Professional Documents
Culture Documents
, Padi, Chennai
1
COMPANY PROFILE
An Overview Lucas TVS was established in 1962 as a Joint Venture between Lucas Plc.
UK and TVS Group, India. Five decades of leadership on Indian Auto
Electrical Market. 7 plants in India, main plant in Chennai. Product
development capability - 75% of revenue from In-house developed products
Alternator, Starters, Wiper Motor, Two Wheeler Starter Motors, Wiping System, Compressor Motor, Stick coil
Our Customers
MAJOR PROCESSES
Reduction
in Energy
by 10%
GHG
Reduction
by 5%
APPROACH ON ENERGY CONSERVATION
1
Distribution loss
Technology / Engineering Improvements
Right sizing of Motors
LED Lighting
Air leak audit &
IE3 Motors
Waste Elimination
correction
2
Renewable Energy
Thyristor Controls Solar
BLDC Fans Wind
Conversion
VF Drive
Sleep Timers 3
Bio-Gas
Harmonic Filters Lux Level Optimiz. Bio-Mass
Heat Pumps
Natural Lighting
Demand Control /
Lean Electricals Load Sharing
Air Managers
Insulation improv.
ENCON PROCESS
Significant Energy
consuming Equipments Obsolete Model
& Replacements
Waste Identification
Continuous Monitoring Energy
& Control Audits
System Adherence Technology Upgradation
& Deviations
Need for Training & Awareness System
Statutory Compliances
Evaluation &
Improvements
Work Efficiency improvement
Internal Audit (Yearly) External Audit (Once in 2 years)
7
Specific Energy Consumption Trend
Year wise Energy Consumption Production Volume Better
Better
29
295 30 28
300 266 267 266 275 278 277 25 26 25 25
240 248 25 24
250 220 230 21
193 203 204
20
Nos. in Lacs
Units in Lacs
0 0
98-99 99-00 00-01 02-03 03-04 04-05 05-06 06-07 07-08 08-09 09-10 10-11 11-12 12-13 13-14 14-15 15-16 16-17 17-18 98-99 99-00 00-01 02-03 03-04 04-05 05-06 06-07 07-08 08-09 09-10 10-11 11-12 12-13 13-14 14-15 15-16 16-17 17-18
25.00
Energy Units Per Product Total Power Cost
21.00 Better Better
20.00 19.00
18.00 2500 2317
16.00 16.50 2157 2150
Units in kWh
Rs.in Lacs
10.56 10.35 10.31 9.90 9.95 9.89
9.73
1500
10.00 8.42 983 1011
1000
5.00 500
0
0.00 07-08 08-09 09-10 10-11 11-12 12-13 13-14 14-15 15-16 16-17 17-18
98-99 99-00 00-01 02-03 03-04 04-05 05-06 06-07 07-08 08-09 09-10 10-11 11-12 12-13 13-14 14-15 15-16 16-17 17-18
Specific Energy Consumption Trend 2017-18
12.00
Better
11.00
10.60
10.31
10.00 10.00 9.90 9.89
10.00 9.90 9.73 9.50 9.30 9.20
8.97 9.00 8.90 8.80
8.91 8.90 8.76 8.70 8.60 8.50 8.30
8.42 9.46 9.41 8.20 8.10
8.83 8.76
8.00 8.56
8.33 8.25 8.17
7.99 7.82
7.78
Units Per ESU
7.73
4.00
2.00
0.00
11-12 12-13 13-14 14-15 15-16 16-17 17-18 Apr-17 May-17 Jun-17 Jul-17 Aug-17 Sep-17 Oct-17 Nov-17 Dec-17 Jan-18 Feb-18 Mar-18
12.00
11.00
10.60 Better
10.31
10.00 10.00 9.90 9.89
10.00 9.90 9.73
8.97 8.90 8.75 8.94
8.91 8.76 8.41
8.42
8.00
8.00
8.30 8.30 8.15 8.10 8.05 8.05 8.00 8.00 7.90 7.90 7.80 7.80
Units Per ESU
6.00
Target – 8.00 Units / ESU (Avg.)
4.00
2.00
0.00
11-12 12-13 13-14 14-15 15-16 16-17 17-18 18-19 Apr-18 May-18 Jun-18 Jul-18 Aug-18 Sep-18 Oct-18 Nov-18 Dec-18 Jan-19 Feb-19 Mar-19
Units in Lacs
6.50
6.03 8.00
6.00 8
5.00 5.20
6.00
6
4.00
4.00
3.00 4
2.50
2.00 2.00
1.25 1.50
1.00 2
0.50 0.75
1.10
0.56 0.89
0.00 0.20 0
14-15 15-16 16-17 17-18 18-19 Apr-18 May-18 Jun-18 Jul-18 Aug-18 Sep-18 Oct-18 Nov-18 Dec-18 Jan-19 Feb-19 Mar-19
1 1 2.0
Thyristor for Induction Hardening Machine 1 0.05 0.4
Replacement of conventional Ceiling Fan with BLDC ceiling fan 2 0.18 2 1.3 2 4.2
Investment
Day light optimization by introducing Sola Tube in Warehouse 3 0.24 3 1.7 3 10.0 in Lacs
Introduction of IE3 Motor for Compressor by replacing IE1 motor 4 1.8 4 10.0
4 0.25
Expected
Elimination of Transformer No load loss 0.4 kWh Savings of
by replacing with dry type
Around
9.0 Lac
Introduction of BLDC HVLS fans 3.36 kWh Units in
2018-19
Day light optimization by introducing Sola 0.24 kWh
Tube in Claw and EOU Ware House Investment
on Energy
Power Quality improvement by installing 2.1 kWh conserving
passive Harmonic Filters
Projects
1.97 Crores
Downsizing of Motors in Manufacturing 1.50 kWh
machineries in shop floor
Energy Conservation Projects
Before After
Solar panel cleaning is carried out every month. High pressure nozzle was introduced to the hose & water
Avg. water consump. to clean 3820 panels is 37000 litres/month. pressure was improved and 20200 litres to clean 3820
Low pressure water hose was used to clean solar panel solar panels.
Financials ( in Lakhs )
0.3
200 TCO2e
₹0.010 ₹0.24
kL
Energy Conservation Projects
Before After
Almonard fans
ITA 0004, Thread rolling Machine in Manufacturing line This motor was replaced with higher efficiency IE3 motor
had IE1 motor of 30HP capacity resulting in 5% reduction of energy consumption.
Financials ( in Lakhs )
94
1.80 TCO2e
₹6.0 ₹12.6
kWh
Energy Conservation Projects
Before After
Window type ACs were replaced with VRF type ACs in Engg
Previously, Window type ACs were installed in offices,
centre & Advanced Engg., HR dept & Quality office
standards room & labs consuming high energy.
resulting in a reduction of energy consumption by 32%.
Financials ( in Lakhs )
41
0.78 TCO2e
₹11.3 ₹ 5.44
kWh
Energy Conservation Projects
Before After
SS 10HP
SS
Cooling Cooling 10HP
tower 10HP
tower GRS M/C's
GRS M/C's
26
HEAT PUMP
27
INNOVATIVE PROJECT - HEAT PUMP SYSTEM
Air Vent
Expansion
Tank
Input temperature
Output Temperature
Heat pump input
29
RENEWABLE ENERGY SOURCES
Green
power
60%
Purchase quantum : 1.80 MW (Wind Power) Windmill Capacity : 1 MW (4 nos. x 250 KW)
Energy Unit Generation : 13,00,000 Units per Month Energy Unit Generation : 15 Lacs Units / Annum
5000
4000
Demand in KVA
3000 10.50AM - 4755 KVA 6.20 PM - 5223 KVA
2.00 PM - 5134 KVA 6.50 PM - 5408 KVA
2000
06:…
08:…
09:…
10:…
10:…
11:…
12:…
12:…
13:…
14:…
14:…
15:…
16:…
16:…
17:…
18:…
18:…
19:…
20:…
20:…
21:…
22:…
22:…
23:…
00:…
00:…
01:…
02:…
02:…
03:…
04:…
04:…
05:…
06:…
07:…
08:…
Ref. data : 31.05.2016 (Total consumption-96,786) • Reduce Peak demand with help of solar power
• Cost saving of Rs.0.98 Lacs per month for Demand charges
Project : Installation of Roof Top Solar Power Plant
Plant Capacity : 1.22 MWp
Satellite of
Project Cost : Zero investment – BOOT concept L-TVS Padi
Power generation : 5000 Units / day (Avg.) Roof top.
Benefit : Cost Saving @ 1.72 Lakhs / Month
: 100% Compliance with TNREC regulation (RPO)
Renewable Power Utilization Trend – 9 years
100% 1 0 0
0 4
0 10 8
12
0
90% 18
0 22
6 29
6
0
31 Plan to enhance
80%
0 renewable power
42
70% 25
purchase from 55%
0 6
22
71 to 84%
31
60% 77
Percentage %
1 62
50% 84
47
29
40%
55
28
30% 60 2
52 Fossil Fuel
20% Solar Power
8 2
28 16 Green power
27
10% 19 20 2 DG
14 2
9 EB
6 6
0%
2009-10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19
32
Utilization of Waste Material as Fuel
Generation of 8 – 10
kg of Methane gas per
day of LP for every 50
kg of food waste
Canteen Area
Pre-Digester
Financials ( in Lakhs )
9.68
₹5.0 1825 kg ₹0.91 TCO2e
33
GHG Inventorisation
Scope 1 emissions 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18
LPG consumption MT 189645 168249 171052 163837 165963 179295
Emissions from LPG consumption t CO2 565142 501382 509735 488234 494569 534299
HSD & SKO consumption KL 1859 1097 747 748 832 725
Emissions from HSD & SKO consumption t CO2 4862934 2853329 1916618 1915326 2130545 1856544
Scope 2 emissions
Purchased electricity MWh 10529 3745 7299 15249 8427 10548
Emissions from purchased electricity t CO2 8634 3071 5985 12504 6910 8649
Specific intensity (tonne of CO2/ESU) 2.17 1.32 0.96 0.95 0.94 0.82
34
GHG Inventorisation
Scope – 1 Emission Scope – 1 Consumption
6000000
195000
5000000 4862934 Avg-18.5 Million 190000
189645
LPG-175 Ton
185000
4000000 Ton Avg.
180000
175000 179295
t CO2e
3000000 2853329
170000
2000000 2130545 165000 171052
1916618 1915326 1856544 168249
160000 165963
1000000 163837
155000
0 150000
2012-13 2013-14 2014-15 2015-16 2016-17 2017-18
2012-13 2013-14 2014-15 2015-16 2016-17 2017-18
Emissions from HSD & SKO consumption t CO2 HSD & SKO consumption LPG consumption
Emissions from LPG consumption t CO2
8000 10000
8634 8649 10529 10548
6000 6910 8000
5985 8427
4000 6000 7299
4000
2000 3071 2000 3745
0 0
2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18
6000000 5428077
Total emissions (tCo2e) % Reduction in CO2
5000000 emission over last 4
4000000 3354711 years – 38%
3000000 2426353
2403561
2625114
2390843
2000000
1000000
0
2012-13 2013-14 2014-15 2015-16 2016-17 2017-18
Total emissions
0.02
0.00
2012-13 2013-14 2014-15 2015-16 2016-17 2017-18
0
2009-10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19
-6876460.105 -6059601.278
-10000000 -7344680 -8790673.843
-9808145.322 -9869935.747
-15000000 -14549828
-20000000
37
GREEN SUPPLY CHAIN – Vehicle Route Optimization
Routes optimized while vehicle allotment for reducing lead time, reduce cost of logistics
and improve fuel efficiency. CO2 Emission
reduced by 60 %
Route 1 – Ambattur Zone – 5 Vehicles – 20 Suppliers Covered - 107 T CO2 e
39
Total Employee Involvement
SGA
Voluntary
Work Suggestions
Teams
Training &
Awareness
Audit at Program for
Vendor Employee
plants Families
40
Total Employee Involvement
Campaign & CompetitionsCampaign & Competitio
National Energy Management Award 2017 - CII
Training Programme for Training
Training Programme forProgramme for Programme
Training TrainingforProgramme for Programme
Training Training
forProgra
Contractor Trainee Contractor Vendor Trainee Family Vendo