You are on page 1of 9

TAKING OFF SHEET

Project Date Prepared


Bill Number Drawing No
T D S Description T D S Description
wall fdn (1'6" x 2') walls
1/ 149.5 cl length - ft
1.25 ft
2 373.75 cuft

Excavation for wall fdn (9" x 1'2")


1/ 149.5 cl length - ft
1.25 ft
1 186.88 cuft
186.88 cuft

brick work for plinth beam


2/1/ 275.25
0.75 412.88 sqft

concrete for plinth beam


1/ 83.896 m
0.225
0.225 4.2472 m.cu

Rebar for plinth beam


4/ 13.983 55.931 Bars/ T12
49.667 KG

93.218 0.7 65.253 m / mild steel


14.501 kg

Footings
15/1/ 3 ft
3 ft
1 135 cu.ft
3.821 m.cu

Rebar for footings

15/14/1 0.966 202.86 Bars/ T12

125.22 KG

Rebar for columns


15/4/1 6 360 Bars/ T12
320 KG
TAKING OFF SHEET

Project Date Prepared


Bill Number Drawing No
T D S Description T D S Description

Wall plastering
275.25
Constrcution of residentail house for. ….............

Item Description QTY Units Rate Amount

BILL NO 01 - Preliminaries

Allow lump sum for constructing,


maintaining,dismantling and removal on the
1.0 Item 20000.00
completion of the works,a temporary building
for protection and storage of materials

Allow lump sum for constructing,


maintaining,dismantling and removal on the
completion of the works,Contractor's site 1.0 Item 30000.00
office including staff rest-room, toilets and
other activities

Allow lump sum for obtaining water


connection,supplying and istalling water 1.0 Item 40000.00
meter.

Allow lump sum for obtaining temporary


electricity connection,supplying and installing 1.0 Item 30000.00
electricity meter.

Total carried 120,000.00


Constrcution of residentail house for. ….............

Item Description Units QTY Rate Amount

BILL NO 02 - Excavation

Excavation for wall foundations cuft 186.9 -

Total carried -

BILL NO 03 - Foundation works

Random rubble foundation work in cement 355.00


cuft 373.8 132,681.25
and sand (1:5)

Brick work in cement and sand (1:5) - For sqft 412.875 237.00 97,851.38
plinth beam

Total carried 230,532.63

BILL NO 04 - Concrete works (Grade C-25)

Plinth beam m.cu 4.25 32,200.00 136,761.29

Footings m.cu 3.8205 32,200.00 123,020.10

Total carried 259,781.39

BILL NO 05 - Rebar works of plinth beams

Tor steel reinforcement bent to shape,


laid in position and tied with G.I. Wire as kg 49.7 650.00 32,283.26
directed.

Mild steel reinforcement bent to shape,


laid in position and tied with G.I. Wire as kg 14.500578 650.00 9,425.38
directed.

BILL NO 06 - Rebar works of footings

Tor steel reinforcement bent to shape,


laid in position and tied with G.I. Wire as kg 125.22 650.00 81,394.44
directed.

BILL NO 07 - Rebar works of Columns

Tor steel reinforcement bent to shape,


laid in position and tied with G.I. Wire as kg 160 650.00 104,000.00
directed.
Mild steel reinforcement bent to shape,
laid in position and tied with G.I. Wire as kg
directed.

Total carried 227,103.08

Constrcution of residentail house for. ….............

Item Description Units QTY Rate Amount

BILL NO 06 - Masonry works

4" Thick block work in cement and sand


sqft 360.0 119.80 43,128.00
mortar 1:5 (4" x 8" x 16")

5/8" thick Plastering to wall in cement


and sand 1:5 finished smooth with lime sqft #VALUE! 93.00 #VALUE!
putty floating.

Total carried #VALUE!

BILL NO 07 - Paint Works

Painting walls with emulsion paint (2 Coats) Sqft 720 36.68 26,409.60

Total carried 26,409.60

BILL NO 08 - Roof Works (Including


gutters)

Allow lump sum for roof works (including item 1 500,000.00 500,000.00
gutters)

Total carried 500,000.00

BILL NO 09 - Tiling works

Terrazzo floor tiles on 1/2" thick cement


sqft 1278 562.75 719,194.50
and sand 1:2 in ground floor

Total carried 719,194.50


BILL NO 10 - Earth filling / Floor
preparation

Filling under floors including levelling,


watering & compacting in 3" layers with cuft 1278 63.50 81,153.00
imported gravel

Total carried 81,153.00


Constrcution of residentail house for. ….............

Item Description Units QTY Rate Amount

BILL NO 11 - Bathroom preparation

Bathroom accessories Item 2 150,000.00 300,000.00

Tiling / Plumbing / Fxing bathroom acessories Item 2 50,000.00 100,000.00

Total carried 400,000.00

BILL NO 12 - Plumbing works

Allow lump sum for all plumbing works Item 75,000.00

Total carried 75,000.00

BILL NO 13 - Electrical works

Allow lump sum for all electrical works Item 250,000.00

Total carried 250,000.00

BILL NO 14 - Carpentary works

Supplying and fixing Door type DD ,


overall size 4' 4" X 8' 6" Timber Side Hung Item 1.0 40,000.00 40,000.00
Swing Door

Supplying and fixing Door type DD1 ,


overall size 3' 3" x 7' 0" Timber Side Hung Item 1.0 30,000.00 30,000.00
Swing Door

Supplying and fixing Door type D , overall


size 3' 2" x 8' 6" Timber Side Hung Swing Item 2.0 30,000.00 60,000.00
Door
Supplying and fixing Door type D1 , overall
size 3' 0" x 7' 0" Timber Side Hung Swing Item 2.0 30,000.00 60,000.00
Door

Supplying and fixing Door type D2 , overall


size 2' 10" x 7' 0 Aluminium Side Hung Item 2.0 10,000.00 20,000.00
Swing Door

Constrcution of residentail house for. ….............

Item Description Units QTY Rate Amount

Supplying and fixing window type W ,


overall size 8' 0" x 8' 6" Timber Side Hung Item 1.0 38,000.00 38,000.00
Swing window

Supplying and fixing window type W1 ,


overall size 6' 0" x 8' 6" Timber Side Hung Item 1.0 20,000.00 20,000.00
Swing window

Supplying and fixing window type W2 ,


overall size 4' 0" x 8' 6" Timber Side Hung Item 3 20,000.00 60,000.00
Swing window

Supplying and fixing window type W3 ,


overall size 8' 0" x 5' 6" Timber Side Hung Item 1 20,000.00 20,000.00
Swing window

Supplying and fixing window type W4 ,


overall size 6' 0" x 5' 6" Timber Side Hung Item 1 20,000.00 20,000.00
Swing window

Supplying and fixing window type W5 ,


overall size 4' 0" x 4' 6" Timber Side Hung Item 1 15,000.00 15,000.00
Swing window

Supplying and fixing fan light type F , Item 2 6,000.00 12,000.00


overall size 4' 0" x 3' 6"

Total carried 395,000.00


Constrcution of residentail house for. ….............

GRAND SUMMARY

Bill No Description Amount

01 Preliminaries 120,000.00

02 Excavation -

03 Foundation works 230,532.63

04 Concrete works 259,781.39

05 Rebar works of plinth beams 227,103.08

06 Masonry works #VALUE!

07 Paint Works 26,409.60

08 Roof Works (Including gutters) 500,000.00

09 Tiling works 719,194.50

10 Earth filling / Floor preparation 81,153.00

11 Bathroom preparation 400,000.00

12 Plumbing works 75,000.00

13 Electrical works 250,000.00

14 Carpentary works 395,000.00

TOTAL #VALUE!