Spring Straps Mesin Tutup Kayu
Kaca bar Buckle mesin
kulit jam 40 x 5 x 4 cm
Q=2 jam 5 x 5 x 5 cm
5' Pemotongan
0-1
5% CNC
10' Penghalusan
0-2
1% Amplas
10' Pembuatan
lubang Pin Strap
0-3
10% Bor
5' Pengecatan
0-4
Mesin Cat
5%
10' Pengeringan
0-5
0% Mesin Open
10'
0-6 Assembly
5%
Ringkasan
Kegiatan Jumlah Waktu (m)
6 50 menit
1
1
Total 8
Scrapt Fabrikasi
𝐷
𝐷𝑖𝑠𝑖𝑎𝑝𝑘𝑎𝑛 =
1 − 𝑆𝑐𝑟𝑎𝑝𝑡 %
0–6
100
= 𝟏𝟎𝟓. 𝟐𝟔
1 − 5%
0–5
105.26
= 𝟏𝟎𝟓. 𝟐𝟔
1 − 0%
0–4
105.26
= 𝟏𝟏𝟎. 𝟖
1 − 5%
0–3
110.8
= 𝟏𝟐𝟑. 𝟏𝟏
1 − 10%
0–2
123.11
= 𝟏𝟐𝟑. 𝟑𝟓
1 − 1%
0–1
123.11
= 𝟏𝟐𝟗. 𝟖𝟒 = 𝟏𝟑𝟎
1 − 5%
𝑼𝒌𝒖𝒓𝒂𝒏 𝒕𝒆𝒓𝒊𝒎𝒂 𝟒𝟎 𝒄𝒎 × 𝟓 𝒄𝒎 × 𝟒 𝒄𝒎
= = 𝟖 𝒃𝒖𝒂𝒉
𝒖𝒌𝒖𝒓𝒂𝒏 𝒑𝒂𝒌𝒂𝒊 𝟓 𝒄𝒎 × 𝟓 𝒄𝒎 × 𝟒 𝒄𝒎
𝐻𝑎𝑠𝑖𝑙 𝑆𝑐𝑟𝑎𝑝𝑡 130
= = 16.25 = 17 𝑏𝑢𝑎ℎ
8 𝑏𝑢𝑎ℎ 8
Perhitungan pcs/minggu
1 hari = 8 jam
8 jam x 5 hari = 40
𝟒𝟎 × 𝟏𝟕 = 𝟔𝟖𝟎 𝒃𝒖𝒂𝒉 /𝒎𝒊𝒏𝒈𝒈𝒖