4 Cross cut & Tepar Cut Free from Cross cut & Tepar Cut Visual
OP 10 Blanking
1 Thickness 1.20 ± 0.10mm Vernier Caliper
2 Radius R 25 RG
3 Radius R 30 Visual
2 Radius R 20 RG
3 Radius R 25 RG
OP 30 Pre Forming - 1
1 Part Profile As per master sample Visual
OP 40 Forming 2
Free fromTool
3 Appearance Mark ,burr,dent,damage& Scoring Visual
Mark
4 Press Tonnage 160 T Visual
Inspection Results :-
Accepted
Rejected
Con. Accepted Inspected By Approved By
Comments if any:-
NIRMITI PRECISION PVT. LTD. IN-PROCESS INSPECTION
(PLANT 4) REPORT
FRM/QAD/02, REV.01
Part Name RET & SEAL
Part No. 173415234 R
RM Ref.No(Heat no.) IMAGE
Inspector Name & Date of Insp./Shift
Sample Size Vs. Lot Size
Incoming / Blanking
Observations
Sr. SC / First Piece - Set Up
Parameter Specification IMTE Used In-Process inspection Last Piec
No. CC Approval Remarks
1 2 3 4 5 6 7
OP 10 Blanking
Compound
1 Diameter 98.00 ± 0.10 mm DVC
Inspection Results :-
Accepted
Rejected
Con. Accepted Inspected By Approved By
Comments if any:-
NIRMITI PRECISION PVT. LTD. (PLANT IN-PROCESS INSPECTION REPORT
4) FRM/QAD/02, REV.01
OP 10 Progressive
1 Slot Dimnesion 18.20 (+0.30 /-0.00 ) Vernier Caliper
Inspection Results :-
Accepted
Rejected
Con. Accepted Inspected By Approved By
Comments if any:-
IN-PROCESS INSPECTION REPORT
NIRMITI PRECISION PVT. LTD. (PLANT 4) FRM/QAD/02, REV.01
OP 10 Progressive
1 Slot Dimnesion 18.20 (+0.40 /-0.00 ) Vernier Caliper
Inspection Results :-
Accepted
Rejected
Con. Accepted Inspected By Approved By
Comments if any:-
NIRMITI PRECISION PVT. LTD. IN-PROCESS INSPECTION REPORT
FRM/QAD/02, REV.01
(PLANT 4)
Inspection Results :-
Accepted
Rejected
Con. Accepted Inspected By Approved By
Comments if any:-
NIRMITI PRECISION PVT. LTD. IN-PROCESS INSPECTION REPORT
FRM/QAD/02, REV.01
(PLANT 4)
Free from
1 Appearance Dent,Damage,Crack,Scoring & Visual
Part Profile to be ok etc…
Inspection Results :-
Accepted
Rejected
Con. Accepted Inspected By Approved By
Comments if any:-