Does the supplier has developed a full contingency plan, including strikes, energy supply
5 issues, raw material supply shortage, serious damage to production equipment and/or 5
tooling, serious damage to the production facility, disaster recovery s. a. flooding,
3 Daily checksheet for equipment condition records, include pokayoke function (if any) 13
Drawing important characteristics are specified into control plan, inspection standard,
1 inspection report, line, etc
14
Quality Control 2 Confirm control plan and WI revision related to previous defect countermeasure 15
Does the organization maintain its facility in a state of order, cleanliness and repair
1 consistent with the product and manufacturing process needs
17
1 Are inspections and calibrations of gauges and measuring equipment based on the plan 25
Is there a process to ensure a MSA is done for all measuring and test equipment prior
4 release for production ? 28
ls there a project organization (project management) established and are tasks &
1 authorities specified for the team leader and team members?
32
ls the transfer of the project from project phase to production controlled in order to
4 secure the product launch ? 35
3 Is there a standard for the follow-up system when unskilled workers work 38
Supplier Evaluation Point
(Self Assessment) AAI Evaluation Point
Item Control Item Check Weakness Point
0 1 2 3 0 1 2 3
1 What activities are you doing to reduce the incidence of defects (defects in the process) 39
2 What are the procedures for handling customer complaints and taking countermeasures 40
3 What kind of troubles (in-process defects, customer defects) do you have a system to 41
prevent recurrence
Nonconforming
Product 5 Is there a procedure for customer complain, internal problem 43
Supplier
Management 2 ls the quality of the external operations and services monitored ? 50
Kebijakan 5R/5S Kondisi Lay out process & equipment, Clean work area (process), Check
Environment 2 sheet & implementation 5R
53
1 Is there a Shipping / delivery procedure including safety for operators and fleets? 55
Delivery Storage
Production Control 3 Confirm inventory control status for F/G and WIP 57
4 Confirm child parts and F/G actual quantities does meet standard quantities 58
GRADE : GRADE :
AUDITEE TEAM ACKNOWLEDGED AUDITOR TEAM
Range
Point Item Point Grade Judge.
Point
SUPPLIER NAME : PT. FUKUYAMA INDONESIA 0 Standard or procedure not Available A 97% - 100% Sangat Memadai
------------------------------------- (Standar atau prosedur tidak tersedia) B 86% - 96% Memadai
Memadai Dengan
1 Standard or procedure it's available but not clearness of control item and control point C 80% - 85%
KIND OF INDUSTRY :METAL STAMPING PARTS Catatan
------------------------------------- (Standar atau prosedur tersedia tetapi kontrol item dan kontrol poin tidak jelas) D < 79% Tidak Memadai
2 Standard or procedure it's available, clearness of control item and control point but not smoothly implemented RESULT / COMENT :
ADDRESS :KAWASAN SURYACIPTA
------------------------------------- (Standar atau prosedur tersedia, kontrol item dan kontrol poin jelas tetapi implementasi tidak berjalan lancar)
3 Standard or procedure it's available, clearness of control item and control point and smhootly implementaed
AUDITEE DATE :18-------------------------------------
JAN 2022 (Standar atau prosedur tersedia, kontrol item dan kontrol poin jelas serta implementasi berjalan lancar)
1 Apakah perusahaan memiliki Sistem Manajemen Mutu & Lingkungan (Sertifikat ISO) Ricky Sertifikat ISO 9001:2015 1
Management Apakah ada Visi yang jelas yang ditetapkan oleh manajemen untuk mendukung Kebijakan FKY(MGT)-S003 Filosofi & Misi Perusahaan PT. Fukuyama Indonesia, FKY(MGT)-S002 Kebijakan
System 2 Mutu & lingkungan dan diterjemahkan ke seluruh organisasi. Ricky Mutu PT. Fukuyama Indonesia 2
3 Apakah pemasok telah mengembangkan rencana kontinjensi Ricky FKY(MGT)-F026 Contigency Plan 3
1 Drawing, PIS, QCPC, Inspection Report Bagas Sampling Doc. Part No. 5311D315 4
Quality Control
2 Pemeriksaan kualitas harian & bulanan dilakukan berdasarkan standar Agung FKY(PRD)-F001 Production Checksheet, IR Part No. 5311D315 5
1 Apakah terdapat rencana pelatihan untuk karyawan baru, refresh, dan skill up Reny IK(PGA)-IK002 Recriutment Karyawan, FKY(PGA)-F008 Program Training Schedule 6
Operator 2 Apakah terdapat evaluasi kemampuan pekerja & skill matriks Reny FKY(PGA)-F036 Skill Matrik (Sampling : Skill Matrix QC) 7
Evaluation
3 Apakah ada standar untuk sistem tindak lanjut ketika pekerja tidak terampil bekerja Reny FKY(PGA)-P002 _Prosedur Pelatihan dan Pendidikan 8
1 Apakah instruksi penerimaan inspeksi yang sesuai ditetapkan dan diterapkan Bagas FKY(QA)P.001 Prosedure Inspeksi , FKY (QA)-F001 QCPC 5311D315 9
Acceptance
inspection
2 Apakah penyimpanan bahan penerima diatur dan dikelola dengan benar termasuk Bagas FKY(PCM)-P.001 Penerimaan dan Penyimpanan Material, FKY(PCM)-P.002 Prosedure FIFO 10
first-in, first-out
Machine Control 2 Apakah orang yang bertanggung jawab atas pengaturan (set up / dandori) Agung Production Planing 12
mengkonfirmasi konsistensi antara checksheet produksi dengan operation monitor ?
3 Apakah Anda melakukan dan mencatat inspeksi produk pertama ? Bagas FKY (QA)-F015 IPC 13
1 Apakah ada instruksi kerja untuk "One Cycle Finish" / aturan yang mencegah pekerja Agung OPL one cycle procees by Widi/Agung 14
meletakkan part dan alat di tempat yang tidak tepat bahkan sementara ?
Operation Standard
2 Apakah status part yang belum selesai diidentifikasi saat operator meninggalkan area
kerja termasuk mengidentifikasi part setengah proses dan produk jadi (Finish Good) Agung Based on FKY(PPC)-I001_Production Tag 15
1 Apakah perusahaan memiliki standar kategori loss time (problem mesin, delay supply Ilham FKY(MTN)-F001_Historical Problem & Maintenance, 16
Breakdown time material, problem MP, dsb.) FKY(PCM)-P.004 Pemilihan dan Evaluasi Supplier (regarding material delay)
machine
2 Apakah terdapat check sheet untuk mencatat line stop karena problem mesin Ilham Data break down machine, FKY(MTN)-F007_Schedule Preventive Maintenance 17
Apakah terdapat aktivitas kaizen untuk mencegah berulangnya kerusakan mesin ?
1 Apakah organisasi memelihara fasilitasnya dalam keadaan teratur, bersih, dan diperbaiki Ilham FKY(MTN)-P001_Prosedur Perawatan dan Perbaikan Mesin, 18
sesuai dengan kebutuhan produk dan proses manufaktur FKY(PGA)-P008_Prosedur Pengendalian Infrastruktur
Facility Control & 2 Pemeriksaan dan pencatatan berkala Preventive Maintenance (PM) Ilham FKY(MTN)-F007_Schedule Preventive Maintenance 19
Preventive
Maintenance
3 Capacity Loading Machine & Man Power Arti Data loading capacity ASKA & kalkulasi MP by Arti 20
4 List Suku Cadang Ilham List spare part Maintenance & Machining by Ilham 21
1 Apakah terdapat aturan untuk traceability / trace back Ricky Based on FKY(PPC)-I001_Production Tag regarding Lot no. 22
Traceability
2 Catatan untuk proses traceability / trace back Ricky FKY(PPC)-S.002 - Aturan No. Lot 23
1 Bagaimana penanganan produk tidak sesuai jika ditemukan di proses termasuk Bagas FKY (QA)-P004 Prosedur Pengendalian Produk Tidak Sesuai, 24
Penempatan defect part OPL box kuning & merah, Hold area
Nonconforming
Product (Internal / 2 Bagaimana prosedur penanganan keluhan pelanggan dan tindakan penanggulangannya Bagas FKY (QA)-P002 Prosedur Penanganan Keluhan Pelanggan 25
Customer)
3 Apakah biaya ketidaksesuaian dihitung Bagas NG budget & Rework cost by Ricky 26
1 Apakah ada aturan untuk perbaikan / pengerjaan ulang (Repair / Rework) Agung FKY (QA)-F013 Form Hold 27
Repair / Rework 2 Terdapat WI / standar untuk masing-masing perbaikan dan record part repair / rework Agung IK Repair by Widi 28
3 Operator repair / rework part (Skill repair/rework) Agung Skil matrix repair by Widi 29
1 Apakah terdapat perawatan pada sample master Bagas IK/OPL Master Sample by Ricky 30
Sample Product
2 Sample master di identifikasi (tanggal berlaku dan tanggal akhir) Bagas Identifikasi pada sampel master (foto) 31
1 Apakah inspeksi dan kalibrasi alat pengukur dan alat ukur didasarkan pada rencana Bagas FKY (QA)-F007 Daftar dan Jadwal Klaibrasi/Verifikasi alat ukur 32
2 Apakah ada orang yang memenuhi syarat untuk inspeksi dan kalibrasi internal? Bagas Di internal hanya verifikasi alat ukur saja. 33
Tools &
Measurement Apakah ada catatan pemeriksaan/kalibrasi dan apakah ada dokumen catatan untuk
3 mengkonfirmasi hasil kalibrasi ke standar nasional Bagas Sertifikasi Kalibrasi alat ukur 34
4 Apakah ada proses untuk memastikan MSA dilakukan untuk semua peralatan pengukuran Bagas Based on sertifikat alat ukur dari supplier/data verifikasi CF dari Customer 35
dan pengujian sebelum dirilis untuk produksi
Supplier Evaluation Point
(Self Assessment) AAI Evaluation Point
Item Control Item Check PIC Weakness Point
0 1 2 3 0 1 2 3
Apakah memiliki sistem manajemen 4M change change (perubahan desain & perubahan
1 Proses) Bagas FKY (QA)-P005 Prosedur Perubahan Proses dan Produk 36
Process Change 2 Konfirmasi inspeksi pemasok dan catatan produk awal terkait dengan perubahan 4M Bagas FKY (QA)-F015 IPC 37
Control (4M Control
perubahan / Follow up perkembangan dari 4M (Log Book atau Visualisasi board (PIS,QCPC,WI,SDS,and
Henkaten) 3 Bagas FKY(QA)-F024 History 4M by Ricky 38
etc))
1 Apakah ada organisasi proyek (manajemen proyek) yang didirikan dan apakah tugas & Ricky FKY (QA)-P006 Prosedur Project Baru, FKY(MGT)-F033 Struktur Organisasi (New Project) 40
wewenang ditentukan untuk pemimpin tim dan anggota tim
Project
Management 2 Apakah setiap tahap memiliki ulasan Ricky FKY(MGT)-F036 Matrik New Project 41
1 Apakah ada prosedur untuk pemilihan pemasok Ike FKY(PCM)-P.004 Pemilihan dan Evaluasi Supplier 43
Supplier
Management 2 Apakah kualitas operasi dan layanan eksternal dipantau Ike FKY(PCM)-F.015 - Penilaian Supplier 44
3 Apakah ada proses untuk mengevaluasi kinerja pemasok Ike FKY(PCM)-F.015 - Penilaian Supplier 45
1 MSDS (Material Safety Data Sheet) Ike Sampling MSDS dari Supplier material 46
3 Apakah ada standar dan kepatuhan terhadap keselamatan lingkungan kerja Agung FKY(MGT)-F017 Check sheet kepatuhan Operator by Widi/Agung 48
1 Apakah ada prosedur pengiriman, termasuk keselamatan bagi operator dan armada Arti FKY(DEL)-P.001 Pengiriman, FKY(DEL)-IK002_Instruksi Kerja Persiapan Pengiriman 49
Delivery Storage
Production Control
2 Apakah area pengiriman dan pengecekan sebelum pengiriman sesuai dengan spesifikasi Arti Layout PT. Fukuyama Indonesia + Gemba (File Layout minta di Ricky) 50