Professional Documents
Culture Documents
SINGAPORE
INCIDENT REPORT
Date of Preliminary report: 04 DEC.2019
Date of Intermediate report: 06 DEC.2019
Date of Final report: 10 Dec.2019
WEATHER CONDITION:CLOUDY
OUTLINE OF INCIDENT:C
03 Dec.2019 - at around 2015LT while the vessel is discharging cargo at Kandla,India, Deck Crane no.1
luffing will operate only when booming down, but when booming up the brake will not release thus
make the luffing inoperable during boom up.
1
MC SHIPPING LTD. SINGAPORE
COUNTER MEASURES:
Removed vane pump of Deck crane no.2 and transferred to Deck crane no.1 .
SHIP’S PROFILE:
Maker recommended to transfer vane pump from no.2 or no.3 Deck crane and install in no.1 Deck
crane to determine if the vane pump is defective.
2
MC SHIPPING LTD. SINGAPORE
Enclosures:
1. Relevant photographs: included
2. SOF : included
3. Other documents as required: Spare part delivery receipt