Section: I
1. INVITATION FOR BIDS
Page | 3
Sr. No. Information Details
6. In the event of the date specified for receipt and opening of bid being
declared as a holiday for GSCW, the due date for submission of bids and
opening of bids will be the following working day at the appointed time.
7. GSCW/GIL reserves the right to accept or reject any tender offer without
assigning any reason.
8. After Last date of submission of queries from the bidders will not be
entertained.
9. Financial bids of only those bidders who qualify on the basis of evaluation of
Technical presentation will be opened.
10. GSCW/GIL is not liable for any cost incurred by a Bidder in the preparation
and production of any Proposal, the preparation or execution of any
benchmark demonstrations, simulation or laboratory service or for any work
performed prior to the execution of a formal contract. All materials
submitted become the property of the GSCW/GIL and may be returned at
its sole discretion. The content of each Bidder’s Proposal will be held in strict
confidence during the evaluation process, and details of any Proposals will
not be discussed outside the evaluation process.
11. The Validity of Tender is 180 days after the date of financial bid opening.
Page | 4
Section: II
2. INSTRUCTIONS TO BIDDERS
Page | 5
2.4 Amendment of Bidding Documents
2.4.1 At any time prior to the deadline for submission of bids, GSCW/GIL may, for
any reason, whether on its own initiative or in response to the clarification
may change their biding document by amendment; the amendment will
be uploaded online through https://gil.nprocure.com.
2.4.2 In order to allow prospective bidders reasonable time to consider the
amendments while preparing their bids, GSCW/GIL at its discretion, may
extend the deadline for submission of bids.
2.4.3 All prospective bidders who have received the bidding documents will be
notified of the amendment in writing, and will be binding on them.
2.4.4 At any time prior to the last date for receipt of bids, GIL may for any reason,
whether at its own initiative or in response to a clarification requested by a
prospective Bidder, modify the RFP Document by a corrigendum.
2.4.5 Any such corrigendum shall be deemed to be incorporated into this RFP.
B. PREPARATION OF BIDS
Page | 6
2.10 Period of Validity Bids
2.10.1 Bids shall be valid for 180 days after the date of bid opening of Financial
Bid. The GSCW/GIL shall reject a Bid valid for a shorter period as non-
responsive.
2.10.2 In exceptional circumstances, the tendering Authority may solicit the
Bidder’s consent to an extension of the period of validity. The request and
the responses thereto shall be made in writing.
2.10.3 Bid evaluation will be based on the bid prices without taking into
consideration the above changes.
Page | 7
2.17 Preliminary Opening of Bids by GIL
2.17.1 GSCW/GIL will open the Preliminary stage of DD of Bid processing fees in
the presence of Bidder or his representative who choose to attend, and at
the following address:
Gujarat Informatics Ltd,
Block No. 2, 2nd Floor,
Karmayogi Bhavan, Gandhinagar.
2.17.2 The Bidder’s representative who is present shall sign an attendance register
evidencing their attendance. In the event of the specified date of
Preliminary Stage opening being declared holiday for GIL office, the Bid
shall be opened at the appointed time and location on the next working
day.
2.17.3 Bids that are not opened and read out at bid opening shall not be
considered for further evaluation, irrespective of the circumstances.
2.18 Preliminary Examination
2.18.1 GSCW/GIL will examine the bids to determine whether they are complete,
whether any computational errors have been made, whether sureties have
been furnished, whether the documents have been properly signed, and
whether the bids are generally in order.
2.18.2 If a Bid is not substantially responsive, it will be rejected by GSCW/GIL and
may not subsequently be made responsive by the Bidder by correction of
the non-conformity.
2.18.3 Conditional bids are liable to be rejected.
2.19 Methodology & Criteria for Technical, Commercial and Final evaluation
2.19.1 GSCW will form a Committee which will evaluate the Presentation Criteria
based on technical presentation presented by bidders for a detailed
scrutiny.
2.19.2 The bidders are expected to provide all the required supporting
documents & compliances as mentioned in this RFP. Any deviation from the
same will lead to the disqualification.
2.19.3 Technical Presentation Evaluation Criteria
Sr. Max.
Presentation Evaluation Criteria
No. Score
General
Page | 8
5 Color scheme flexibility, balance, image proportion 10
Technical
Note:
1. Out of 100 marks, Min. 60 marks will be required to qualify for opening of
Financial bid (i.e. Minimum 60% score is required to qualify for next stage of
opening of the financial bid)
2. 50% weightage of technical score and 50% weightage of financial score
will be considered for the final evaluation.
Page | 9
accepted and Contract Agreement will be signed. After signing of the
Contract Agreement, no variation in or modification of the term of the
Contract shall be made except by written amendment signed by all the
parties. Within 15 days of receipt of the Contract Form, the successful
bidder shall sign and date the contract and return it to GSCW/GIL.
Page | 10
2.19.9 Termination for Default or Otherwise
GSCW/ GIL may, without prejudice to any other remedy for breach of
contract, by written notice of default sent to the Website Developer,
terminate the Contract in whole or part:
If the Website Developer fails to perform any or all of the design,
development works within the period(s)/schedule specified in the
Contract,
If the Website Developer fails to perform as per the performance
standards.
If the Website Developer, in the judgment of GSCW / GIL has engaged
in corrupt or fraudulent practices in competing for or in executing the
Contract.
2.19.10 Taxes and Duties
The rates quoted shall be in Indian Rupees and shall be exclusive of all taxes as
applicable up to the completion of job. Any increase in the Rates except taxes
will not be allowed after signing the Contract Document.
All decisions taken by GSCW regarding the processing of this tender and award
of contract shall be final and binding on all parties concerned.
2.19.12 Performance Bank Guarantee
1. The successful Bidder has to furnish a security deposit so as
guarantee his/her (Bidder) performance of the contract.
2. The Successful Web developer has to submit Performance Bank
Guarantee @ 10% of total order value within 15 days from the receipt
of notification of award from “GIL” from all Nationalized Bank including
the public sector bank or Private Sector Banks authorized by RBI or
Commercial Bank or Regional Rural Banks of Gujarat or Co-Operative
Bank of Gujarat (operating in India having branch at Ahmedabad/
Gandhinagar) as per the G.R. no. EMD/10/2015/508/DMO dated
27.04.2016, EMD/10/2015/508/DMO dated 14.06.2016 & dated
01/05/2017 issued by Finance Department or further instruction issued
by Finance department time to time.
3. The Performance Security will be valid up to the end of warranty period
4. If the O & M support required to be extended for further period after
the expiry of warranty of five years then the period of PBG should also
be extended.
5. The proceeds of the performance security shall be payable to GSCW
as compensation for any loss resulting from the Service Provider’s
failure to complete its obligations under the Contract.
6. The Performance Security shall be denominated in Indian Rupees.
7. Within 15 days of the receipt of notification of award from “GIL”, the
successful bidder shall furnish the performance security in
Page | 11
accordance with the Conditions of the Contract, in the performance
security Form provided in the bidding documents in the Performa
prescribed in the Tender.
8. The Performance Security will be discharged by GSCW and returned
to the Bidder on completion of the bidder’s performance obligations
under the contract.
9. No interest shall be payable on the PBG amount. GSCW may invoke
the above bank guarantee for any kind of recoveries, in case; the
recoveries from the bidder exceed the amount payable to the bidder.
2.19.13 Proposed timelines for Implementation from the date of issuance of work
Order
The service provider will have to complete the work within 3 months from
the date of work order issued.
Timelines
Sr. No. Milestone
T = Date of work order
1 Preparation of SRS – study report T1 = T + 15
2 Website Design and Development T2 = T1 + 45
3 Security Audit T3 = T2 + 20
4 UAT and Go Live of Website T4 = T3 + 10
Page | 12
evaluated bid to make a similar determination of the Bidder’s capabilities to
perform the contract satisfactorily.
2.23 GIL/GSCW reserve the right to accept or reject any bid, and to cancel the
bidding process and reject all bids at any time prior to award of Contract,
without thereby incurring any liability to the affected Bidder or bidders or any
obligation to inform the affected Bidder or bidders of the grounds for GIL/
GSCW action.
2.24 GIL/GSCW shall reject a proposal for award if it determines that the Bidder
recommended for award has engaged in corrupt or fraudulent practices
and same shall be conveyed to GIL or black listed by any of the
GIL/Government of Gujarat in competing for the contract in question.
2.25 GIL/GSCW shall declare a firm ineligible, and blacklisted either indefinitely or
for a stated period of time, to be awarded a contract if it at any time
determines that the firm has engaged in corrupt and fraudulent practices in
competing for, or in executing, a contract.
2.26 After presentation, each bidder will have to submit the copy of the
presentation and necessary documents to the authorized person of
GIL/GSCW without fail.
2.27 After techno-financial evaluation, when the two bidders is H1 (i.e. highest
score) with same score with/without two decimal points then for said two
bidders, highest score of technically qualified bidder is consider as H1 (i.e.
highest score) for the said contract of the Website development work.
Page | 13
Section: III SCOPE OF WORK
Introduction
The Gujarat State Commission for women, set up in 2005 as the state independent
organization to present the views of Women to government is an advisory non
departmental public body (NDPB) which fails into this category.
Vision
A world where all women can express their need and priorities and where
government listens and acts so that the needs of all women are considered in
government policy.
A world in which every women is respected and is able to achieve their
potential, living free from harm and discrimination.
GSCW investigates allegations against public functionaries in the State of Gujarat, such
as:
Page | 14
Technical Scope of Work
Currently, GSCW has following URL: http://www.scwgujarat.org/ website but this website
might be down sometime. So that, they want to revamp of exiting website of GSCW.
The Technical scope of work for Revamping of exiting website of GSCW is as below:
Page | 15
14. Website should be in specific manner so that authorize official can easily
maintain the respective content themselves.
15. There should be clear distinction in content for authorized user and general
public. i. e. Authorized users will be created for the websites by CMS. This
system is CMS based. Role based access to be given to user to perform
activities like upload files, update content etc.
16. Website should be updated in consultation with the concerned authority,
which will be informed to you from time to time.
17. There should be a provision for integration of Social Media.
18. Web developer should develop a website with the concept of less web space
and memory. So, web pages can load quickly but this shall also
accommodate requirement of Department.
19. Website should be regularly monitored and assessed to ensure content
authentication and updation.
20. There should be a location access through map in contact web page.
21. Mechanism is in place to ensure that all outdated announcements are
removed from the website or moved to archive.
22. Website has a Copyright Policy, Terms & Conditions and Privacy Policy,
prominently displayed on the homepage.
The Selected bidder needs to develop entry form in the CMS that form can be
access through district login only so bidder needs to create district wise login
also. District user can only see the entry form not the other functionality of CMS.
The require detail for login creation will be provide by GSCW at the time of
development.
Entry Forms contains following fields: District Code, District Name, Taluka code,
Taluka Name, Year, Month, Type of Cases, Last month Pending Cases, received
application, Total, Disposed, Pending. The sample report is attached at Form IV.
Once district user can enter data in to the entry form then that data entered by
district user can available to admin/super admin login for the verification after
the verification of the detail/data the data goes to the CM Dashboard through
API. So bidder needs to develop a web API for sending data verify by
admin/super admin user to the CM Dashboard.
There should be provision for admin/super admin user to give access/rights to the
new user.
The selected web developer shall follow the design, Development and Technical
standards specified in the guidelines of DARPG (GIGW) for Indian Government
websites issued and updated from time to time by NIC shall be complied with. So,
Page | 16
the new website should be accessible to persons with Disabilities (PwD) as per the
guidelines issued by DARPG (GIGW) and W3C (WCAG).
Features related
1. The home page which contain basic information and dynamic interactive pages
on including following points:
o Introduction
o About us
o Latest news
o Department
o Activity Cells
o Citizen Charters
o Statistics
o Procedure
o Success Stories
o Telephone Directory
o E-Citizen
o Schemes
o Circular’s / Notifications
o Photo Gallery
o Video Gallery
o Search
Page | 17
o Important Links
o RTI ACT
o Privacy policy
o Downloads
o Contact us
o Feedback
o FAQs
o RSS Feed
o Useful links
o Visitor counter
o Disclaimer
o Sitemap
2. Website should provide facility to upload the content without any technical
knowledge i.e. Website should integrate with Content Management System.
3. Website should have facility to last updated page date automatically.
4. Password should not be hardcoded in any website configuration files or stored in
plain text. Passwords should be properly hashed and salted to reduce the
effectiveness of password cracking.
5. Website should be IPv6 compliant.
6. Website should be running on SSL i.e. http request should automatically get
redirected to https. SSL certificate for new website will be provided by the
department. The new website will be host on GSDC. The Selected bidder has to
install the same on the new website.
7. Web developer should be responsible for macro level and micro level design of
the website ensuring that the site is contemporary in all respects to the extension
possible.
8. The Website Developer should be responsible for ensuring that all the Software,
Plugins, Scripts etc., used for the development of the Website is updated with the
latest patches and are free of any known vulnerabilities. The updation of
patches should be carried out within 15 days from the date of announcement of
the patch by OEM (in case of High Critical Vulnerabilities) and 30 days (in case
of other vulnerabilities) in consultation with composite team of GSDC.
Page | 18
9. The Website Developer may strive to use Open Source Software to design
Websites. The use of Open Source Software should be as per the Framework on
Open Source Software issued by Govt. of India
(http://egovstandards.gov.in/sites/default/files/Framework%20for%20Adoption%20of%20Open
%20Source%20Software%20in%20e‐Governance%20Systems.pdf). For selection of
Technology, Bidder has to propose the best technology platform for the said
website.
10. Searching facility in the website for internal website search as well as advance
search option.
11. The selected web developer has to study the requirement in details in
consultation with Department and develop the Website accordingly after due
approval of concern Organization.
GIGW Guidelines
For compliance in GIGW, the selected bidder has to compliance the
new website as per the GIGW standards. The Selected bidder has to
provide own certificate for compliance of GIGW standard.
User should be able to operate on various Operating Systems like
Windows, UNIX, LINUX, etc.
The pages should be printer friendly i.e. all the pages shall be
displayed and printed upon demand by user.
To improve the experience of the Web on mobile devices and other
handheld devices like iPad, tablets etc. the website needs to be
developed with “One Web” concept. (One Web means making, as far
as is reasonable, the same information and services available to users
irrespective of the device they are using)
Multi-language
Website will be developed in two different languages (English and Gujarati) with an
option for the users to switch between the languages. At present website is in
English only, so the Selected bidder is expected to translate English content in to the
Guajarati content then publish it to the site after taking approval from GSCW.
Security Audit
Website should be hosted and released only after undergoing the Website Security
Audit as per the guidelines of Government of India and obtaining a Security
Page | 19
Audit Clearance certificate from CERT-in empaneled IT Security Auditors. GSCW
may take help of GIL for selection of Security auditor for Security audit of website. So,
Payment of Security audit would be paid by GSCW. Web developer should be
responsible to fix the vulnerabilities found even after the hosting is completed till the
completion of its contract period with GSCW, Government of Gujarat.
Miscellaneous:
During operation and maintenance phase, Service Provider’s onsite team should
co-ordinate with GSDC in order to ensure that the website is functioning as per
standard norms. GSCW will provide all necessary administrative support to team. If
required, GSCW will take responsibility of arranging any meeting with Gujarat State
Data Centre, Gandhinagar.
Bidder is expected to host the website at their premises during the period of
development and security audit and thereafter it has to be transferred in GSDC.
Operational Acceptance
Page | 20
In order to accept the system, Department must be satisfied that all of the
work has been completed and delivered to Department’s complete
satisfaction and that all aspects of the system perform acceptably. The
functional/logical acceptance of the system will only be certified when
the proposed system is installed and configured according to the design
and that all the detailed procedures of operating them have been carried
out by the Bidder in the presence of Department team.
The Successful bidder shall maintain and support the supplied software
(Website) for a period of 5 year after the successful operational acceptance
without any additional cost.
Training
Page | 21
single location i.e. Gandhinagar. All the necessary arrangement like projector
is given by department.
Copyright
Any software, hardware, data, awards, certificates, patent, etc. shall be absolute
property of GSCW, Government of Gujarat. The Successful bidder will transfer to the
Department all Intellectual Property Rights in the Software developed. The bidder
shall relinquish to the Department source code of the developed Website within
Five (5) days from the date of acceptance of the system. The source code
supplied to the Department shall at all times be a complete, accurate, and up-to-
date copy corresponding exactly to the current production release of the software.
Place of Performance
The Successful bidder shall perform a majority of the work at its own facility. The
bidder shall be required to meet at the GSCW facility once per week (day and
time TBD) for a weekly status meeting. Additionally, all project reviews will be held
at the Department facility and attended by the bidder. GSCW shall provide and
arrange for meeting spaces within its facility for all required bidder meetings.
Once the project reaches the training phase, all training shall be conducted at the
GSCW facility.
Documentation
The project team shall provide the following documentations in hard as well as soft
copies:
Detail Project Plan
Fortnightly progress reports
System Requirement Specification (SRS) document containing detailed
requirement capture and analysis including functional requirement, Interface
Specifications, application security requirements.
Page | 22
Complete Source Code with required documentation. Two sets of User manual
(i.e. two hard & soft copies in English language and hard & soft copies in Gujarati
language) for administration and management of website.
Test Plans and Test cases (including Unit Test Plan, System/Integration Test Plan,
User Acceptance Test Plan).
Test report w.r.t the functionality, Compliance to W3C Standard & WCAG 2.0
level AA.
Original Security Audit report and Clearance Certificate
Training Manuals and literature which will include all details pertaining System
Administration, CMS Tool, Website Users, Installation, Operations, Maintenance
and Security policy and procedure for website including Password security,
logical access security, operating system security, data classification, and
application security and data backups.
Source Code:
The source code (published and unpublished) of the website shall be the sole
property of the GSCW, Gandhinagar.
Time limit:
The service provider will have to complete the work within 3 months from the
date of work order issued.
Other Terms & Condition & Scope are as per the GR. No. WEB/2006/1178/IT (Part File),
Department of Science & Technology, Gandhinagar, dated 16th July, 2015.
Page | 23
SECTION IV
Page | 24
Form II: FINANCIAL BID
Sr. Amount
Description
No. (Rs.)
Note:
1. Bidder should include development cost of form and web service mentioned in
scope of work.
2. The rate should not be provided as a percentage figure but in absolute Indian
Rupees.
3. GST is extra as applicable.
Page | 25
Form III: Performance Bank Guarantee
Dear Sir,
The Bank undertakes not to revoke this guarantee during its currency without previous
consent of the OWNER/PURCHASER and further agrees that the guarantee herein
contained shall continue to be enforceable till the OWNER/PURCHASER discharges this
guarantee. OWNER/PURCHASER shall have the fullest liberty without affecting in any
way the liability of the Bank under this guarantee from time to time to extend the time
for performance by the SELLER of the aforementioned CONTRACT. The OWNER/
PURCHASER shall have the fullest liberty, without affecting this guarantee, to postpone
from time to time the exercise of any powers vested in them or of any right which they
might have against the SELLER, and to exercise the same at any time in any manner,
and either to enforce to forebear to enforce any covenants contained or implied, in
the aforementioned CONTRACT between the OWNER/PURCHASER and the SELLER or
any other course of or remedy or security available to the OWNER/PURCHASER.
Page | 26
The Bank shall not be released of its obligations under these presents by any exercise by
the OWNER/PURCHAER of its liability with reference to the matters aforesaid or any of
them or by reason or any other acts of omission or commission on the part of the
OWNER/PURCHASER or any other indulgence shown by the OWNER/PURCHASER or by
any other matter or things.
The Bank also agree that the OWNER/PUCHASER at its option shall be entitled to
enforce this Guarantee against the Bank as a Principal Debtor, in the first instance
without proceeding against the SELLER and not withstanding any security or other
guarantee that the OWNER/PURCHASER may have in relation to the SELLER’s liabilities.
Notwithstanding anything contained herein above our liability under this Guarantee is
restricted to Rs. _________________ (Rupees _________________________) and it shall
remain in force up to and including ________________ and shall be extended from time
to time for such period as may be desired by the SELLER on whose behalf this
guarantee has been given.
_____________________
Signed and delivered by
_____________________
All Nationalized Bank including the public sector bank or Private Sector Banks or
Commercial Banks or Co-Operative Banks (operating in India having branch at
Ahmedabad/ Gandhinagar) as per the G.R. no. GR No. EMD/10/2018/18/DMO dated
16/04/2018, EMD/10/2015/508/DMO dated 27.04.2016, EMD/10/2015/508/DMO dated
14.06.2016 and 01/05/2017 issued by Finance Department or further instruction issued by
Finance department time to time.
Page | 27