DESIGN VERIFICATION PLAN REPORT Page : 1 of 2

BAJA SAEINDIA DVP&R TEMPLATE


mBAJA/eBAJA: Team ID: BAJA SAEINDIA CAR NO.:
Old/New Team: Name of the College:
Team Member(s) Responsible:
Sl. No. Level: Vehicle, Performance Target Acceptance Criteria / Target
Aggregate or part

10

Note:
1. Each team is expected to perform DVPR for minimum total 10 No's of components/ systems/ vehicle levels compulsorily
2) Performance targets are same as those listed in Design Report for vehicle & aggregates. e.g. Stopping distance after braking.
3) On an average conduce two or three tests/ attemps for each component.

AIR-DVPR_06.03.02
DESIGN VERIFICATION PLAN REPORT Page : 2 of 2

Date:
Team Name:
Faculty Advisor:

Validation Test Resource/ No. of Start Dt. Finish Dt. Remarks Report Nos.
Test & Method Equipments Tests
used

compulsorily
ance after braking.

AIR-DVPR_06.03.02