You are on page 1of 1

BEARING DETAIL OF ROAD

BIJAPUR SIDE
SITE PLAN
LINE F.B
LENGTH D/S
IN M
O-A1 18.00
A1-a 2.00
a-b 20.00
b-c 20.00
c-d 20.00
d-e 20.00 LAND ACQUSITION& FOREST CASE
Side
e-f 20.00 ur TOTAL
f-g 20.00 alp NAME INDEX - DETAIL REQUIRED
gd LAND
g-h 20.00 Ja
GOVT.AVAILABLE LAND
h-i 20.00 CENTER TO (ONE SIDE) 22.5 METER
i-j 20.00 i

j-k 20.00 PROPOSED


FOREST LAND
4 m. width (Av) 4X270 =
APPROACHE 1080 sqm
h
k-l 20.00 R4'
19
JAGDALPUR SIDE g

O-A2 18.00 TREE CUTTING -


f
15 NOS
A2-a' 2.00
a'-b' 20.00
d
b'-c' 20.00 R3'

c'-d' 20.00
c
d'-e' 20.00
e'-f' 20.00
ING U/S
IST E
b
f'-g 20.00 R2'
a EX IDG
g'-h 20.00 A2 B R R3

ED
R1' R2
OS E
7.00 m
OP
0
5.0 m
PR RIDG
B A1 R1
a'
GOVERNMENT LAND 22.5 M .

U/S
PROPOSED LAND4M.

LENGTH c'
LINE F.B
IN M
d'
O-R1 90.00
R1-R2 180.00 e'

R2-R3 140.00 AR
GH f'
D/S
g'
O-R'1 50.00
R'1-R'2 45.00 h'

R'2-R'3 75.00
i'
R'3-R'4 50.00
R'4-R'5 105.00 j' S.D.O. E.E. S.E.
k'
OFFICE OF THE EXECUTTIVE ENGINEER
P.W.D. NATIONAL HIGHWEY DIVISION, JAGDALPUR, (C.G.)
l'

AR PROJECT :- CONSTRUCTION OF OF HIGH LEVEL BRIDGE


de GH
Si ACROSS BARDELA NALA IN KM. 372.050 ON
pur
B ija NH-63 ROAD.

TITLE :- SITE PLAN


BRIDGE ALIGNMENT
SKEW 17 DRG NO. :- DATE :-