Professional Documents
Culture Documents
E-Mail: gtmdeb96@gmail.com,
radiantndtgroup@gmail.com
PROFESSIONAL PROFILE
A competent professional with over 20 years of experience in Project Management, Weldingp(WPS/PQR) & Inspection,
Quality Control & Assurance (RTFI, UT & advance UT of Plate & Welding Joints), Visual Testing, etc.
Exposure gained through working across Ship Manufacturing, Refinery, Petrochemical, LNG, CNG, Hydro & Thermal
Power Projects in the field of Fabrication, Erection, Modules, Barge, Rig & Land Rig, etc.
Coordination with third party inspection agency, NDT agencies e.g. (DNV, SGS, BVIL, Lloyd, IOCL, DCPL, BHEL, etc.).
Developing , Qualifying, approving NDT procedure as per Client’s Specification & Standards.
Proficient in streamlining processes / procedures to facilitate robust Quality Management Systems.
Adept with welding procedures & welders performance qualifications as per International /National Codes & Standards
Demonstrated abilities in managing various operations as per the set parameters & standards, steered efforts towards
visual inspection / failure pattern all types of refinery equipment necessary NDT for evaluation and provided short term
and long term solutions
Possess excellent analytical and planning skills with abilities in leading team members and institutionalizing, developing
& inculcating the quality culture through core technical expertise.
Involved with PCN Training & Examination BINDT through AQB in India.
Key Skills include:
ASME Audit Consultancy(NDT) Quality Assurance and Control Quality Audit
Ultrasonic Testing Radiographic Testing Procedure Validation
CORE COMPETENCIES
Nov’12 – till date: RADIANT NDT SERVICES, KOLKATA as NDT Technical Advisor
SMART TECHNOCRAFTS & CONSULTANCY, Mumbai (Technical NDT Manager)
Project Exposure
Title : NDT Consultant & BINDT Approved Examiner.
Location : VARIOUS PROJECT(as below).
RELIANCE Jamnagar, IOCL Barauni, Mpthura & MPCL Mumbai, Holdia Petro Chemixal ,
Hydro Power Plant In Sikim,Hindustant Constrution Ltd & Pahaerpur Cooling Towers (Exergy
Project).
Classification : Class ASME, ABS, DNV, BSEN & BV.
Role :
Preparing the ISO Documents, Quality Manual of AMS, Procedure for NDT and Safety as per Clients Specifications or
Codes.
Arranging/Guidance the NDT personnel and weekly toolbox meeting 65 to 7o NDT Personnel’s and monthly double-
cross-Checked (specially UT) Jobs and as per DNV requirement.
Attend the meeting with Clients by Monthly basis or as require.
Preparing & approved the DNV, ASME, ISO Documents, Quality Manual , Procedure for NDT and
Safety as per Clients Specifications or Codes.Attend the meeting with Clients as require.
Oct’ 11 – Oct’ 12: Saipem Singapore Pte. Limited as NDT& Welding Supervisor
Project Exposure
Title : CASTORONE PLV Project.
Location : Benoi Shipyard, Singapore
Classification : Class ABS +A1, Crane Service, HELIDK, Pipe Laying Service, Ice Class A0, Ice Class IA, (E),
+AMS,+ACCU, +DPS- 3, TCM Additional notations: UWILD, RRDA, CRC
Dimensions : Length (o.a.): 330 m excluding ramp/stinger Moulded breadth: 39 m, Operational draft: min.
9.5 m, max. 10.6 m, Transit draft: 10 m approx. Displacement: 100,000 t Atmax.
Operational Draft.
Role :
Spearheading entire gamut of quality assurance functions including reviewing &witnessing the WPS, Welder
qualification, NDT Procedure.
Conducting everydayinspection of Hull Structural & Pipe Fit up, welding and ultrasonicdouble cross-Checked Jobs
Witnessing NDT activities for completed weld joints UT, PT and MT witness, RT Film Interpretation, as per specification
code.
Efficiently performing welding inspection in Offshore/Onshore Welding activities
Accountable for performing activities related to thickness monitoring for a small diameter pipeline (0.5 inches to 2.5
inches) using Profile Radiographic Technique.
Spearheaded project on World largest Pipe Laying Vessel, S Lay & J Lay facility, DP III, ABS classification.
Involved end to end operations right from incoming material inspection stage in China, until Marine sea trial stage In
Singapore.
Daily basis inspection of RAMs, Witness of Lab testing for WPS, Film Reviewing.
Conducting Welders Qualification Test and inspection of RFI Fit up, Welding & Roundness test.
Reviewed & Final interpretation of PAUT and TOFD with Tomo View data collection by MX-2.
Nov’ 02 – Jan’ 07: M/s. Reliance Petrochemicals, Jamnagar, India as NDT Coordinator
Role:
FCCU, CRU 1 & 2COKER R1A, R1B & R1C Pipe to Pipe Welding and Nozzle Joints.
Radiography Film Interpretation, Ultrasonic as well as Magnetic Particle Testing.
Nozzles Modification 3 meter dia.
Data collection & interpretation of PAUT with for data collection by MX.
Professional Certification
ASNTNDT Level-3 in ID No. 159649 Expire Date PCN ID No.332816 Expire Date
o Liquid Penetrant Testing 07/2020 Ultrasonic Testing LEVEL-3 03.07.2023
o Magnetic Particle Testing 11/2020 Magnetic Particle Testing L-2 20.11.2021
o Radiographic Testing 11/2020 Radiographic Testing L-2 20.11.2021
o Ultrasonic Testing 11/2020 Liquid Penetrant Testing L-2 20.11.2021
o Visual Testing 11/2020 Visual Testing Level-2 Result not yet come
ASNT Level II Certificate in PAUT & TOFD (Reliance &RDTech, Canada) in 2006
Fast Aid, Safety & Heavy Equipment Lifting in Saipem
PCN PAUT & TOFD certificate laps due incident of NDT International.
PERSONAL DETAILS