The document provides a list of materials needed for a project including the quantity of each item, the price per item, and the total cost. It details that 10 square bars costing P250 each, 20 yards of safety net at P150 per yard, 1 kilo of welding rod at P100 per kilo, 100 cable ties at P3 each, and 4 tires at P80 each will have a total project cost of P6220.
The document provides a list of materials needed for a project including the quantity of each item, the price per item, and the total cost. It details that 10 square bars costing P250 each, 20 yards of safety net at P150 per yard, 1 kilo of welding rod at P100 per kilo, 100 cable ties at P3 each, and 4 tires at P80 each will have a total project cost of P6220.
The document provides a list of materials needed for a project including the quantity of each item, the price per item, and the total cost. It details that 10 square bars costing P250 each, 20 yards of safety net at P150 per yard, 1 kilo of welding rod at P100 per kilo, 100 cable ties at P3 each, and 4 tires at P80 each will have a total project cost of P6220.
KAGAMITAN BAWAT ISA PRESYO 1. Square Bar 10 P 250 P 2500.00 2. Safety Net 20 yarda P 150/yarda P 3000.00 3. Welding Rod 1 kilo P 100/kilo P 100.00 4. Cable Tie 100 P3 P 300.00 5. Tires/Gulong 4 P 80 P 320.00 KABUUANG PONDO P 6220.00