You are on page 1of 2

Portal RATOL & Rates PreMo

CAWANGAN KONTRAK DAN UKUR BAHAN 02.01.2019

Work Item Unit Overall Average (RM)


TURFING AND SOFT LANDSCAPING m2 Location Range (RM) Average (RM) RM 4.75
SEEDING AND TURFING
A 1.50 - 4.00 3.23
Close Turfing
150mm x 150mm Turves as specified obtained from C 2.00 - 2.00 2.00
Contractor's own source; trimming, levelling and E 7.50 - 7.50 7.50
grading surfaces; 50mm thick top soil as specified,
watering and tendering until well established; replacing F 3.00 - 3.00 3.00
badly grow turves H 8.00 - 8.00 8.00
To flat ground

1/2
Portal RATOL & Rates PreMo
CAWANGAN KONTRAK DAN UKUR BAHAN 02.01.2019

Nota Catatan
Sekiranya anda mempunyai sebarang pertanyaan, sila hubungi:
Ketua Penolong Pengarah Kanan
Bahagian Perolehan dan Khidmat Kos
Cawangan Kontrak dan Ukur Bahan
Ibu Pejabat JKR Malaysia
Tingkat 19, Menara Tun Ismail Mohamed Ali
No 25, Jalan Raja Laut
50582 Kuala Lumpur

u.p: En Husnan Husin


Tel: 03-26161111
Email: husnan@jkr.gov.my

2/2

You might also like