Assignment
Assignment
Assignment
On
Prepared By:
Name Department Designation
Pillar-1: Sort
Step 1: Trainee from one individual floor/section will work as a core team. Please list down
their name. If possible select one team leader. Though there is team leader but all have to
contribute as a team.
Step 2: Specify the area where you lunch the 5S project. Prepare a plat how the team works.
For example the responsibility of individual and responsibility of a group from team.
Step 3: Identify potentially unneeded items in the area through rag tagging project. Select Red
Tag Area (Concrete/Hypothetical)
Step 3: Accumulation of unneeded items in Red Tag Area. Make concreter or hypothetical
decision about Red Tag items.
Pillar-2: Set-In-Order
Step 1: Consider(concrete or hypothetical) Trolleys, storage racks, Waste bins, Fork lift
trucks, Vehicles etc.for storing the items.
Step 2: Visual Presentation(concrete or hypothetical) of the storing place and section floor
(Working areas, Aisles and others)
Pillar-: Shine
Step 01: List down the sweeper name and instruct them to work on Inventory items,
equipment and space.
Step 03:
Set aside times for the shine activities so that they eventually become a natural part of the
workday.
Cleaning Time
activates
ABC 1 2 3 4 5 6 7 8
ABC 1
ABC 2
Fix time for machine cleaning activates (alarm/song/soft music)
Step 04: Specify area for cleaning tools so that it is easy to find, use and return. If needed
discuss with maintenance dept.
Pillar-4: STANDARDIZE
Assign 3S responsibilities
For example:
Pillar-5: SUSTAIN
Structure: Why support from top management is crucial issue to implement 5S.
Rewards & recognition: Is there need rewards for 5S team member and why?