Hardware Installation
www.huawei.com
2. Installation Information
5. Post-Installation Check
Symbol Description
• Use diagonal pliers to cut off the extra part of the cable tie to the end, and ensure
that the cable tie is neat without sharp edges to prevent hand injury.
• After the label for the signal cable is attached to the signal cable, the rectangular
text area of the label must face rightwards or downwards.
• After the identification plate for the power cable is attached to the power cable,
the text area of the plate must face rightwards or upwards. Ensure that the side
attached with the label faces outwards.
2. Installation Information
5. Post-Installation Check
ESD jack
Cable Manager
Passive device
when you route fibers or install other passive
>3U
devices. You are advised to reserve more
than 4 U space to facilitate subsequent air
FAN
STATUS
CON
4 5 4 5 4 5 4 5 4 5 4 5 4 5 4 5 4 5 4 5 4 5 4 5 4 5 4 5 4 5 4 5
6 7 6 7 6 7 6 7 6 7 6 7 6 7 6 7 6 7 6 7 6 7 6 7 6 7 6 7 6 7 6 7
TX0
RX0
ETH
ETH
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
ESC
ESC
PRTE
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
ALARM
TX1
RX1
LINK ACT LINK ACT
0 0
NEG(-) 2 2 2 2 2 2 2 2 1 1 2 2 2 2 2 2 2 2
2 2
3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
TX0 TX0
RX0 RX0
X2CS
RUN ALM
CITD
TX1 TX1 LINK ACT
RX1 RX1
0
RUN
M IN
M AJ
1
4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
IN0
TX2 TX2
RX2 RX2
IN1
5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5
BITS/TOD
TX0
OUT
RX0
TX3 TX3
7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7
TX1
ALM
RX1
>3 U
Air deflector (3 U)
>2U
>10
U
>4U >4U
2. Installation Information
5. Post-Installation Check
Board Inspection
2. Installation Information
5. Post-Installation Check
Service subrack
Cable aperture
Network cable
Fiber
(LC)
Fiber (LC)
≤ 42±1 mm
≤ 57±1 mm
Fiber
(SC)
Binding
position 1
(ports 0-4)
Binding
position 2
(ports 0-9)
Fiber (SC)
Binding
position 3
(ports 0-15)
Route fibers
downwards
Binding
position 1
(ports 0-11)
To facilitate the
subsequent maintenance, Fiber
Binding bundle the newly routed
position 2 optical fiber with the (LC)
Connect
(ports 0-23) originally routed optical
fibers fiber firmly. Ensure that
the height of the bundled
Binding optical fibers is lower than
position 3 55 mm.
(ports 0-35)
Send fibers Binding
upwards position 4
(ports 0-47)
2. Installation Information
5. Post-Installation Check
3 The vertical deviation of the cabinet must be smaller than 3 mm (you can Measure
use the plumb to measure the vertical deviation).
4 The cabinet rows near the main aisle must be aligned in a straight line, with Measure
the error less than 5 mm.
5 The surfaces of cabinets in a row must be in one plane, and the cabinets Observe
must be arranged closely and in order.
8 All vacant slots in a service subrack are filled in with filler panels. Observe
9 The mouseproof board should be installed after routing cables and fixed Observe
with screws; Each mouseproof board should be banded with another one
with wire clip; The gap between the cable and the mouseproof should less
than 10 mm.
11 Signal should not be damaged or broken, and there should not be any joint on the Observe
cable.
12 The connectors of the signal cables must be neat and intact. The connectors must be Observe
connected correctly and firmly. The tips of the connectors must be connected securely.
13 Signal cables must be laid horizontally or vertically without crossing, and must be Observe
bundled moderately at the turning. (Crossing is allowed for cables within 1 m outside
the cabinet.)
14 Labels at both ends of the signal cables must be marked correctly, clearly and neatly. Observe
15 The optical fibers routed outside the cabinet must be protected in a corrugated pipe, Observe
and must be protected from being extruded by other cables and goods.
16 The optical fibers must be protected in a corrugated pipe when being routed into the Measure,
cabinet, and the corrugated pipe must be laid inside the cabinet. The length of the observe
corrugated pipe inside the cabinet must not exceed 10 cm, and the corrugated pipe
must be fastened and bundled reliably.
17 Curvature radius of the optical fiber must be 20 times larger than the diameter of the optical Measure,
fiber. In general, the curvature radius of the optical fiber must be greater than or equal to 40 observe
mm. There should be no sharp components on the routing path of the optical fibers.
18 Place the optical fiber pairs in order and bind them carefully with optical binders. No sharp Observe
edge is allowed.
18 The routing of power cables and ground cables must comply with the engineering design. Observe
This helps maintenance and expansion.
19 The power cable and ground cable must adopt an entire segment of copper core. The cable Observe
should have no connection in the middle or scratch on the skin.
20 The power cables and ground cables must be connected correctly and reliably. Observe
21 The cross-sectional area of the power cable and ground cable must comply with the Observe
engineering design, meeting the requirements of running the equipment.
22 The power cables, ground cables, and signal cables must be routed separately. Observe
23 The power cables and ground cables must be routed horizontally and vertically without Observe
crossover. Proper margins must be reserved at the turning.
24 The identifiers on the power cable, ground cable, and power switch must be correct, legible, Observe
and neat.
Check the status of the lower service subrack and fan tray.
Check the status of the upper service subrack and fan tray.
2. Installation Information
5. Post-Installation Check
2 TXD
3 RXD 5 4 3 2 1
5 GROUND
2. Installation Information
5. Post-Installation Check