supply and return pipes to


D.C. line including Isolation Valves and other required works
7 1 item
all as shows on drawings and as specified in the
specifications

Electrical works for HVAC including the control wiring , power


cabling termination with cable glands, lugs and other
8 1 item
fixing/supporting devices to the HVAC equipment's as per
requirements of the specifications & drawings

Windmill 1

Supply and install meters and gages adjacent equipment as


detailed on drawings and specification.

1 Thermostat as specified 1 item

2 Sensors 1 item

Supply and install duct insulation complete with adhesive


fasteners, anchors, joint tapes, tie wires and finish as
detailed on drawings and specification.

1 Insulation for ducts 4 m2

Supply and installation of chilled water pipes, complete with


fittings, valves, joints, hangers / supports and insulation,
aluminum jacketing, and cladding, expansion joints, anchors,
guides, etc. as specified.

1 15mm CHW FR 12 m

Supply and install HVAC ductwork complete with duct


hangers/supports, vcd's, fittings, flanges, flexible, duct
connectors, wire mesh end covers, access doors, test, points
for air/water and identification as detailed on drawings and
specification.

1 Ducts 17 Kg

Supply and install air duct accessories including all


necessary components as detailed on drawings and
specification.

1 200x100 VCD 4 nr

2 200mm diameter Dics valves 4 nr

Supply and install air outlets and inlets (diffuser, registers and
grilles) including all necessary fittings and accessories as
required for a fully functional and complete installation.

Sanderson International Theme LLC 4 of 32 - MEP


PROPOSED WESTIN MINA SEYAHI WATER PARK, DUBAI, BILLS OF QUANTITIES

UNITED ARAB EMIRATES MEP

TOTAL PRICE
ITEM DESCRIPTION QTY UNIT UNIT RATE
AED

1 200x150 grille 2 nr

HVAC equipment compete with all accessories including


hangers, vibration isolators, drain pan, controls as specified

1 EF WM-1-01 2 nr

2 FCU WM-1-01 2 nr

3 Civil works related to the installation of HVAC works 1 item

4 Testing, adjusting and balancing 1 item

5 Spare Parts 1 item

6 As built drawings and operational manual 1 item

Allow for connecting chilled water supply and return pipes to


D.C. line including Isolation Valves and other required works
7 1 item
all as shows on drawings and as specified in the
specifications

Electrical works for HVAC including the control wiring , power


cabling termination with cable glands, lugs and other
8 1 item
fixing/supporting devices to the HVAC equipment's as per
requirements of the specifications & drawings

Windmill 2

Supply and install meters and gages adjacent equipment as


detailed on drawings and specification.

1 Thermostat as specified 1 item

2 Sensors 1 item

Supply and install duct insulation complete with adhesive


fasteners, anchors, joint tapes, tie wires and finish as
detailed on drawings and specification.

1 Insulation for ducts 2 m2

Supply and installation of chilled water pipes, complete with


fittings, valves, joints, hangers / supports and insulation,
aluminum jacketing, and cladding, expansion joints, anchors,
guides, etc. as specified.

1 15mm CHW FR 2 m

Supply and install HVAC ductwork complete with duct


hangers/supports, vcd's, fittings, flanges, flexible, duct
connectors, wire mesh end covers, access doors, test, points
for air/water and identification as detailed on drawings and
specification.

1 Ducts 9 Kg

Supply and install air duct accessories including all


necessary components as detailed on drawings and
specification.

1 200x100 VCD 2 nr

Sanderson International Theme LLC 5 of 32 - MEP


PROPOSED WESTIN MINA SEYAHI WATER PARK, DUBAI, BILLS OF QUANTITIES

UNITED ARAB EMIRATES MEP

TOTAL PRICE
ITEM DESCRIPTION QTY UNIT UNIT RATE
AED

Supply and install air outlets and inlets (diffuser, registers and
grilles) including all necessary fittings and accessories as
required for a fully functional and complete installation.

1 200x150 grille 1 nr

2 150x150mm extract diffuser 2 nr

HVAC equipment compete with all accessories including


hangers, vibration isolators, drain pan, controls as specified

1 FCU WM-2 1 nr

2 EF WM-2-01 1 nr

3 Civil works related to the installation of HVAC works 1 item

4 Testing, adjusting and balancing 1 item

5 Spare Parts 1 item

6 As built drawings and operational manual 1 item

Allow for connecting chilled water supply and return pipes to


D.C. line including Isolation Valves and other required works
7 1 item
all as shows on drawings and as specified in the
specifications

Electrical works for HVAC including the control wiring , power


cabling termination with cable glands, lugs and other
8 1 item
fixing/supporting devices to the HVAC equipment's as per
requirements of the specifications & drawings

Windmill 3

Supply and install meters and gages adjacent equipment as


detailed on drawings and specification.

1 Thermostat as specified 1 item

2 Sensors 1 item

Supply and install duct insulation complete with adhesive


fasteners, anchors, joint tapes, tie wires and finish as
detailed on drawings and specification.

1 Insulation for ducts 2 m2

Supply and installation of chilled water pipes, complete with


fittings, valves, joints, hangers / supports and insulation,
aluminum jacketing, and cladding, expansion joints, anchors,
guides, etc. as specified.

1 15mm CHW FR 10 m

Supply and install HVAC ductwork complete with duct


hangers/supports, vcd's, fittings, flanges, flexible, duct
connectors, wire mesh end covers, access doors, test, points
for air/water and identification as detailed on drawings and
specification.

1 Ducts 6 Kg

Supply and install air duct accessories including all


necessary components as detailed on drawings and
specification.

Sanderson International Theme LLC 6 of 32 - MEP


PROPOSED WESTIN MINA SEYAHI WATER PARK, DUBAI, BILLS OF QUANTITIES

UNITED ARAB EMIRATES MEP

TOTAL PRICE
ITEM DESCRIPTION QTY UNIT UNIT RATE
AED

1 200x100 VCD 1 item

Supply and install air outlets and inlets (diffuser, registers and
grilles) including all necessary fittings and accessories as
required for a fully functional and complete installation.

1 200x100 grille 2 nr

HVAC equipment compete with all accessories including


hangers, vibration isolators, drain pan, controls as specified

1 FCU WM-3 2 nr

2 EF WM-3-01 2 nr

3 Civil works related to the installation of HVAC works 1 item

4 Testing, adjusting and balancing 1 item

5 Spare Parts 1 item

6 As built drawings and operational manual 1 item

Allow for connecting chilled water supply and return pipes to


D.C. line including Isolation Valves and other required works
7 1 item
all as shows on drawings and as specified in the
specifications

Electrical works for HVAC including the control wiring , power


cabling termination with cable glands, lugs and other
8 1 item
fixing/supporting devices to the HVAC equipment's as per
requirements of the specifications & drawings

Wave pool machine room

Supply and install complete HVAC system as specified and


1 1 item
detailed in the drawings

Aquaplay machine room

Supply and install complete HVAC system as specified and


1 1 item
detailed in the drawings

Mat racer machine room

Supply and install meters and gages adjacent equipment as


detailed on drawings and specification.

1 Thermostat as specified 1 item

2 Sensors 1 item

Supply and install duct insulation complete with adhesive


fasteners, anchors, joint tapes, tie wires and finish as
detailed on drawings and specification.

1 250mm diameter Ducts 2 m

Supply and installation of chilled water pipes, complete with


fittings, valves, joints, hangers / supports and insulation,
aluminum jacketing, and cladding, expansion joints, anchors,
guides, etc. as specified.

1 65 CHW 11 m

Sanderson International Theme LLC 7 of 32 - MEP


PROPOSED WESTIN MINA SEYAHI WATER PARK, DUBAI, BILLS OF QUANTITIES

UNITED ARAB EMIRATES MEP

TOTAL PRICE
ITEM DESCRIPTION QTY UNIT UNIT RATE
AED

2 65 IV 4 nr

Supply and install HVAC ductwork complete with duct


hangers/supports, vcd's, fittings, flanges, flexible, duct
connectors, wire mesh end covers, access doors, test, points
for air/water and identification as detailed on drawings and
specification.

1 250mm diameter Ducts 2 m

Supply and install air duct accessories including all


necessary components as detailed on drawings and
specification.

1 250mm diameter cowl termination including duct 1 nr

Supply and install air outlets and inlets (diffuser, registers and
grilles) including all necessary fittings and accessories as
required for a fully functional and complete installation.

1 250mm diameter extract diffuser 1 nr

HVAC equipment compete with all accessories including


hangers, vibration isolators, drain pan, controls as specified

1 EF PR6-01 1 nr

2 Specialist plant PHEX PR6-01 1 nr

3 Civil works related to the installation of HVAC works 1 item

4 Testing, adjusting and balancing 1 item

5 Spare Parts 1 item

6 As built drawings and operational manual 1 item

Allow for connecting chilled water supply and return pipes to


D.C. line including Isolation Valves and other required works
7 1 item
all as shows on drawings and as specified in the
specifications

Electrical works for HVAC including the control wiring , power


cabling termination with cable glands, lugs and other
8 1 item
fixing/supporting devices to the HVAC equipment's as per
requirements of the specifications & drawings

Body slide machine room

Supply and install meters and gages adjacent equipment as


detailed on drawings and specification.

1 Thermostat as specified 1 item

2 Sensors 1 item

Supply and install duct insulation complete with adhesive


fasteners, anchors, joint tapes, tie wires and finish as
detailed on drawings and specification.

1 250mm diameter Ducts 2 m

Sanderson International Theme LLC 8 of 32 - MEP


PROPOSED WESTIN MINA SEYAHI WATER PARK, DUBAI, BILLS OF QUANTITIES

UNITED ARAB EMIRATES MEP

TOTAL PRICE
ITEM DESCRIPTION QTY UNIT UNIT RATE
AED

Supply and installation of chilled water pipes, complete with


fittings, valves, joints, hangers / supports and insulation,
aluminum jacketing, and cladding, expansion joints, anchors,
guides, etc. as specified.

1 65 CHW 11 m

2 65 IV 4 nr

Supply and install HVAC ductwork complete with duct


hangers/supports, vcd's, fittings, flanges, flexible, duct
connectors, wire mesh end covers, access doors, test, points
for air/water and identification as detailed on drawings and
specification.

1 250mm diameter Ducts 2 m

Supply and install air duct accessories including all


necessary components as detailed on drawings and
specification.

1 250mm diameter cowl termination including duct 2 nr

Supply and install air outlets and inlets (diffuser, registers and
grilles) including all necessary fittings and accessories as
required for a fully functional and complete installation.

1 250mm diameter extract diffuser 1 nr

HVAC equipment compete with all accessories including


hangers, vibration isolators, drain pan, controls as specified

1 EF PR3-01 1 nr

2 Specialist plant PHEX PR3-01 1 nr

3 Civil works related to the installation of HVAC works 1 item

4 Testing, adjusting and balancing 1 item

5 Spare Parts 1 item

6 As built drawings and operational manual 1 item

Allow for connecting chilled water supply and return pipes to


D.C. line including Isolation Valves and other required works
7 1 item
all as shows on drawings and as specified in the
specifications

Electrical works for HVAC including the control wiring , power


cabling termination with cable glands, lugs and other
8 1 item
fixing/supporting devices to the HVAC equipment's as per
requirements of the specifications & drawings

Ramp and mini slide machine room

Supply and install meters and gages adjacent equipment as


detailed on drawings and specification.

1 Thermostat as specified 1 item

2 Sensors 1 item

Supply and install duct insulation complete with adhesive


fasteners, anchors, joint tapes, tie wires and finish as
detailed on drawings and specification.

Sanderson International Theme LLC 9 of 32 - MEP


PROPOSED WESTIN MINA SEYAHI WATER PARK, DUBAI, BILLS OF QUANTITIES

UNITED ARAB EMIRATES MEP

TOTAL PRICE
ITEM DESCRIPTION QTY UNIT UNIT RATE
AED

1 250mm diameter Ducts 2 m

Supply and installation of chilled water pipes, complete with


fittings, valves, joints, hangers / supports and insulation,
aluminum jacketing, and cladding, expansion joints, anchors,
guides, etc. as specified.

1 65 CHW 9 m

2 65 IV 4 nr

Supply and install HVAC ductwork complete with duct


hangers/supports, vcd's, fittings, flanges, flexible, duct
connectors, wire mesh end covers, access doors, test, points
for air/water and identification as detailed on drawings and
specification.

1 250mm diameter Ducts 2 m

Supply and install air duct accessories including all


necessary components as detailed on drawings and
specification.

2 250mm diameter cowl termination including duct 2 nr

Supply and install air outlets and inlets (diffuser, registers and
grilles) including all necessary fittings and accessories as
required for a fully functional and complete installation.

1 250mm diameter extract diffuser 1 nr

HVAC equipment compete with all accessories including


hangers, vibration isolators, drain pan, controls as specified

1 EF PR5-01 1 nr

2 Specialist plant PHEX PR5-01 1 nr

3 Civil works related to the installation of HVAC works 1 item

4 Testing, adjusting and balancing 1 item

5 Spare Parts 1 item

6 As built drawings and operational manual 1 item

Allow for connecting chilled water supply and return pipes to


D.C. line including Isolation Valves and other required works
7 1 item
all as shows on drawings and as specified in the
specifications

Electrical works for HVAC including the control wiring , power


cabling termination with cable glands, lugs and other
8 1 item
fixing/supporting devices to the HVAC equipment's as per
requirements of the specifications & drawings

Ramp slide multi lane and mini slide machine room

Supply and install meters and gages adjacent equipment as


detailed on drawings and specification.

1 Thermostat as specified 1 item

Sanderson International Theme LLC 10 of 32 - MEP


PROPOSED WESTIN MINA SEYAHI WATER PARK, DUBAI, BILLS OF QUANTITIES

UNITED ARAB EMIRATES MEP

TOTAL PRICE
ITEM DESCRIPTION QTY UNIT UNIT RATE
AED

2 Sensors 1 item

Supply and install duct insulation complete with adhesive


fasteners, anchors, joint tapes, tie wires and finish as
detailed on drawings and specification.

1 250mm diameter Ducts 2 m

Supply and installation of chilled water pipes, complete with


fittings, valves, joints, hangers / supports and insulation,
aluminum jacketing, and cladding, expansion joints, anchors,
guides, etc. as specified.

1 65 CHW 8 m

2 65 IV 4 nr

Supply and install HVAC ductwork complete with duct


hangers/supports, vcd's, fittings, flanges, flexible, duct
connectors, wire mesh end covers, access doors, test, points
for air/water and identification as detailed on drawings and
specification.

1 250mm diameter Ducts 2 m

Supply and install air duct accessories including all


necessary components as detailed on drawings and
specification.

1 250mm diameter cowl termination including duct 2 nr

Supply and install air outlets and inlets (diffuser, registers and
grilles) including all necessary fittings and accessories as
required for a fully functional and complete installation.

1 250mm diameter extract diffuser 1 nr

HVAC equipment compete with all accessories including


hangers, vibration isolators, drain pan, controls as specified

1 EF PR4-01 1 nr

2 Specialist plant PHEX PR4-01 1 nr

3 Civil works related to the installation of HVAC works 1 item

4 Testing, adjusting and balancing 1 item

5 Spare Parts 1 item

6 As built drawings and operational manual 1 item

Allow for connecting chilled water supply and return pipes to


D.C. line including Isolation Valves and other required works
7 1 item
all as shows on drawings and as specified in the
specifications

Electrical works for HVAC including the control wiring , power


cabling termination with cable glands, lugs and other
8 1 item
fixing/supporting devices to the HVAC equipment's as per
requirements of the specifications & drawings

External works

Sanderson International Theme LLC 11 of 32 - MEP


PROPOSED WESTIN MINA SEYAHI WATER PARK, DUBAI, BILLS OF QUANTITIES

UNITED ARAB EMIRATES MEP

TOTAL PRICE
ITEM DESCRIPTION QTY UNIT UNIT RATE
AED

Pipe works including excavation, bedding surrounding,


wrapping, warning tapes, back filling, reinstating as specified
and as detailed in the drawings

1 CHW to FCUs 207 m

2 125 CHW gate valve 2 nr

3 125mm CHW F&R (20 ??) 535 m

4 CHWR from FCUs 207 m

5 100 LTHW 99 m

6 100 LTHW gate valve 2 nr

Supply and install manholes, chambers, pits including


tanking membrane, membrane protections, manhole cover
7 1 item
and frame and all other necessary components and
accessories etc. as detailed on drawings and specification.

DOMESTIC WATER

Entrance washroom

Supply and install valves with including all accessories etc.


as detailed on drawings and specification.

1 15mm Diameter isolation valve 1 nr

2 20mm, Ditto 1 nr

3 32mm, Ditto 2 nr

4 40mm, Ditto 4 nr

5 32mm Diameter gate valve 2 nr

6 40mm, Ditto 4 nr

Supply and install pipe work including all fittings, supports,


hangers, coding, protection and wrappings warning grid,
etc.as detailed on drawings and specification for below and
above grade cold water supply system.

1 15mm CWS 9 m

2 20mm CWS 20 m

3 25mm CWS 23 m

4 32mm CWS 3 m

5 40mm CWS 18 m

6 50mm CWS 2 m

Supply and install pipe work including all fittings, supports,


hangers, coding, protection and wrappings warning grid,
etc.as detailed on drawings and specification for below and
above grade hot water supply system.

1 15mm diameter 18 m

2 20mm diameter 29 m

Sanderson International Theme LLC 12 of 32 - MEP


PROPOSED WESTIN MINA SEYAHI WATER PARK, DUBAI, BILLS OF QUANTITIES

UNITED ARAB EMIRATES MEP

TOTAL PRICE
ITEM DESCRIPTION QTY UNIT UNIT RATE
AED

3 32mm diameter 20 m

4 25mm diameter 13 m

5 40mm diameter 14 m

Equipment

1 CP/WR/01 1 nr

2 CP/WR/02 1 nr

20L capacity solar panel with tank and integrated electrical


3 2 nr
backup

Light House

1 Water supply system for light house 1 item

Windmill 1

Supply and install valves with including all accessories etc.


as detailed on drawings and specification.

1 20mm Diameter isolation valve 6 nr

Supply and install pipe work including all fittings, supports,


hangers, coding, protection and wrappings warning grid,
etc.as detailed on drawings and specification for below and
above grade cold water supply system.

1 20mm CWS 15 m

2 25mm CWS 2 m

Supply and install pipe work including all fittings, supports,


hangers, coding, protection and wrappings warning grid,
etc.as detailed on drawings and specification for below and
above grade hot water supply system.

1 20mm diameter 10 m

2 Equipment

3 Electric water heater 2 nr

Windmill 2

Supply and install valves with including all accessories etc.


as detailed on drawings and specification.

1 20mm Diameter isolation valve 3 nr

Supply and install pipe work including all fittings, supports,


hangers, coding, protection and wrappings warning grid,
etc.as detailed on drawings and specification for below and
above grade cold water supply system.

1 20mm CWS 5 m

2 25mm CWS 2 m

Supply and install pipe work including all fittings, supports,


hangers, coding, protection and wrappings warning grid,
etc.as detailed on drawings and specification for below and
above grade hot water supply system.

Sanderson International Theme LLC 13 of 32 - MEP


PROPOSED WESTIN MINA SEYAHI WATER PARK, DUBAI, BILLS OF QUANTITIES

UNITED ARAB EMIRATES MEP

TOTAL PRICE
ITEM DESCRIPTION QTY UNIT UNIT RATE
AED

1 20mm diameter 3 m

Equipment

1 Electric water heater 1 nr

Wave pool machine room

Supply and install complete water supply (connection)


1 1 item
system as specified and detailed in the drawings

Aquaplay machine room

Supply and install complete water supply (connection)


1 1 item
system as specified and detailed in the drawings

Mat racer machine room

Supply and install complete water supply (connection)


1 1 item
system as specified and detailed in the drawings

Body slide machine room

Supply and install complete water supply (connection)


1 1 item
system as specified and detailed in the drawings

Ramp and mini slide machine room

Supply and install complete water supply (connection)


1 1 item
system as specified and detailed in the drawings

Ramp slide multi lane and mini slide machine room

Supply and install complete water supply (connection)


1 1 item
system as specified and detailed in the drawings

DRAINAGE

Entrance washroom

Supply and install below grade drainage pipe work complete


with fittings, warning grid, excavation, granular surround,
geotextile, backfilling, etc. as detailed on drawings and
specification.

1 110mm diameter SP 27 m

2 110mm diameter VP 16 m

3 75mm diameter VP 14 m

4 40mm diameter WP 10 m

5 50mm diameter WP 26 m

6 110mm diameter WP 36 m

Supply and install piping specialties including all necessary


components and accessories etc. as detailed on drawings
and specification.

1 110mm diameter FCO 8 nr

2 50mm diameter FD 24 nr

Sanderson International Theme LLC 14 of 32 - MEP


PROPOSED WESTIN MINA SEYAHI WATER PARK, DUBAI, BILLS OF QUANTITIES

UNITED ARAB EMIRATES MEP

TOTAL PRICE
ITEM DESCRIPTION QTY UNIT UNIT RATE
AED

Supply and install drainage manholes including tanking


membrane, membrane protections, manhole cover and frame
and all other necessary components and accessories etc. as
detailed on drawings and specification.

1 300x300 GT 2 nr

2 600x600 manhole sanitary 18 nr

3 connection from site network 1 nr

Light House

Supply and install below grade drainage pipe work complete


with fittings, warning grid, excavation, granular surround,
geotextile, backfilling, etc. as detailed on drawings and
specification.

1 75mm diameter WP 3 m

2 110mm diameter WP 6 m

Supply and install piping specialties including all necessary


components and accessories etc. as detailed on drawings
and specification.

1 110mm diameter FCO 1 nr

2 50mm diameter FD 2 nr

Supply and install drainage manholes including tanking


membrane, membrane protections, manhole cover and frame
and all other necessary components and accessories etc. as
detailed on drawings and specification.

1 300x300 GT 1 nr

2 600x600 manhole sanitary 1 nr

3 connection from site network 1 nr

Windmill 1

Supply and install below grade drainage pipe work complete


with fittings, warning grid, excavation, granular surround,
geotextile, backfilling, etc. as detailed on drawings and
specification.

1 40mm diameter WP 3 m

2 50mm diameter WP 6 m

3 110mm diameter WP 5 m

4 110mm diameter SP 5 m

5 110mm diameter VP 2 m

6 75mm diameter VP 2 m

7 15mm diameter CDP 2 m

8 160mm diameter 2 m

Sanderson International Theme LLC 15 of 32 - MEP


PROPOSED WESTIN MINA SEYAHI WATER PARK, DUBAI, BILLS OF QUANTITIES

UNITED ARAB EMIRATES MEP

TOTAL PRICE
ITEM DESCRIPTION QTY UNIT UNIT RATE
AED

Supply and install piping specialties including all necessary


components and accessories etc. as detailed on drawings
and specification.

1 110mm diameter FCO 2 nr

2 50mm diameter FD 6 nr

Supply and install drainage manholes including tanking


membrane, membrane protections, manhole cover and frame
and all other necessary components and accessories etc. as
detailed on drawings and specification.

1 300x300 GT 1 nr

2 600x600 manhole sanitary 1 nr

3 connection from site network 1 nr

Windmill 2

Supply and install below grade drainage pipe work complete


with fittings, warning grid, excavation, granular surround,
geotextile, backfilling, etc. as detailed on drawings and
specification.

1 40mm diameter WP 1 m

2 50mm diameter WP 1 m

3 110mm diameter WP 5 m

4 75mm diameter VP 3 m

5 15mm diameter CDP 3 m

6 160mm diameter 2 m

Supply and install piping specialties including all necessary


components and accessories etc. as detailed on drawings
and specification.

1 110mm diameter FCO 1 nr

2 50mm diameter FD 2 nr

Supply and install drainage manholes including tanking


membrane, membrane protections, manhole cover and frame
and all other necessary components and accessories etc. as
detailed on drawings and specification.

1 300x300 GT 1 nr

2 600x600 manhole sanitary 1 nr

3 connection from site network 1 nr

Windmill 3

Supply and install below grade drainage pipe work complete


with fittings, warning grid, excavation, granular surround,
geotextile, backfilling, etc. as detailed on drawings and
specification.

1 25mm diameter WP 7 m

Sanderson International Theme LLC 16 of 32 - MEP


PROPOSED WESTIN MINA SEYAHI WATER PARK, DUBAI, BILLS OF QUANTITIES

UNITED ARAB EMIRATES MEP

TOTAL PRICE
ITEM DESCRIPTION QTY UNIT UNIT RATE
AED

2 50mm diameter WP 1 m

3 110mm diameter WP 3 m

4 110mm diameter SP 3 m

5 75mm diameter VP 1 m

6 15mm diameter CDP 3 m

7 160mm diameter 1 m

Supply and install piping specialties including all necessary


components and accessories etc. as detailed on drawings
and specification.

1 110mm diameter FCO 2 nr

2 50mm diameter FD 2 nr

Supply and install drainage manholes including tanking


membrane, membrane protections, manhole cover and frame
and all other necessary components and accessories etc. as
detailed on drawings and specification.

1 300x300 GT 1 nr

2 600x600 manhole sanitary 1 nr

3 connection from site network 1 nr

Wave pool machine room

Supply and install complete drainage system as specified


1 1 item
and detailed in the drawings

Aquaplay machine room

Supply and install complete drainage system as specified


1 1 item
and detailed in the drawings

Mat racer machine room

Supply and install complete drainage system as specified


1 1 item
and detailed in the drawings

2 Pump SP PR6-01 including pipe work and connections 1 nr

Body slide machine room

Supply and install complete drainage system as specified


1 1 item
and detailed in the drawings

2 Pump SP PR3-01 including pipe work and connections 1 nr

Ramp and mini slide machine room

Supply and install complete drainage system as specified


1 1 item
and detailed in the drawings

2 Pump SP PR5-01 including pipe work and connections 1 nr

Ramp slide multi lane and mini slide machine room

Supply and install complete drainage system as specified


1 1 item
and detailed in the drawings

Sanderson International Theme LLC 17 of 32 - MEP


PROPOSED WESTIN MINA SEYAHI WATER PARK, DUBAI, BILLS OF QUANTITIES

UNITED ARAB EMIRATES MEP

TOTAL PRICE
ITEM DESCRIPTION QTY UNIT UNIT RATE
AED

2 Pump SP PR4-01 including pipe work and connections 1 nr

External works

Pipe works including excavation, bedding surrounding,


wrapping, warning tapes, back filling, reinstating as specified
and as detailed in the drawings

1 External pipe works 1 item

Supply and install drainage manholes, chambers, pits


including tanking membrane, membrane protections,
2 manhole cover and frame and all other necessary 1 item
components and accessories etc. as detailed on drawings
and specification.
manhole Nos- 18
B ELECTRICAL ENGINEERING INSTALLATIONS

Entrance wash room

Supply and install fire rated low voltage cables including


fixings, cable glands, cable straps and terminations etc. as
specified and approved. (cable trays measured elsewhere)

1 Cable work 1 item

Supply and install cable trays complete with associated


fittings and accessories as specified; fixing to concrete /
2 blockwork base or suspended in ceiling voids, including 1 item
supports and fixings etc. as detailed on drawings and
specification.

Supply and install lighting control system including lighting


control, cabling, inter-connections and accessories etc. as
detailed on drawings and specification.

1 Emergency lighting monitoring panel 1 nr

Supply and install medium/ low voltage panels including air


circuits breakers, bus bars, bus couplers, MCCBs,
instruments and all other necessary components &
accessories etc. as required for a fully functional and
complete installation in accordance with the specifications
and drawings (cable measured separately)

1 MDB 1 nr

Supply and install distribution boards including circuits


breakers, bus bars, instruments and all other necessary
components & accessories etc. as required for a fully
functional and complete installation in accordance with the
specifications and drawings (cable measured separately)

1 DB-EW 1 nr

Supply and install wiring devices including wiring, conduit


and all necessary accessories etc. as required for a fully
functional and complete installation in accordance with the
specifications and drawings.

1 20A one-way lighting switch with 20min. Timer 1 nr

2 Optical network termination unit/ twin socket outlet 1 nr

3 switched fused connection unit 8 nr

4 13A IP65 maintenance socket 1 nr

Sanderson International Theme LLC 18 of 32 - MEP


PROPOSED WESTIN MINA SEYAHI WATER PARK, DUBAI, BILLS OF QUANTITIES

UNITED ARAB EMIRATES MEP

TOTAL PRICE
ITEM DESCRIPTION QTY UNIT UNIT RATE
AED

Supply and install isolators including all required accessories


as required for a fully functional and complete installation
(cable measured separately)

1 32A isolator 1 nr

2 20A isolator 1 nr

Supply and install interior lighting system complete with


lamps, tubes, reflectors, control gear, transformers, switches,
power supply units, fixings, accessories including ceiling
roses, switches, conduit, flexible cabling and wiring, as
required for a fully functional and complete installation

1 Type, D1 19 nr

2 Type, A1 7 nr

3 Type, L1 2 nr

4 Type, E1 4 nr

5 Type, E2 2 nr

6 Type, Exit 2 nr

7 PIR 5 nr

8 Earthing and protection works 1 item

Light House

Supply and install fire rated low voltage cables including


fixings, cable glands, cable straps and terminations etc. as
specified and approved. (cable trays measured elsewhere)

1 Cable work 1 item

Supply and install cable trays complete with associated


fittings and accessories as specified; fixing to concrete /
2 blockwork base or suspended in ceiling voids, including 1 item
supports and fixings etc. as detailed on drawings and
specification.

Supply and install distribution boards including circuits


breakers, bus bars, instruments and all other necessary
components & accessories etc. as required for a fully
functional and complete installation in accordance with the
specifications and drawings (cable measured separately)

1 DB-LH 1 nr

Supply and install wiring devices including wiring, conduit


and all necessary accessories etc. as required for a fully
functional and complete installation in accordance with the
specifications and drawings.

1 switched fused connection unit 4 nr

2 13A IP65 maintenance socket 13 nr

Supply and install isolators including all required accessories


as required for a fully functional and complete installation
(cable measured separately)

1 20A isolator 1 nr

Sanderson International Theme LLC 19 of 32 - MEP


PROPOSED WESTIN MINA SEYAHI WATER PARK, DUBAI, BILLS OF QUANTITIES

UNITED ARAB EMIRATES MEP

TOTAL PRICE
ITEM DESCRIPTION QTY UNIT UNIT RATE
AED

Supply and install interior lighting system complete with


lamps, tubes, reflectors, control gear, transformers, switches,
power supply units, fixings, accessories including ceiling
roses, switches, conduit, flexible cabling and wiring, as
required for a fully functional and complete installation

1 Type, D2 11 nr

2 Type, S1 2 nr

3 Type, W1 1 nr

4 Type, E2 2 nr

5 Earthing and protection works 1 item

Windmill 1

Supply and install fire rated low voltage cables including


fixings, cable glands, cable straps and terminations etc. as
specified and approved. (cable trays measured elsewhere)

1 Cable work 1 item

Supply and install cable trays complete with associated


fittings and accessories as specified; fixing to concrete /
2 blockwork base or suspended in ceiling voids, including 1 item
supports and fixings etc. as detailed on drawings and
specification.

Supply and install lighting control system including lighting


control, cabling, inter-connections and accessories etc. as
detailed on drawings and specification.

1 Emergency lighting monitoring panel 1 nr

Supply and install distribution boards including circuits


breakers, bus bars, instruments and all other necessary
components & accessories etc. as required for a fully
functional and complete installation in accordance with the
specifications and drawings (cable measured separately)

1 DB-T1 1 nr

Supply and install wiring devices including wiring, conduit


and all necessary accessories etc. as required for a fully
functional and complete installation in accordance with the
specifications and drawings.

1 Switches 1 Item

Supply and install isolators including all required accessories


as required for a fully functional and complete installation
(cable measured separately)

1 20A isolator 1 Item

Supply and install interior lighting system complete with


lamps, tubes, reflectors, control gear, transformers, switches,
power supply units, fixings, accessories including ceiling
roses, switches, conduit, flexible cabling and wiring, as
required for a fully functional and complete installation

1 Type, D2 6 nr

Sanderson International Theme LLC 20 of 32 - MEP


PROPOSED WESTIN MINA SEYAHI WATER PARK, DUBAI, BILLS OF QUANTITIES

UNITED ARAB EMIRATES MEP

TOTAL PRICE
ITEM DESCRIPTION QTY UNIT UNIT RATE
AED

2 Type, L1 1 nr

3 Type, E2 3 nr

4 Earthing and protection works 1 item

Windmill 2

Supply and install fire rated low voltage cables including


fixings, cable glands, cable straps and terminations etc. as
specified and approved. (cable trays measured elsewhere)

1 Cable work 1 item

Supply and install cable trays complete with associated


fittings and accessories as specified; fixing to concrete /
2 blockwork base or suspended in ceiling voids, including 1 item
supports and fixings etc. as detailed on drawings and
specification.

Supply and install lighting control system including lighting


control, cabling, inter-connections and accessories etc. as
detailed on drawings and specification.

1 Emergency lighting monitoring panel 1 item

Supply and install distribution boards including circuits


breakers, bus bars, instruments and all other necessary
components & accessories etc. as required for a fully
functional and complete installation in accordance with the
specifications and drawings (cable measured separately)

1 DB-RET 1 nr

Supply and install wiring devices including wiring, conduit


and all necessary accessories etc. as required for a fully
functional and complete installation in accordance with the
specifications and drawings.

Switches 1 Item

Supply and install isolators including all required accessories


as required for a fully functional and complete installation
(cable measured separately)

1 20A isolator 1 Item

Supply and install interior lighting system complete with


lamps, tubes, reflectors, control gear, transformers, switches,
power supply units, fixings, accessories including ceiling
roses, switches, conduit, flexible cabling and wiring, as
required for a fully functional and complete installation

1 Type, D2 4 nr

2 Type, E2 1 nr

3 Earthing and protection works 1 item

Windmill 3

Supply and install fire rated low voltage cables including


fixings, cable glands, cable straps and terminations etc. as
specified and approved. (cable trays measured elsewhere)

1 Cable work 1 item

Sanderson International Theme LLC 21 of 32 - MEP


PROPOSED WESTIN MINA SEYAHI WATER PARK, DUBAI, BILLS OF QUANTITIES

UNITED ARAB EMIRATES MEP

TOTAL PRICE
ITEM DESCRIPTION QTY UNIT UNIT RATE
AED

Supply and install cable trays complete with associated


fittings and accessories as specified; fixing to concrete /
2 blockwork base or suspended in ceiling voids, including 1 item
supports and fixings etc. as detailed on drawings and
specification.

Supply and install lighting control system including lighting


control, cabling, inter-connections and accessories etc. as
detailed on drawings and specification.

1 Emergency lighting monitoring panel 1 item

Supply and install distribution boards including circuits


breakers, bus bars, instruments and all other necessary
components & accessories etc. as required for a fully
functional and complete installation in accordance with the
specifications and drawings (cable measured separately)

1 DB-T2 1 nr

Supply and install wiring devices including wiring, conduit


and all necessary accessories etc. as required for a fully
functional and complete installation in accordance with the
specifications and drawings.

1 Switches 1 Item

Supply and install isolators including all required accessories


as required for a fully functional and complete installation
(cable measured separately)

1 20A isolator 1 Item

Supply and install interior lighting system complete with


lamps, tubes, reflectors, control gear, transformers, switches,
power supply units, fixings, accessories including ceiling
roses, switches, conduit, flexible cabling and wiring, as
required for a fully functional and complete installation

1 Type, D2 4 nr

2 Type, E2 2 nr

3 Earthing and protection works 1 item

Wave pool machine room

Supply and install fire rated low voltage cables including


fixings, cable glands, cable straps and terminations etc. as
specified and approved. (cable trays measured elsewhere)

1 4CX10 mm² Cu/XLPE/SWA/LSF + 10mm² CPC 10 m

2 4CX35 mm² Cu/XLPE/SWA/LSF + 16mm² CPC 10 m

Supply and install cable trays complete with associated


fittings and accessories as specified; fixing to concrete /
3 blockwork base or suspended in ceiling voids, including 1 item
supports and fixings etc. as detailed on drawings and
specification.

Supply and install lighting control system including lighting


control, cabling, inter-connections and accessories etc. as
detailed on drawings and specification.

1 20A one-way lighting switch with 20min. Timer 1 nr

Sanderson International Theme LLC 22 of 32 - MEP


PROPOSED WESTIN MINA SEYAHI WATER PARK, DUBAI, BILLS OF QUANTITIES

UNITED ARAB EMIRATES MEP

TOTAL PRICE
ITEM DESCRIPTION QTY UNIT UNIT RATE
AED

Supply and install medium/ low voltage panels including air


circuits breakers, bus bars, bus couplers, MCCBs,
instruments and all other necessary components &
accessories etc. as required for a fully functional and
complete installation in accordance with the specifications
and drawings (cable measured separately)

1 MCC1&2 2 nr

2 SMDB-WP 1 nr

Supply and install distribution boards including circuits


breakers, bus bars, instruments and all other necessary
components & accessories etc. as required for a fully
functional and complete installation in accordance with the
specifications and drawings (cable measured separately)

1 DB-WP 1 nr

Supply and install wiring devices including wiring, conduit


and all necessary accessories etc. as required for a fully
functional and complete installation in accordance with the
specifications and drawings.

1 Optical network termination unit/ twin socket outlet 1 nr

2 13A IP65 maintenance socket 2 nr

Supply and install isolators including all required accessories


as required for a fully functional and complete installation
(cable measured separately)

1 20A isolator 2 nr

Supply and install interior lighting system complete with


lamps, tubes, reflectors, control gear, transformers, switches,
power supply units, fixings, accessories including ceiling
roses, switches, conduit, flexible cabling and wiring, as
required for a fully functional and complete installation

1 Type, A1 7 nr

2 Type, E2 2 nr

3 Type, Exit 1 nr

4 Earthing and protection works 1 item

Aquaplay machine room

Supply and install fire rated low voltage cables including


fixings, cable glands, cable straps and terminations etc. as
specified and approved. (cable trays measured elsewhere)

1 4CX10 mm² Cu/XLPE/SWA/LSF + 10mm² CPC 10 m

2 4CX35 mm² Cu/XLPE/SWA/LSF + 16mm² CPC 10 m

Supply and install cable trays complete with associated


fittings and accessories as specified; fixing to concrete /
3 blockwork base or suspended in ceiling voids, including 1 item
supports and fixings etc. as detailed on drawings and
specification.

Sanderson International Theme LLC 23 of 32 - MEP


PROPOSED WESTIN MINA SEYAHI WATER PARK, DUBAI, BILLS OF QUANTITIES

UNITED ARAB EMIRATES MEP

TOTAL PRICE
ITEM DESCRIPTION QTY UNIT UNIT RATE
AED

Supply and install lighting control system including lighting


control, cabling, inter-connections and accessories etc. as
detailed on drawings and specification.

1 20A one-way lighting switch with 20min. Timer 1 nr

Supply and install medium/ low voltage panels including air


circuits breakers, bus bars, bus couplers, MCCBs,
instruments and all other necessary components &
accessories etc. as required for a fully functional and
complete installation in accordance with the specifications
and drawings (cable measured separately)

1 MCC3 1 nr

2 SMDB-AP 1 nr

Supply and install distribution boards including circuits


breakers, bus bars, instruments and all other necessary
components & accessories etc. as required for a fully
functional and complete installation in accordance with the
specifications and drawings (cable measured separately)

1 DB-AP 1 nr

Supply and install wiring devices including wiring, conduit


and all necessary accessories etc. as required for a fully
functional and complete installation in accordance with the
specifications and drawings.

1 Optical network termination unit/ twin socket outlet 1 nr

2 13A IP65 maintenance socket 3 nr

Supply and install isolators including all required accessories


as required for a fully functional and complete installation
(cable measured separately)

1 20A isolator 2 nr

Supply and install interior lighting system complete with


lamps, tubes, reflectors, control gear, transformers, switches,
power supply units, fixings, accessories including ceiling
roses, switches, conduit, flexible cabling and wiring, as
required for a fully functional and complete installation

1 Type, A1 10 nr

2 Type, E2 4 nr

3 Earthing and protection works 1 item

Mat racer machine room

Supply and install fire rated low voltage cables including


fixings, cable glands, cable straps and terminations etc. as
specified and approved. (cable trays measured elsewhere)

1 4CX10 mm² Cu/XLPE/SWA/LSF + 10mm² CPC 10 m

2 4CX35 mm² Cu/XLPE/SWA/LSF + 16mm² CPC 10 m

Supply and install cable trays complete with associated


fittings and accessories as specified; fixing to concrete /
3 blockwork base or suspended in ceiling voids, including 1 item
supports and fixings etc. as detailed on drawings and
specification.

Sanderson International Theme LLC 24 of 32 - MEP


PROPOSED WESTIN MINA SEYAHI WATER PARK, DUBAI, BILLS OF QUANTITIES

UNITED ARAB EMIRATES MEP

TOTAL PRICE
ITEM DESCRIPTION QTY UNIT UNIT RATE
AED

Supply and install lighting control system including lighting


control, cabling, inter-connections and accessories etc. as
detailed on drawings and specification.

1 20A one-way lighting switch with 20min. Timer 1 nr

Supply and install medium/ low voltage panels including air


circuits breakers, bus bars, bus couplers, MCCBs,
instruments and all other necessary components &
accessories etc. as required for a fully functional and
complete installation in accordance with the specifications
and drawings (cable measured separately)

1 MCC4 1 nr

2 SMDB-AR 1 nr

Supply and install distribution boards including circuits


breakers, bus bars, instruments and all other necessary
components & accessories etc. as required for a fully
functional and complete installation in accordance with the
specifications and drawings (cable measured separately)

1 DB-MR 1 nr

Supply and install wiring devices including wiring, conduit


and all necessary accessories etc. as required for a fully
functional and complete installation in accordance with the
specifications and drawings.

1 Optical network termination unit/ twin socket outlet 1 nr

2 13A IP65 maintenance socket 2 nr

Supply and install isolators including all required accessories


as required for a fully functional and complete installation
(cable measured separately)

1 20A isolator 2 nr

Supply and install interior lighting system complete with


lamps, tubes, reflectors, control gear, transformers, switches,
power supply units, fixings, accessories including ceiling
roses, switches, conduit, flexible cabling and wiring, as
required for a fully functional and complete installation

1 Type, A1 3 nr

2 Type, A1/E 3 nr

3 Earthing and protection works 1 item

Body slide machine room

Supply and install fire rated low voltage cables including


fixings, cable glands, cable straps and terminations etc. as
specified and approved. (cable trays measured elsewhere)

1 4CX10 mm² Cu/XLPE/SWA/LSF + 10mm² CPC 20 m

2 4CX35 mm² Cu/XLPE/SWA/LSF + 16mm² CPC 10 m

Sanderson International Theme LLC 25 of 32 - MEP


PROPOSED WESTIN MINA SEYAHI WATER PARK, DUBAI, BILLS OF QUANTITIES

UNITED ARAB EMIRATES MEP

TOTAL PRICE
ITEM DESCRIPTION QTY UNIT UNIT RATE
AED

Supply and install cable trays complete with associated


fittings and accessories as specified; fixing to concrete /
3 blockwork base or suspended in ceiling voids, including 1 item
supports and fixings etc. as detailed on drawings and
specification.

Supply and install lighting control system including lighting


control, cabling, inter-connections and accessories etc. as
detailed on drawings and specification.

1 20A one-way lighting switch with 20min. Timer 1 nr

2 LCP-1 1 nr

Supply and install medium/ low voltage panels including air


circuits breakers, bus bars, bus couplers, MCCBs,
instruments and all other necessary components &
accessories etc. as required for a fully functional and
complete installation in accordance with the specifications
and drawings (cable measured separately)

1 MCC5 1 nr

2 SMDB-BS 1 nr

Supply and install distribution boards including circuits


breakers, bus bars, instruments and all other necessary
components & accessories etc. as required for a fully
functional and complete installation in accordance with the
specifications and drawings (cable measured separately)

1 DB-BS 1 nr

Supply and install wiring devices including wiring, conduit


and all necessary accessories etc. as required for a fully
functional and complete installation in accordance with the
specifications and drawings.

Optical network termination unit/ twin socket outlet 1 nr


1
2 13A IP65 maintenance socket 3 nr

Supply and install isolators including all required accessories


as required for a fully functional and complete installation
(cable measured separately)

1 20A isolator 2 nr

Supply and install interior lighting system complete with


lamps, tubes, reflectors, control gear, transformers, switches,
power supply units, fixings, accessories including ceiling
roses, switches, conduit, flexible cabling and wiring, as
required for a fully functional and complete installation

1 Type, A1 10 nr

2 Type, E2 4 nr

3 Earthing and protection works 1 item

Ramp and mini slide machine room

Supply and install fire rated low voltage cables including


fixings, cable glands, cable straps and terminations etc. as
specified and approved. (cable trays measured elsewhere)

Sanderson International Theme LLC 26 of 32 - MEP


PROPOSED WESTIN MINA SEYAHI WATER PARK, DUBAI, BILLS OF QUANTITIES

UNITED ARAB EMIRATES MEP

TOTAL PRICE
ITEM DESCRIPTION QTY UNIT UNIT RATE
AED

1 4CX10 mm² Cu/XLPE/SWA/LSF + 10mm² CPC 20 m

2 4CX16 mm² Cu/XLPE/SWA/LSF + 16mm² CPC 10 m

Supply and install cable trays complete with associated


fittings and accessories as specified; fixing to concrete /
3 blockwork base or suspended in ceiling voids, including 1 item
supports and fixings etc. as detailed on drawings and
specification.

Supply and install lighting control system including lighting


control, cabling, inter-connections and accessories etc. as
detailed on drawings and specification.

1 20A one-way lighting switch with 20min. Timer 1 nr

2 LCP-2 1 nr

Supply and install medium/ low voltage panels including air


circuits breakers, bus bars, bus couplers, MCCBs,
instruments and all other necessary components &
accessories etc. as required for a fully functional and
complete installation in accordance with the specifications
and drawings (cable measured separately)

1 MCC6 1 nr

2 SMDB-RSMS 1 nr

Supply and install distribution boards including circuits


breakers, bus bars, instruments and all other necessary
components & accessories etc. as required for a fully
functional and complete installation in accordance with the
specifications and drawings (cable measured separately)

1 DB-RSMS 1 nr

Supply and install wiring devices including wiring, conduit


and all necessary accessories etc. as required for a fully
functional and complete installation in accordance with the
specifications and drawings.

1 Optical network termination unit/ twin socket outlet 1 nr

2 13A IP65 maintenance socket 3 nr

Supply and install isolators including all required accessories


as required for a fully functional and complete installation
(cable measured separately)

1 20A isolator 2 nr

Supply and install interior lighting system complete with


lamps, tubes, reflectors, control gear, transformers, switches,
power supply units, fixings, accessories including ceiling
roses, switches, conduit, flexible cabling and wiring, as
required for a fully functional and complete installation

1 Type, A1 8 nr

2 Type, E2 4 nr

3 Earthing and protection works 1 item

Ramp slide multi lane and mini slide machine room

Sanderson International Theme LLC 27 of 32 - MEP


PROPOSED WESTIN MINA SEYAHI WATER PARK, DUBAI, BILLS OF QUANTITIES

UNITED ARAB EMIRATES MEP

TOTAL PRICE
ITEM DESCRIPTION QTY UNIT UNIT RATE
AED

Supply and install fire rated low voltage cables including


fixings, cable glands, cable straps and terminations etc. as
specified and approved. (cable trays measured elsewhere)

1 4CX10 mm² Cu/XLPE/SWA/LSF + 10mm² CPC 10 m

2 4CX16 mm² Cu/XLPE/SWA/LSF + 16mm² CPC 10 m

3 4CX6 mm² Cu/XLPE/SWA/LSF + 6mm² CPC 10 m

Supply and install cable trays complete with associated


fittings and accessories as specified; fixing to concrete /
4 blockwork base or suspended in ceiling voids, including 1 item
supports and fixings etc. as detailed on drawings and
specification.

Supply and install lighting control system including lighting


control, cabling, inter-connections and accessories etc. as
detailed on drawings and specification.

1 20A one-way lighting switch with 20min. Timer 1 nr

2 LCP-3 1 nr

Supply and install medium/ low voltage panels including air


circuits breakers, bus bars, bus couplers, MCCBs,
instruments and all other necessary components &
accessories etc. as required for a fully functional and
complete installation in accordance with the specifications
and drawings (cable measured separately)

1 MCC7 1 nr

2 SMDB-RSMSM 1 nr

Supply and install distribution boards including circuits


breakers, bus bars, instruments and all other necessary
components & accessories etc. as required for a fully
functional and complete installation in accordance with the
specifications and drawings (cable measured separately)

1 DB-RSMSM 1 nr

Supply and install wiring devices including wiring, conduit


and all necessary accessories etc. as required for a fully
functional and complete installation in accordance with the
specifications and drawings.

1 Optical network termination unit/ twin socket outlet 1 nr

2 13A IP65 maintenance socket 3 nr

Supply and install isolators including all required accessories


as required for a fully functional and complete installation
(cable measured separately)

1 20A isolator 2 nr

Supply and install interior lighting system complete with


lamps, tubes, reflectors, control gear, transformers, switches,
power supply units, fixings, accessories including ceiling
roses, switches, conduit, flexible cabling and wiring, as
required for a fully functional and complete installation

1 Type, A1 6 nr

Sanderson International Theme LLC 28 of 32 - MEP


PROPOSED WESTIN MINA SEYAHI WATER PARK, DUBAI, BILLS OF QUANTITIES

UNITED ARAB EMIRATES MEP

TOTAL PRICE
ITEM DESCRIPTION QTY UNIT UNIT RATE
AED

2 Type, E2 3 nr

3 Type, Exit 1 nr

4 Earthing and protection works 1 item

External works

Supply and install low voltage cables including fixings, cable


glands, cable straps and terminations etc. excavation, duct
work, warning tapes, back filling, reinstating as specified and
as detailed in the drawings

1 4CX16 mm² Cu/XLPE/SWA/LSF + 16mm² CPC 250 m

2 4CX35 mm² Cu/XLPE/SWA/LSF + 16mm² CPC 120 m

3 4CX50 mm² Cu/XLPE/SWA/LSF + 25mm² CPC 30 m

4 4CX70 mm² Cu/XLPE/SWA/LSF + 35mm² CPC 180 m

5 4CX95 mm² Cu/XLPE/SWA/LSF + 50mm² CPC 96 m

6 4x4C 300mm + 4x1C 150mm CPC 240 m

Supply and install drainage manholes, chambers, pits


including tanking membrane, membrane protections,
7 manhole cover and frame and all other necessary 1 item
components and accessories etc. as detailed on drawings
and specification.

8 Connections 1 item

C IRRIGATION SYSTEM

Spray system

Supply and install Upvc class E pipe work including


fittings,valves,emitters, excavation, sand bedding, back filling
as specified, cart away surplus, warning tape makers, trust
blocks, all as specified.

1 1" Diameter 393 m

Supply and install Upvc class D pipe work including


fittings,valves,emitters, excavation, sand bedding, back filling
as specified, cart away surplus, warning tape makers, trust
blocks, all as specified.

1 1.5" Diameter 39 m

2 2" Diameter 23 m

Supply and install nozzle with including all accessories etc.


as detailed on drawings and specification.

1 12H Nozzle 46 nr

2 12F Nozzle 32 nr

3 12Q Nozzle 13 nr

4 12T Nozzle 2 nr

5 12TQ Nozzle 2 nr

Sanderson International Theme LLC 29 of 32 - MEP


PROPOSED WESTIN MINA SEYAHI WATER PARK, DUBAI, BILLS OF QUANTITIES

UNITED ARAB EMIRATES MEP

TOTAL PRICE
ITEM DESCRIPTION QTY UNIT UNIT RATE
AED

6 8F Nozzle 11 nr

7 8T Nozzle 4 nr

8 8Q Nozzle 11 nr

9 8H Nozzle 26 nr

10 15H Nozzle 13 nr

11 15Q Nozzle 4 nr

12 15TQ Nozzle 2 nr

Main IRR line

Supply and install Upvc class E pipe work including


fittings,valves,emitters, excavation, sand bedding, back filling
as specified, cart away surplus, warning tape makers, trust
blocks, all as specified.

1 Conduit 252 m

Supply and install Upvc class D pipe work including


fittings,valves,emitters, excavation, sand bedding, back filling
as specified, cart away surplus, warning tape makers, trust
blocks, all as specified.

1 2" Diameter 25 m

2 3" Diameter 225 m

Drip network

Supply and install Upvc class E pipe work including


fittings,valves,emitters, excavation, sand bedding, back filling
as specified, cart away surplus, warning tape makers, trust
blocks, all as specified.

1 1" Diameter 628 m

Supply and install Upvc class D pipe work including


fittings,valves,emitters, excavation, sand bedding, back filling
as specified, cart away surplus, warning tape makers, trust
blocks, all as specified.

1 1.5" Diameter 198 m

2 2" Diameter 36 m

Supply and install valves with including all accessories etc.


as detailed on drawings and specification.

1 Solenoid drip valve 242 nr

2 Isolation valve 3 nr

3 Valve D1, 1.5" diameter 1 nr

4 Valve D2, 1.5" diameter 1 nr

5 Valve D2, 1.5" diameter 1 nr

6 Valve S6, 1" diameter 1 nr

7 Valve S7, 1" diameter 1 nr

Sanderson International Theme LLC 30 of 32 - MEP


PROPOSED WESTIN MINA SEYAHI WATER PARK, DUBAI, BILLS OF QUANTITIES

UNITED ARAB EMIRATES MEP

TOTAL PRICE
ITEM DESCRIPTION QTY UNIT UNIT RATE
AED

8 Valve S8, 1.5" diameter 1 nr

9 Valve S1, 1.5" diameter 1 nr

10 Valve S2, 1.5" diameter 1 nr

11 Valve S3, 1.5" diameter 1 nr

12 Valve S5, 1" diameter 1 nr

13 Valve S4, 1" diameter 1 nr

14 Quick coupling valve 8 nr

Allow for control system including trenches, pull boxes,


terminations etc. as detailed on drawings and specification.

1 Controllers 10 nr

2 Pull box 23 nr

3 Satellite Controllers 2 nr

4 Pipe Sleeves

5 1x6"/1x2" 8 m

6 1x6"/1x3" 13 m

7 1x4"/1x2" 3 m
8
1x6"/1x4" 9 m
9
1x3" 27 m
10
1x2" 70 m
11
1x4" 3 m

ADDITIONAL ITEMS

The tenderer is to detail below any additional items with


quantities and rates not previously included to complete the
build up to the lump sum tender price for this section of the
works. Should the tenderer fail to insert any items here it
will be deemed that his lump sum price for the tender
includes all items and no subsequent claim for any
additional item will be entertained.

CARRIED TO GRAND SUMMARY -

Sanderson International Theme LLC 31 of 32 - MEP