Perunding NFL Sdn Bhd

ITEM DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)

ELEMENT NO. A.1 - SITE CLEARANCE AND EARTHWORK


(ALL PROVISIONAL)

PACKAGE E1

NOTES:

B.Mahsuri - Road Realignment and Main Infra


Section H.2-Infrastructure Works H.2.1/2/1
849.13/Decemberr 2014
Perunding NFL Sdn Bhd

ITEM DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)

TO COLLECTION

ELEMENT NO. A.1 - LANDSCAPES WORKS

SOFTSCAPES

A General Conditions & Priliminaries

Supply and transport the following planting materials Lum.su $10,000.00


from the contractor nursery to the site including m
uploading and placing in position

B Trees

Dwg Ref :
1 Corylus Colurna nos. 7 $280.00 $1,960.00

2 Vachellia Nilotica nos. 31 $250.00 $7,750.00

C Palms

Dwg Ref :
1 Pheonix Dactylifera nos. 43 $1,000.00 $43,000.00

D Shrubs and Groundcover

Dwg Ref :
1 Acanthophyllum Squarrosum nos. 14 $28.00 $392.00

2 Amaranthus Paniculatus nos. 417 $20.00 $8,340.00

3 Calamintha Graveolens nos. 360 $25.00 $9,000.00

E Holes Excavation

1 Trees

Supply all labour, equipments, tools, transport, etc and nos. 38 $30.00 $1,140.00
excavate hole overall size 1m x 1m x 1m and cart away
excavated materials

2 Palms

Supply all labour, equipments, tools, transport, etc and nos. 43 $30.00 $1,290.00
excavate hole overall size 1.5m x 1.5m x 1.5m and cart
away excavated materials

3 Shrubs

Supply all labour, equipments, tools, transport, etc and nos. 791 $20.00 $15,820.00
excavate hole overall size 0.3m x 0.3m x 0.3m and cart
away excavated materials

B.Mahsuri - Road Realignment and Main Infra


Section H.2-Infrastructure Works H.2.1/2/2
849.13/Decemberr 2014
Perunding NFL Sdn Bhd

ITEM DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)

TO COLLECTION $98,692.00

ELEMENT NO. A.1 - SITE CLEARANCE AND EARTHWORK


(ALL PROVISIONAL)

SECTION 2 (CONT'D)

TO COLLECTION $0.00

ELEMENT NO. H.2.1 - SITE CLEARANCE AND


EARTHWORK (ALL PROVISIONAL)

SECTION 2 (CONT'D)

B.Mahsuri - Road Realignment and Main Infra


Section H.2-Infrastructure Works H.2.1/2/3
849.13/Decemberr 2014
Perunding NFL Sdn Bhd

ITEM DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)

TO COLLECTION $0.00

ELEMENT NO. H.2.1 - SITE CLEARANCE AND


EARTHWORK (ALL PROVISIONAL)

SECTION 2 (CONT'D)

B.Mahsuri - Road Realignment and Main Infra


Section H.2-Infrastructure Works H.2.1/2/4
849.13/Decemberr 2014
Perunding NFL Sdn Bhd

ITEM DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)

B.Mahsuri - Road Realignment and Main Infra


Section H.2-Infrastructure Works H.2.1/2/5
849.13/Decemberr 2014
Perunding NFL Sdn Bhd

ITEM DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)

B.Mahsuri - Road Realignment and Main Infra


Section H.2-Infrastructure Works H.2.1/2/6
849.13/Decemberr 2014
Perunding NFL Sdn Bhd

ITEM DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)

C Supply and lay spot turfing from approved sources m2 557 $0.00
including top soil well watered until well establish all
subject to the S.O's approval

Any other items or works not specified above but is $0.00


shown on or implied from drawings and/or included in
specifications or are essential for the proper execution
and completion of the works

a) ………………………………………………………… $0.00

b) ………………………………………………………… $0.00

c) ………………………………………………………… $0.00

d) ………………………………………………………… $0.00

TO COLLECTION $0.00

ELEMENT NO. H.2.1 - SITE CLEARANCE AND


EARTHWORK (ALL PROVISIONAL)

SECTION 2 (CONT'D)

COLLECTION:

Page No. H.2.1/2/1 $0.00

B.Mahsuri - Road Realignment and Main Infra


Section H.2-Infrastructure Works H.2.1/2/7
849.13/Decemberr 2014
Perunding NFL Sdn Bhd

ITEM DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)

Page No. H.2.1/2/2 $0.00

Page No. H.2.1/2/3 $0.00

Page No. H.2.1/2/4 $0.00

Page No. H.2.1/2/5 $0.00

Page No. H.2.1/2/6 $0.00

Page No. H.2.1/2/7 $0.00

$0.00
TOTAL CARRIED TO SUMMARY

B.Mahsuri - Road Realignment and Main Infra


Section H.2-Infrastructure Works H.2.1/2/8
849.13/Decemberr 2014
Perunding NFL Sdn Bhd

ITEM DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)

ELEMENT NO. H.2.1 - SITE CLEARANCE AND


EARTHWORK (ALL PROVISIONAL)

PACKAGE E1

NOTES:

1) This Bill shall be read in conjunction with the Tender


Drawings, Specifications, Preliminaries and Preambles to
the Bills of Quantities attached.

2) The word "as described" where used in this Bill shall


mean as described in the above documents.

3) Before pricing of the foregoing Bills of Quantities, the


tenderer shall visit the site and determine for himself
the nature and conditions of the site and the extent of
itemised works on site. All rates shall allow for this.

4) The Contractor shall allow in his rates for all bulk


excavation works to be carried out as per required
sequence and stages specified in drawings or instructed
otherwise by the Engineer.

5) The Contractor shall ensure no ponding on site during


the course of the work.

6) Rates to include Mobilization and subsequent


demobilization upon completion of all necessary plant,
labour and machineries. Rate is also to include
construction or strengthening of temporary access
routes and working platforms, protection or diversion of
existing services, maintenance and subsequent
reinstatement upon completion.

7) Contractor to submit pre-commencement or record


survey to cover as per built items of topography and
level around working area prior to commencing the
works. The survey works must be endorsed by a licensed
surveyor . This survey will serve as the baseline record
depicting the existing levels/profile. All survey works are
subject to Engineer's instruction and approval.

8) The quantity given is measured nett based on cutting


and filling and the Contractor shall allow in his rate for
increase in bulk.

9) The Contractor shall get clearance from the various


authorities regarding any existing underground cables,
water mains, pipes, etc within the site before
commencement of excavation works. Any costs arising
from the contractor's failure to do so will be borne by
the contractor.

B.Mahsuri - Road Realignment and Main Infra


Section H.2-Infrastructure Works H.2.1/1/9
849.13/Decemberr 2014
Perunding NFL Sdn Bhd

ITEM DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)

TO COLLECTION

ELEMENT NO. H.2.1 - SITE CLEARANCE AND


EARTHWORK (ALL PROVISIONAL)

PACKAGE E1 (CONT'D)

NOTES: (CONT'D)

10) Rock in excavation works:

The volume of the rock excavated shall be taken as its


volume insitu before it is broken up. The volume of rock
on which extra is payable shall be measured and agreed
upon weekly with the Engineer and to Engineer's
approval.

Rock in excavation works shall mean 'Rock' found in


ledges or masses in its original position or artificial
material, which would normally have to be loosened
either by blasting or by pneumatic tools, or if excavated
by hand, by the continued used of wedges and sledge
hammers and in the opinion of the Engineer is incapable
of being loosed with a track-type tractor with mounted
and drawn ripper of the following description:

Tractor Unit: Equipment with a minimum mass of 25


tonnes and nett horse power rating of 350 horsepower,
or more. The tractor unit is to be in good condition and
operated by experienced personnel skilled in the use of
ripping equipment.

Ripping Unit: The ripper to be attached to the tractor


shall be the most efficient parallelogram type
recommended by the tractor or ripper manufacturer.
The ripper shall have a single shank in first class
condition with a sharpened cutting point.

Rock in trench or pit shall not include material which in


the judgement of the Engineer, can be excavated by the
excavator. Only solid boulders or detached pieces of
rock exceeding 1 cubic metre in volume shall be
regarded as rock.

DEMOLISH

A Allow for demolish existing road, kerb, demolish and Item


dismantle existing structure and cart away to
contractor's own dump site, dimantle relocate the
existing services as necessary, diversion of drain and
waterways and any other associated works as approved
and directed by the S.O.

B.Mahsuri - Road Realignment and Main Infra


Section H.2-Infrastructure Works H.2.1/1/10
849.13/Decemberr 2014
Perunding NFL Sdn Bhd

ITEM DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)

TO COLLECTION

ELEMENT NO. H.2.1 - SITE CLEARANCE AND


EARTHWORK (ALL PROVISIONAL)

SECTION 1 (CONT'D)

SITE CLEARANCE

A Clear, remove and dispose off site of all bushes, debris, m2 47,325
roots etc within the works boundary and to contractor's
own dumping area including making all necessary for
disconnection, removal and if necessary the relocation,
diversion or extension of services etc as directed by the
S.O and to the Local Authorities approval

B Stripping of topsoil average depth 150mm and stockpile m2 47,325


for reuse to the location as approved by the S.O.

EARTHWORKS

C Excavate in cuttings or in bulk commencing from existing m3 6,408


ground level to formation level including backfill, deposit
and spread, well compacted of excavated materials in
making up levels or forming embankment, benches,
berms to the slope and levels where directed within the
site as described to the S.O's approval.

D Excavate unsuitable materials below formation in m3 321


cuttings including disposal to Contractor's own dump
site as approved by the S.O.

E Excavate rock in cuttings or in bulk including blasting and m3 321


dispose to Contractor's dump site as approved by the
S.O.

F Import suitable backfilled materials from contractor's m3 19,572


own site, spread to final requisite levels, grades and the
bottom of each layer shall be well treated and
compacted in making up levels and described

TEMPORARY DRAIN

G Temporary earth drain channel overall size (extreme) m 700


600mm x 900mm deep including all necessary
excavation and trimming to forming slopes, close turfing,
forming cascades and bends all as per Engineer's
Drawing LD1/ESCP/DT/2001

B.Mahsuri - Road Realignment and Main Infra


Section H.2-Infrastructure Works H.2.1/1/11
849.13/Decemberr 2014
Perunding NFL Sdn Bhd

ITEM DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)

TO COLLECTION

ELEMENT NO. H.2.1 - SITE CLEARANCE AND


EARTHWORK (ALL PROVISIONAL)

SECTION 1 (CONT'D)

TEMPORARY TRAPEZOIDAL DRAIN

A Temporary trapezoidal shape drain overall size m 395


12000mm width x 2000mm deep (extreme) including
all necessary excavation and trimming to forming slopes,
500mm x 500mm compacted trench backfilled with
soil/sand, complete with geotextile sand filled mattress
all as per Engineer's Drawing No. LD1/ESCP/DT/2001

B Allow for maintenance and desilting of all temporary Item


earth drain, temporary precast concrete drain and
temporary brickwall sump as and when necessary
throughout the construction period as instructed to the
satisfaction and approval of the S.O.

SILT FENCE

C 700mm (minimum) high temporary silt fence m 1,392


constructed of 50mm x 100mm x 1300mm long timber
stakes at 6.0m centres (maximum) and fixed with tie
wires self supporting geotextile including framing
100mm x 150mm deep trench with compacted backfill,
all as per Engineer 's approval and to Drawing No.
LD1/ESCP/DT/2004

D Allow for maintenance, repair and replace as and when Item


necessary of all silt fence throughout the construction
period including remove from site as instructed and to
the satisfaction and approval of the S.O.

CHECK DAM

E No. 14
Construction and completion of check dam for 600mm x
900mm deep temporary earth drain channel (measured
seperately) consisting of aggregate or recycled concrete
with 200mm thick rock trenched including all necessary
excavation and trimming to forming slopes all to S.O's
approval and as per Drawing No.LD1/ESCP/DT/2002

B.Mahsuri - Road Realignment and Main Infra


Section H.2-Infrastructure Works H.2.1/1/12
849.13/Decemberr 2014
Perunding NFL Sdn Bhd

ITEM DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)

TO COLLECTION

ELEMENT NO. H.2.1 - SITE CLEARANCE AND


EARTHWORK (ALL PROVISIONAL)

SECTION 1 (CONT'D)

SEDIMENT BASIN

A Construction and completion of sediment basin overall No. 1


size (extreme) 19.60m x 64.60m x 1.90m depth (Type
SB3) including all necessary excavation and forming
slopes, approved gradded stone aggregate, storage
andsilting zone filter, chamber riser constructed with
600mm diameter x 5mm thick mild steel pipe riser with
5mm thick capping at bottom, 5 rows of 6 nos. of 30mm
diameter holes around the circumference of the pipe at
150mm, 6mm thick metal anti-vortex plate, tack welded
to top of perforated riser with 10mm diameter
reinforcement, brickwork with plastering internally to
hold the pipe riser vertically laid on 1200mm x 1200mm
x 150mm thick reinforced concrete grade 20 slab with a
layer of BRC A7, 50mm thick concrete grade 10 as
described blinding, 600mm diameter class 'X' R.C. pipe
butt ended with collar 500mm long mild steel short
piece with diameter to suit R.C. pipe and welded to pipe
riser, concrete haunching on 150mm thick reinforced
concrete grade 20 slab with a layer of BRC A7, complete
with earth drain and bund consists of suitable earth fill
material to be constructed and compacted in layers with
close turfing to crest and downstream face complete
with reinforced concrete outlet structure, 300mm thick
mortared rip rap lining for 20.0m x 0.45m high
emergency spill way and everything else necessary
including desilting and maintenance as to the
satisfactory and approval of the S.O. as per Drawing
No.LD1/ESCP/DT/2001

B.Mahsuri - Road Realignment and Main Infra


Section H.2-Infrastructure Works H.2.1/1/13
849.13/Decemberr 2014
Perunding NFL Sdn Bhd

ITEM DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)

TO COLLECTION

ELEMENT NO. H.2.1 - SITE CLEARANCE AND


EARTHWORK (ALL PROVISIONAL)

SECTION 1 (CONT'D)

TURFING

A Supply and lay close turfing as described from approved m2 4,842


sources including top soil well watered until well
establish and securing turves with wooden pegs all
subject to the S.O's approval

B Supply and lay spot turfing from approved sources m2 73


including top soil well watered until well establish all
subject to the S.O's approval

Any other items or works not specified above but is


shown on or implied from drawings and/or included in
specifications or are essential for the proper execution
and completion of the works

a) …………………………………………………………

b) …………………………………………………………

c) …………………………………………………………

d) …………………………………………………………

B.Mahsuri - Road Realignment and Main Infra


Section H.2-Infrastructure Works H.2.1/1/14
849.13/Decemberr 2014
Perunding NFL Sdn Bhd

ITEM DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)

TO COLLECTION

ELEMENT NO. H.2.1 - SITE CLEARANCE AND


EARTHWORK (ALL PROVISIONAL)

SECTION 1 (CONT'D)

COLLECTION:

Page No. H.2.1/1/1

Page No. H.2.1/1/2

Page No. H.2.1/1/3

Page No. H.2.1/1/4

Page No. H.2.1/1/5

Page No. H.2.1/1/6

B.Mahsuri - Road Realignment and Main Infra


Section H.2-Infrastructure Works H.2.1/1/15
849.13/Decemberr 2014
Perunding NFL Sdn Bhd

ITEM DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)

TOTAL CARRIED TO SUMMARY

B.Mahsuri - Road Realignment and Main Infra


Section H.2-Infrastructure Works H.2.1/1/16
849.13/Decemberr 2014
Perunding NFL Sdn. Bhd.
.
ITEM DESCRIPTION UNIT QTY RATE (USD) AMOUNT (USD)

SCHEDULE NO. 5 - LANDSCAPING WORKS (ALL


PROVISIONAL)

Notes :

1) This is Provisional quantities Contract subject to


remeasurement.

2) The contract sum be deemed to be complete


and inclusive of all works, whether permanent of
temporary and materials necessary for satisfactory
of the works as infered from drawings, etc. & part A
: Preliminaries

3) For the purpose of valuation of variations, any


omissions/additions to contract sum shall be based
on measured quantities, applying the relevent units
rates or pro-rated unit rates, as the case may be in
accordance with conditions of building contract
annexed here to.

4) The items are not fully descriptive in themselves


and are not mean to limit the scope of works. The
contractor shall fully determine the fully scope of
each item and price accordingly. No claim will be
entertained to the ignorance or lack information.

5) Allow for the production, submission and


approval of all shop drawings by Landscape
Architect. All cost in connection herewith shall be
deemed to be included in Contract Sum.

6) The onus in on Contractor to obtain all necessary


permit/approval from the relevant Statutory
bodies.
7) Allow for the location of hard landscape
structure other than the designated locations
drawings.

8) The contractor shall be deemed to include all


costs involved to providing the structural integrity
of all the hard landscape's structure into the
Contract Sum.

TQTC
Schedule No.5 - Landscaping Works S5/17
854.14/NEA/April 2015
Perunding NFL Sdn. Bhd.
.
ITEM DESCRIPTION UNIT QTY RATE (USD) AMOUNT (USD)

TO COLLECTION

SCHEDULE NO. 5 - LANDSCAPING WORKS (ALL


PROVISIONAL) (CONT'D)

Notes :

9) The contractor is liased closely with contractors


like for example road and drainage contractor for
the interfacing works.

10) The contractor shall allow for minor site


clearing and minor earthwork i.e. shaping, minor
earth grading etc.

SOFTSCAPE WORKS

Site clearance and land preparation insurance,


mobilisation, survey setting out and water supply.
Supply, install and plant trees, palms, shrubs and
turf to the site delivery to point, including watering
and other works does not detailed but necessary
when directed by S.O.

Trees
Dwg Ref : TQ-TQTC-A-23-3019-0001
A Corylus Colurna/Turkish Filbert No.
t.hk - 2.5m/t.dia - 50mm

B Vachellia Nilotica/Acacia Arabica No.


t.hk - 2.5m/t.dia - 50mm

Palms
Dwg Ref : TQ-TQTC-A-23-3019-0001
C Pheonix Dactylifera/Date Palm No.
t.hk - 2.0m/t.dia - 50mm

Shrubs and Groundcover


Dwg Ref : TQ-TQTC-A-23-3019-0001
D Acanthophyllum Squarrosum/Weak-leaf Yucca No.
t.hk - 2.5m/t.dia - 20mm

E Amaranthus Paniculatus/Autumn Palette No.


t.hk - 0.5m/t.dia - 0.4m

F Calamintha Graveolens/Camwood No.


TQTC
Schedule No.5 - Landscaping Works S5/18
854.14/NEA/April 2015
Perunding NFL Sdn. Bhd.
.
ITEM DESCRIPTION UNIT QTY RATE (USD) AMOUNT (USD)
t.hk - 0.5m/t.dia - 0.4m

TO COLLECTION

SCHEDULE NO. 5 - LANDSCAPING WORKS (ALL


PROVISIONAL) (CONT'D)

SOFTSCAPE WORKS (CONT'D)

Planting Hole

Excavate and prepare planting holes/bed including


labour, equipments, tools and cart away excavated
materials/soil from the site.

A Trees and Palms ( 1m x 1m x 1m) No.

B Shrubs (0.3m x 0.3m x 0.3m) No.

Soil Mixture

To supply all labour, equipment, tools, transport


and mixed top soil as directed by 3:2:1 (3 parts rich
top soil, 2 parts of sand and 1 part of organic
fertilizer) to fill excavated holes.

C Trees and Palms ( 1m x 1m x 1m) No.

D Shrubs (0.3m x 0.3m x 0.3m) No.

Staking

Supply all labour, materials etc. to provide stakes


and ties for the followings :

E Trees
Minimum staking size : 40mm x 40mm x 2.5m No.
(2 number for each tree with wire and rubber hose)

F Palms
Minimum staking size : 50mm x 50mm x 3m No.
(3 number for each palm with gunny sack wrapped
at upper trunk)

TO COLLECTION

TQTC
Schedule No.5 - Landscaping Works S5/19
854.14/NEA/April 2015
Perunding NFL Sdn. Bhd.
.
ITEM DESCRIPTION UNIT QTY RATE (USD) AMOUNT (USD)
SCHEDULE NO. 5 - LANDSCAPING WORKS (ALL
PROVISIONAL) (CONT'D)

SOFTSCAPE WORKS (CONT'D)

Turfing (Zoysia)
Dwg Ref : TQ-TQTC-A-23-3019-0001

Supply and planting equipment, tools and transport


for the followings :
A 50mm Thick top soil m2

B Zoysia Matrella (close turfing) m2

MAINTENANCE
Dwg Ref : TQ-TQTC-A-23-3019-0001
The maintenance are not inclusive of hardscape
works. During the maintenance period, the
Contractor are required to replace any dying or
vandalized plants as per contract and to original
condition

C Maintenance for softscape works Month

TO COLLECTION

SCHEDULE NO. 5 - LANDSCAPING WORKS (ALL


PROVISIONAL) (CONT'D)

HARDSCAPE WORKS

Concrete Imprint
Dwg Ref : TQ-TQTC-A-23-3019-0001
A To construct 100mm thick concrete imprint Grade m2
25 complete with a layer of BRC A8, dry shake
colour hardener at the rate 1kg/m2, color releaser
at 0.1-0.13kg/m2 and emboss to require pattern,
sealing with 1 coat sealer at 3-3.5m2/litre with and
including all necessary excavation and sawn
formwork all to Landscape Architect approval and
as shown in drawing.

Crushed Stone
Dwg Ref : TQ-TQTC-A-23-3019-0001

TQTC
Schedule No.5 - Landscaping Works S5/20
854.14/NEA/April 2015
Perunding NFL Sdn. Bhd.
.
ITEM DESCRIPTION UNIT QTY RATE (USD) AMOUNT (USD)
B 100mm thick crushed stone (30mm - 50mm m2
diameter) in blue grey colour laid on top of plastic
mesh all as per Landscape Architect approval and
as shown in the drawing.

C Ditto in red brown colour ditto m2

D Ditto in light grey colour ditto m2

Concrete Slab
Dwg Ref : TQ-TQTC-A-23-3019-0001
E 2000mm x 2000mm x 100mm Thick precast No.
concrete slab laid to pattern all to Landscape
Architect approval.

F 500mm x 2000mm x 100mm Thick ditto No.

Benches
Dwg Ref : TQ-TQTC-A-23-3019-0001
G To construct and install 450mm x 3000mm x No.
400mm with 100mm thick mass concrete base
complete with BRC A6 reinforcement all to
Landscape Architect approval and as shown in
drawing.

TO COLLECTION

SCHEDULE NO. 5 - LANDSCAPING WORKS (ALL


PROVISIONAL) (CONT'D)

HARDSCAPE WORKS (CONT'D)

Tap Point
Dwg Ref : TQ-TQTC-A-23-3019-0001
A To construct, lay and install sub-water pipe from No.
main water supply to water tap point, 650mm
height complete with painted finish including
150mm concrete post with granolithic finish and
BRC A6 reinforcement and all necessary works to
Landscape Architect approval and as shown in
drawing.

Lighting
Dwg Ref : TQ-TQTC-A-23-3019-0001

TQTC
Schedule No.5 - Landscaping Works S5/21
854.14/NEA/April 2015
Perunding NFL Sdn. Bhd.
.
ITEM DESCRIPTION UNIT QTY RATE (USD) AMOUNT (USD)

All design for lighting fitting and coloum shall follow


and approved by Landscape Architect. All outdoor
light shall from wheather proof, anti corrosive type
with manufacturer warranty. The price shall include
installation, concrete footing and other accessories
if required.

B No.
To supply and install up light cast aluminium with
tempered glass and rubber gasket including
stainless steel fixing to aluminium component all to
Landscape Architect approval and as shown in in
drawing.

TO COLLECTION

TQTC
Schedule No.5 - Landscaping Works S5/22
854.14/NEA/April 2015