You are on page 1of 6

New Bridge Construction Project over the

Kelani River
Package-1: Steel Bridge Section

Handover Materials to RDA


Date Ref. No

Item No Description Unit Quantity Remarks

Hand Over By: Receive By:


Name Name

Designation Designation
Signature Signature
New Bridge Construction Project over the
Kelani River
Package-1: Steel Bridge Section

Handover Materials to CMC


Date Ref. No

Item No Description Unit Quantity Remarks

Hand Over By: Receive By:


Name Name

Designation Designation
Signature Signature
New Bridge Construction Project over the Kelani
River
Package-1: Steel Bridge Section

Handover Materials to Sierra


Date Ref. No

Item No Description Unit Quantity Remarks

Handed Over By: Witness By: Received By:


Name Name Name

Designation Designation Designation


Signature Signature Signature

You might also like