You are on page 1of 1

PROCEDURE Doc No.

: QP-002
FOR Rev. No.: 7
LIQUID PENETRANT EXAMINATION Issue Date: 01-01-2020
Page No.: Page 1 of 12

PROCEDURE
FOR LIQUID PENETRANT EXAMINATION

Rev. No. Date Description

Para 9.1 Revised with addition of


4 08.12.2010 Final interpretation shall be done not earlier
than 10min and not later than 30 minutes after
developer coating is dry.

Para 8.6 Revised with addition of


5 28.10.2015 Illumination requirements clarified
Illumination (natural or supplemental white light)
of the examination surface is required for the
evaluation of indications.

7 01.01.2020 Para 9.0 VISIBLE LIGHT INTENSITY


1076 Lux & Liquid Penetrant
Examination Report 1076 Lux

PREPARED BY: APPROVED BY: ACCEPTED BY: REVIEWED BY:

NDT LEVEL-II NDE LEVEL III IC-QC AI

You might also like