The document requests the party to:
1) Provide a dedicated 11kV corridor for switchgear #5 with the same special conditions as existing switchgears.
2) Submit harmonic calculations to DEWA after selecting the contractor and variable frequency drives, with final approval provided later.
3) Ensure the cable route from the plot limit to the substation follows the T-T section standard.
The document requests the party to:
1) Provide a dedicated 11kV corridor for switchgear #5 with the same special conditions as existing switchgears.
2) Submit harmonic calculations to DEWA after selecting the contractor and variable frequency drives, with final approval provided later.
3) Ensure the cable route from the plot limit to the substation follows the T-T section standard.
The document requests the party to:
1) Provide a dedicated 11kV corridor for switchgear #5 with the same special conditions as existing switchgears.
2) Submit harmonic calculations to DEWA after selecting the contractor and variable frequency drives, with final approval provided later.
3) Ensure the cable route from the plot limit to the substation follows the T-T section standard.
corridor for switchgear #5 with the same special conditions mentioned for the existing 11kV switchgears.
2-Harmonic calculations will be submitted to
DEWA after assigning the contractor and after final selection of the VFD’s; accordingly, final approval shall be provided in later stage after submitting the mentioned document.