Objectives
 Upon completion of this course, you will be able to:
 Install MA5800 cabinet, frame and board properly

 Perform MA5800 cable routing and termination properly

 Identify the cautions and facts which may affect MA5800


system running due to improperly installation

Copyright © Huawei Technologies Co., Ltd. All rights reserved. Page2


Contents
1. Safety Information

2. Installation Information

3. Checking the Installation Entry

4. Installing the MA5800 and Cable Routing

5. Post-Installation Check

6. Specifications of the Cables

Copyright © Huawei Technologies Co., Ltd. All rights reserved. Page3


Safety Information
 Following All Safety Precautions  Qualified Personnel Only

 Complying with the Local Safety  Symbols


Regulations

Symbol Description

Indicates an imminently hazardous situation which, if not avoided, will


result in death or serious injury.
Indicates a potentially hazardous situation which, if not avoided, could
result in death or serious injury.

Indicates a potentially hazardous situation which, if not avoided, may


result in minor or moderate injury.
Indicates a potentially hazardous situation which, if not avoided, could
result in equipment damage, data loss, performance deterioration, or
unanticipated results.
NOTICE is used to address practices not related to personal injury.
Calls attention to important information, best practices and tips.
NOTE is used to address information not related to personal injury,
equipment damage, and environment deterioration.

Copyright © Huawei Technologies Co., Ltd. All rights reserved. Page4


Installation Precautions
Electrostatic Discharge
Before touching the device, or holding the boards and IC chips, wear
the ESD gloves or the ESD wrist strap to prevent the electrostatic
discharge of the human body from damaging the sensitive components.
Ensure that the other end of the ESD wrist strap is properly grounded.

ESD ESD wrist strap


gloves

Copyright © Huawei Technologies Co., Ltd. All rights reserved. Page5


Installation Precautions
Bundling cables
• The distance between cable ties or binding straps inside the cabinet must be
within 250 mm. (For user cable, the distance must be within 200 mm.)

• Use diagonal pliers to cut off the extra part of the cable tie to the end, and ensure
that the cable tie is neat without sharp edges to prevent hand injury.

Affixing labels / tags


• After routing the cable, attach the label or fasten the tag to the cable 20 mm away
from the connector.

• After the label for the signal cable is attached to the signal cable, the rectangular
text area of the label must face rightwards or downwards.

• After the identification plate for the power cable is attached to the power cable,
the text area of the plate must face rightwards or upwards. Ensure that the side
attached with the label faces outwards.

Copyright © Huawei Technologies Co., Ltd. All rights reserved. Page6


Contents
1. Safety Information

2. Installation Information

3. Checking the Installation Entry

4. Installing the MA5800 and Cable Routing

5. Post-Installation Check

6. Specifications of the Cables

Copyright © Huawei Technologies Co., Ltd. All rights reserved. Page7


Appearance and Structure
Top of the cabinet (top view)

ESD jack

Front door side


Binding strap
Cable aperture

Cable Manager

Copyright © Huawei Technologies Co., Ltd. All rights reserved. Page8


Space Requirements on Third-Party Cabinets

 Ensure that the cabinet has an air inlet and


the hole density of the cabinet door is 60%
or higher.

 Reserve at least 2 U space for air flow-in

Passive device
when you route fibers or install other passive

>3U
devices. You are advised to reserve more
than 4 U space to facilitate subsequent air
FAN
STATUS

inlet or dust filter cleaning.


PRTE GPBD GPBD GPBD GPBD GPBD GPBD GPBD GPBD GPBD GPBD GPBD GPBD GPBD GPBD GPBD GPBD X2CS
SCUN SCUN
RUN ALM
ALARM RUN RUN RUN RUN RUN RUN RUN RUN RUN RUN RUN RUN RUN RUN RUN RUN RUN RUN LINK ACT
ALM ALM ALM ALM ALM ALM ALM ALM ALM ALM ALM ALM ALM ALM ALM ALM ALM ALM
BSY 0
BSY BSY BSY BSY BSY BSY BSY BSY BSY BSY BSY BSY BSY BSY BSY
ACT ACT 1
NEG(-)
PON PON PON PON PON PON PON PON RESET RESET PON PON PON PON PON PON PON PON
0 1 0 1 0 1 0 1 0 1 0 1 0 1 0 1 0 1 0 1 0 1 0 1 0 1 0 1 0 1 0 1
RTN(+) 2 3 2 3 2 3 2 3 2 3 2 3 2 3 2 3 2 3 2 3 2 3 2 3 2 3 2 3 2 3 2 3
CON

CON

4 5 4 5 4 5 4 5 4 5 4 5 4 5 4 5 4 5 4 5 4 5 4 5 4 5 4 5 4 5 4 5
6 7 6 7 6 7 6 7 6 7 6 7 6 7 6 7 6 7 6 7 6 7 6 7 6 7 6 7 6 7 6 7
TX0
RX0
ETH

ETH

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
ESC

ESC

PRTE

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
ALARM
TX1
RX1
LINK ACT LINK ACT
0 0

NEG(-) 2 2 2 2 2 2 2 2 1 1 2 2 2 2 2 2 2 2
2 2

The reserved space can no longer be


3 3
RTN(+)


3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3

TX0 TX0
RX0 RX0
X2CS
RUN ALM
CITD
TX1 TX1 LINK ACT
RX1 RX1
0
RUN
M IN
M AJ

1
4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
IN0

TX2 TX2
RX2 RX2
IN1

5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5
BITS/TOD

TX0
OUT

RX0
TX3 TX3

installed with other equipment, to ensure that


RX3 RX3
6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
ET H COM

7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7

TX1
ALM

RX1

the main equipment is cooling properly.


>4U

Front view Side view

Copyright © Huawei Technologies Co., Ltd. All rights reserved. Page9


Space Requirements on Third-Party Cabinets
Without an air deflector With an air deflector
Passive device Passive device

>3 U

Air deflector (3 U)
>2U
>10
U

>4U >4U

Front view Side view Front view Side view

Copyright © Huawei Technologies Co., Ltd. All rights reserved. Page10


Contents
1. Safety Information

2. Installation Information

3. Checking the Installation Entry

4. Installing the MA5800 and Cable Routing

5. Post-Installation Check

6. Specifications of the Cables

Copyright © Huawei Technologies Co., Ltd. All rights reserved. Page11


Tools and Meters
 Before begin the installation, get the following tools and
meters ready.

Marker Flat-head screwdriver Phillips screwdriver Diagonal pliers

Adjustable wrench Socket wrench Measuring tape Claw hammer

Copyright © Huawei Technologies Co., Ltd. All rights reserved. Page12


Checking Tools and Meters(2/2)

Hammer drill Bit Hydraulic crimper Cable cutter

Network cable Network cable tester Multimeter Optical power meter


crimping tool

Optical fiber Optical fiber


ESD gloves ESD wrist strap
microscope cleaner

Copyright © Huawei Technologies Co., Ltd. All rights reserved. Page13


Checking the Construction
Environment
 The table shows

No. Item No. Item


Temperature
1 Civil engineering 6
regulation
Dust-proof
2 Site selection 7
measures
Lightning proof
3 Air conditioner 8
measures
Weight bearing Transportation
4 9
capacity passage
Moisture-proof
5 10 Fire protection
measures

Copyright © Huawei Technologies Co., Ltd. All rights reserved. Page14


Unpacking and Accepting Products
 Checking Before Unpacking

 Unpacking the Wooden Case

 Unpacking the Carton

 service subrack Inspection

 Board Inspection

 Accepting the Products

Copyright © Huawei Technologies Co., Ltd. All rights reserved. Page15


Contents
1. Safety Information

2. Installation Information

3. Checking the Installation Entry

4. Installing the MA5800 and Cable Routing

5. Post-Installation Check

6. Specifications of the Cables

Copyright © Huawei Technologies Co., Ltd. All rights reserved. Page16


Installing the MA5800 in the Rack(1/2)

• Locate the installation positions of the cable troughs and service


subrack on the mounting bars, and install floating nuts at these
positions.
• Use 8 M6 x 12 panel screws to secure the upper and lower cable
troughs on the mounting bars.

Upper cable manager

Lower cable manager

Copyright © Huawei Technologies Co., Ltd. All rights reserved. Page17


Installing the MA5800 in the Rack(2/2)
 Smoothly slide in the service subrack along the upper cable trough into the cabinet until the
mounting ears of the service subrack contact the mounting bars, and use 10 M6 x 12 panel screws
to secure the service subrack on the mounting bars.

Service subrack

Copyright © Huawei Technologies Co., Ltd. All rights reserved. Page18


Cable Routing-Cabinet with Routed
Cables
Cabinet configured with
16-port GPON boards Cabinet configured with 48-port P2P boards

Copyright © Huawei Technologies Co., Ltd. All rights reserved. Page19


Routing the External Power Cables and PGND
Cable (1/2)To office power supply

Top of the cabinet (top view)


Lead the power cables into the cabinet

Cable aperture

Copyright © Huawei Technologies Co., Ltd. All rights reserved.


Routing the External Power Cables
and PGND Cable (2/2)
PGND cable To office ground bar
Front door side
Phillips screwdriver

Power cables (with cord


end terminals)

NEG RTN NEG


(Blue) (Black) (Blue)

PGND cable (with OT


terminals)

Copyright © Huawei Technologies Co., Ltd. All rights reserved. Page21


Routing Clock Cables
To the external clock device
Top of the cabinet (top view)

Front door side


Cable aperture

BITS IN0 to clock source


BITS IN1 to clock source
BITS OUT to lower level
clock

Copyright © Huawei Technologies Co., Ltd. All rights reserved.


Routing Network Cables
TO the maintenance terminal or transmission unit

Top of the cabinet (top view)

Front door side


Cable aperture

Network cable

Copyright © Huawei Technologies Co., Ltd. All rights reserved. Page23


Routing Optical Fibers (Upstream)
To ODF To ODF Top of the cabinet (top view)
Corrugated pipe

Fiber
(LC)

Front door side


Cable aperture (for service)

Fiber (LC)

≤ 42±1 mm

Copyright © Huawei Technologies Co., Ltd. All rights reserved.


Routing Optical Fibers (GPON Board)
To ODF To ODF
Corrugated pipe
Fiber (SC)

≤ 57±1 mm

Fiber
(SC)

Binding
position 1
(ports 0-4)
Binding
position 2
(ports 0-9)
Fiber (SC)
Binding
position 3
(ports 0-15)

Copyright © Huawei Technologies Co., Ltd. All rights reserved. Page25


Routing Optical Fibers (P2P Board)
Pull fibers To ODF To ODF Top of the cabinet (top view)
upwards

Route fibers
downwards

Pull fibers Fiber


upwards (LC)

Binding
position 1
(ports 0-11)
To facilitate the
subsequent maintenance, Fiber
Binding bundle the newly routed
position 2 optical fiber with the (LC)
Connect
(ports 0-23) originally routed optical
fibers fiber firmly. Ensure that
the height of the bundled
Binding optical fibers is lower than
position 3 55 mm.
(ports 0-35)
Send fibers Binding
upwards position 4
(ports 0-47)

Copyright © Huawei Technologies Co., Ltd. All rights reserved. Page26


Routing Optical Fibers (P2P Board,
Detailed Procedure) (1/4)
 1. Arrange the optical fibers and use one number to
mark both ends of each optical fiber.
≤ 30±1 mm

 2. Cover each 48 optical fibers to be led into the


cabinet with a corrugated pipe of about 2 m long.
Open corrugated pipe(Outer diameter: 32 mm)

Copyright © Huawei Technologies Co., Ltd. All rights reserved. Page27


Routing Optical Fibers (P2P Board,
Detailed Procedure) (2/4)
 3. Lead the optical fibers of each board (a corrugated pipe) into the
cabinet according to the position requirements marked in the following
figure. When the cabinet is in full configuration, 8 corrugated pipes are led
in to the left of the cabinet and 9 corrugated pipes are led in to the right of
the cabinet.

Top of the cabinet (top view)


Slot ID Slot ID
1 1 12
2
3 13
1
4 14
5 15
16
6 17
7 18
8 19
Front door side

Copyright © Huawei Technologies Co., Ltd. All rights reserved. Page28


Routing Optical Fibers (P2P Board,
Detailed Procedure) (3/4)
0
 4. Connect the optical fibers to the board in the order of 0–47.

 5. Arrange the optical fibers following the sequence of "optical


fibers on the front panel", "optical fibers in the service shelf",
"optical fibers in the cabinet", and "optical fibers led out from 47

the corrugated pipes".

Copyright © Huawei Technologies Co., Ltd. All rights reserved. Page29


Routing Optical Fibers (P2P Board,
Detailed Procedure) (4/4)
 6. Cover the remaining length of the optical fibers with corrugated pipes.

 7. Repeat steps 3 – 6 to route the optical fibers of


the other boards from left to right.

 8.Route all the corrugated pipes on the cabling tray and


paste the same official label for each optical fiber on
both the ODF side and board side.
Copyright © Huawei Technologies Co., Ltd. All rights reserved. Page30
Contents
1. Safety Information

2. Installation Information

3. Checking the Installation Entry

4. Installing the MA5800 and Cable Routing

5. Post-Installation Check

6. Specifications of the Cables

Copyright © Huawei Technologies Co., Ltd. All rights reserved. Page31


Post-Installation Check
NO. Description Method
1 The cabinet must be placed according to the engineering design. Check the position.
2 The cabinet components must be installed correctly, without damaged or Observe
loosen parts. The screws must be secured correctly.

3 The vertical deviation of the cabinet must be smaller than 3 mm (you can Measure
use the plumb to measure the vertical deviation).

4 The cabinet rows near the main aisle must be aligned in a straight line, with Measure
the error less than 5 mm.

5 The surfaces of cabinets in a row must be in one plane, and the cabinets Observe
must be arranged closely and in order.

6 The cabinet door must be opened and closed smoothly. Observe


7 There should be no fingerprints, scratch marks or other stains on the Observe
cabinet.

8 All vacant slots in a service subrack are filled in with filler panels. Observe
9 The mouseproof board should be installed after routing cables and fixed Observe
with screws; Each mouseproof board should be banded with another one
with wire clip; The gap between the cable and the mouseproof should less
than 10 mm.

Copyright © Huawei Technologies Co., Ltd. All rights reserved. Page32


Post-Installation Check
NO. Description Method

10 Signal cables must be routed according to the engineering design. Observe

11 Signal should not be damaged or broken, and there should not be any joint on the Observe
cable.

12 The connectors of the signal cables must be neat and intact. The connectors must be Observe
connected correctly and firmly. The tips of the connectors must be connected securely.

13 Signal cables must be laid horizontally or vertically without crossing, and must be Observe
bundled moderately at the turning. (Crossing is allowed for cables within 1 m outside
the cabinet.)

14 Labels at both ends of the signal cables must be marked correctly, clearly and neatly. Observe

15 The optical fibers routed outside the cabinet must be protected in a corrugated pipe, Observe
and must be protected from being extruded by other cables and goods.

16 The optical fibers must be protected in a corrugated pipe when being routed into the Measure,
cabinet, and the corrugated pipe must be laid inside the cabinet. The length of the observe
corrugated pipe inside the cabinet must not exceed 10 cm, and the corrugated pipe
must be fastened and bundled reliably.

Copyright © Huawei Technologies Co., Ltd. All rights reserved. Page33


Post-Installation Check
NO. Description Method

17 Curvature radius of the optical fiber must be 20 times larger than the diameter of the optical Measure,
fiber. In general, the curvature radius of the optical fiber must be greater than or equal to 40 observe
mm. There should be no sharp components on the routing path of the optical fibers.
18 Place the optical fiber pairs in order and bind them carefully with optical binders. No sharp Observe
edge is allowed.
18 The routing of power cables and ground cables must comply with the engineering design. Observe
This helps maintenance and expansion.
19 The power cable and ground cable must adopt an entire segment of copper core. The cable Observe
should have no connection in the middle or scratch on the skin.

20 The power cables and ground cables must be connected correctly and reliably. Observe
21 The cross-sectional area of the power cable and ground cable must comply with the Observe
engineering design, meeting the requirements of running the equipment.

22 The power cables, ground cables, and signal cables must be routed separately. Observe

23 The power cables and ground cables must be routed horizontally and vertically without Observe
crossover. Proper margins must be reserved at the turning.
24 The identifiers on the power cable, ground cable, and power switch must be correct, legible, Observe
and neat.

Copyright © Huawei Technologies Co., Ltd. All rights reserved. Page34


Powering On the MA5800
Lift the transparent cover of the power distribution unit (PDU)
and turn on the SW1 circuit breakers in areas A and B.

Check the status of the lower service subrack and fan tray.

Green indicator: on for 1s off for 1s repeatedly

Turn on the SW2 circuit breakers in areas A and B of the PDB.

Check the status of the upper service subrack and fan tray.

Copyright © Huawei Technologies Co., Ltd.Green


All rights reserved.
indicator: Page35
on for 1s off for 1s repeatedly
Contents
1. Safety Information

2. Installation Information

3. Checking the Installation Entry

4. Installing the MA5800 and Cable Routing

5. Post-Installation Check

6. Specifications of the Cables

Copyright © Huawei Technologies Co., Ltd. All rights reserved. Page36


Specifications of the Trunk Cables
 Grounding the end of the cable with the DB44pin connector
is required, and grounding the other end of the cable is not
required.

Copyright © Huawei Technologies Co., Ltd. All rights reserved. Page37


Pin Assignment of the DB44pin
Connector
 Pin assignments of the E1/T1 port (DB44pin connector) on
the EDTB board
Pin Signal
1 GND cabler
2 GND cabler
14 TR1
15 TR0
16 RT7
30 TT0
31 RR7
44 GND cabler

Copyright © Huawei Technologies Co., Ltd. All rights reserved. Page38


Pin Assignment of the EXTERNAL
ALARMS Port
 Pin assignment of the EXTERNAL ALARMS port (RJ-45
connector) on the CITB board
 EXTERNAL ALARM IN port

 EXTERNAL ALARM IN/OUT port


Pin Signal Port Pin Signal Port
Alarm_0_i Alarm_0_i
1 1
n n
2 GND 2 GND
1 8 1 8
Alarm_1_i Alarm_1_i
3 3
n n
Alarm_2_i Alarm_2_i
4 4
n n
5 GND 5 GND
6 GND 6 GND
Alarm_3_i Alarm_3_i
7
Copyright 7
n© Huawei Technologies Co., Ltd. All rights reserved. n Page39
Pin Assignment of the BITS Port
 Pin assignment of the BITS port (RJ-45 connector) on the
CITB board.
Pin Signal Port
1 Alarm_0_in
2 GND
3 Alarm_1_in
4 Alarm_2_in
5 GND
6 GND 8 1
7 Alarm_3_in
8 GND

Copyright © Huawei Technologies Co., Ltd. All rights reserved. Page40


Pin Assignment of the CON Port
 Pin assignment of the CON port (DB-9 connector) on the
CITB board.

Pin Signal Port

2 TXD

3 RXD 5 4 3 2 1
5 GROUND

1、4、6 Internal connect 9 8 7 6

7、8 Internal connect

Copyright © Huawei Technologies Co., Ltd. All rights reserved. Page41


Summary
1. Safety Information

2. Installation Information

3. Checking the Installation Entry

4. Installing the MA5800 and Cable Routing

5. Post-Installation Check

6. Specifications of the Cables

Copyright © Huawei Technologies Co., Ltd. All rights reserved. Page42

You might also like