100% found this document useful (1 vote)
2K views3 pages

Landscape Work BOQ

This document provides a bill of quantities for landscape work for a new social office building project in Timor Leste. It includes costs for park and office platform work, park electrical work, fence work, security posts, and building perimeter drainage work. The total cost for all landscape work is calculated by summing the costs for each section, which include preliminary works, masonry, concrete, electrical installations, and other materials.

Uploaded by

icko
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
2K views3 pages

Landscape Work BOQ

This document provides a bill of quantities for landscape work for a new social office building project in Timor Leste. It includes costs for park and office platform work, park electrical work, fence work, security posts, and building perimeter drainage work. The total cost for all landscape work is calculated by summing the costs for each section, which include preliminary works, masonry, concrete, electrical installations, and other materials.

Uploaded by

icko
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

BILL OF QUANTITY

PROJECT TITLE : NEW CONSTRUCTION OF SOCIAL OFFICE BUILDING


AT CAICOLI - DILI, TIMOR LESTE
LOCATION : DILI , TIMOR LESTE

LANDSCAPE WORK

Unit Cost Total Cost


No Description Unit Quantity
(USD) (USD)
I PARK AND OFFICE PLATFORM WORK
A PRELIMINARY WORK
3
1 Sand filling, t = 10 cm M 707.40
2 Pavingblock work M2 1,512.23
3
3 Kansteen concrete work- K125 M 265.47
4 Concrete rebate, t = 10 cm - K125 M2 151.22
5 Concrete park bench - K125 Unit 50.00
6 Concrete flowerpot - K125 Unit 50.00
7 Garbage fiber box Unit 25.00
8 Supply and installation ornamental plant Ls 1.00
3
9 Humus soil M 756.12
10 Supply and installation flagpole such as drawing appeared Unit 1.00
complete with all accessories

Total for Preliminary Work


II PARK ELECTRICAL WORK
1 Spotlight 1000 watts, complet Unit 10.00
2 Glass ball lamp 40 watts, complete Unit 25.00
3 Decorative lamp of park 120 watts, complete Unit 25.00

Total for Park Electrical Work


III FENCE WORK
A EARTH AND SAND WORK
1 Excavation for ordinary foundation M3 370.00
2 Foundation excavation backfilling M3 92.50
3 Sand filling under foundation M3 37.00

Total for Earth And Sand Work


B WALL MASONRY AND PLASTER WORK
1 Aanstamping M3 74.00
2 Stone masonry work (1 Cement : 4 Sand) M3 183.15
3 Ordinary block wall masonry (1 Cement : 5 Sand) M3 71.70
4 Ordinary wall plaster (1 Cement : 5 Sand) M2 1,434.00
5 Ordinary foundation plaster (1 Cementr : 4 Sand) M2 518.00
6 Foundation cement render M2 518.00
7 Wall cement render M2 518.00

Total for Wall Masonry And Plaster Work


Unit Cost Total Cost
No Description Unit Quantity
(USD) (USD)
C CONCRETE WORK
3
1 Concrete sloof 150/200 mm - K175 M 11.10
3
2 Concrete ring balk 150/150 mm - K175 M 7.17
3
3 Concrete Column 250/250 mm + ornamen - K175 M 8.19
3
4 Concrete Column 400/400 mm + ornamen - K175 M 20.96

Total for Concrete Work


D PAINT WORK
2
1 Wall and column paint, merk dulux M 1,445.70

Total for Paint Work


E SUPPLY AND INSTALLATION WORK
1 Supply and installation pipe fence type A Each 44.00
2 Supply and installation pipe fence type B Each 44.00
3 Supply and installation main gate Each 2.00

Total for Supply And Installation Work


Total for Fence Work (A+B+C+D+E)
IV SECURITY POST, TWO UNITS
A EARTH AND SAND WORK
1 Excavation for ordinary foundation M3 7.20
2 Foundation excavation backfilling M3 1.80
3 Sand filling under foundation M3 0.90
3
4 Sand filling under floor M 1.10
5 Selected material filling for floor leveling M3 1.10

Total for Earth And Sand Work


B WALL MASONRY AND PLASTER WORK
1 Aanstamping M3 1.80
2 Stone masonry work (1 Cement : 4 Sand) M3 3.50
3 Ordinary block wall masonry (1 Cement : 5 Sand) M3 1.78
4 Ordinary wall plaster (1 Cement : 5 Sand) M2 35.50
5 Ordinary foundation plaster (1 Cementr : 4 Sand) M2 3.50
6 Foundation cement render M2 3.50
2
7 Wall cement render M 35.50

Total for Wall Masonry And Plaster Work


C CONCRETE WORK
1 Concrete rebate, t = 10 cm - K125 M3 0.55
2 Concrete sloof 150/200 mm - K175 M3 0.30
3 Concrete ring balk 150/200 mm - K175 M3 0.30
4 Concrete column 150/150 mm - K175 M3 0.25
5 Concrete table, t = 80 mm - K175 M3 0.08

Total for Concrete Work


D FLOOR WORK
1 Floor ceramic : 60x60 cm M2 5.52
2
2 Concrete table ceramic : 20x20 cm M 1.01

Total for Floor Work


Unit Cost Total Cost
No Description Unit Quantity
(USD) (USD)
E DOORS, WINDOWS, AND VENTILATIONS WORK
1 Door Type PS, including all accessories Unit 1.00
2 Ventilation Type BV1, including all accessories for Unit 1.00

Total for Doors, Windows, And Ventilations Work


F ROOF AND PLAFOND WORK
1 Metal tile roof cover (textur sand) + frame zincalume M2 18.73
including screw and all accessories
1
2 Metal tile rooftop M 12.09
2
3 Metal zincalume plafond + frame M 19.52
1
4 Gypsum Listplafond M 19.40

Total for Roof And Plafond Work


G PAINT WORK
1 Wall and column paint, merk dulux M2 35.50

Total for Earth And Sand Work


H ELECTRICAL INSTALATION WORK
1 Electrical instalation work Titik 2.00
2 Socket Each 1.00
3 Double switches Each 1.00
4 Pas. lampu XL Down light 18 watt lengkap tabung/accessories Each 1.00
5 Pas. lampu XL 18 watt lengkap accessories di tempel pd plafond Each 2.00

Total for Electrical Instalation Work


Total for Security Post, One Unit (A+B+C+D+E+F+G+H)
Total for Security Post, Two Units
V BUILDING PERIMETER DRAINAGE WORK
1 Excavation M3 1.44
2 Trasraam block wall masonry (1 Cement : 2 Sand) M3 32.57
2
3 Trasraam wall plaster (1 Cement : 2 Sand) M 162.83
4 Cement render M2 162.83
5 Iron grille Each 15.00

Total for Building Perimeter Drainage Work


Total for Landscape Work ( I + II + III + IV + V )