(CONSTRUCTION OF ELEVATED CORRIDOR, KORAMANGALA, BANGALORE Client: Bruhat Bengaluru
Mahanagara Palike.
Project: Proposed Elevated Corridor, Koramangala, Bangalore
Tile: Pile Termination Criteria in intermediate Geo Material
Introduction
‘The Pile termination based on the Chiseling criteria, as per IRC: 78-2014, Appendix 9, Method 2 has
been worked out different strata below. Apart from resting the pile into hard strata, also its ensured
‘minimum embedment of pile into the strata with N>100,
Data:
Diameter of Pile 12m
Cross sectional Area of Pile (A): 1.130973 Sam
Pile Capacity recommended in soll Report 580 Mt
Estimated Load On Pile 520 Mt
‘Weight OF Chisel (W) 3.6 Mt
Height of Drop (h) 15 Mt
(As per Site data, time required for 900 Blows is 1
Number of Blows (n) 900 hour)
Efficiency 75%
Reference: IRC:78-2014, Appendi-9 and Appendix-10
‘As per Appendix, Pile Capacity is given by,
Untimate Pile Capacity= cr ResRat
End Bearing Component Re: Cub*NerAb
Nez 9
Cub and Cus= Shear Strength, based on N Value, as per table below-
shear
strength/co
lnsistancy [Moderately Weak Weak _|Very Weak
value |300:200 [200-100 [100-60
[shear
[strength/co
hession [3.34.9 907 |o704
"For Socket Length, ultimate shear strength is limited to 3 Mpa, Also, top 0.3m not
accounted for calculating socket resistance.
Shaft Resistance Raf= —Cusas,
Fos. For End Bearing 3
For Shaft Resistance 6
safe Re/3+Rat/6
‘As per Appendix-10, Pile Penetration Ratio (PPR)
Pk Wwhn/aP
Considering 75% Efficiency,
Pr 0.75"Wwhn/AP
(Case-1: Termination into Strata with penetration value of, 10cm
Embedment into strata with N>100 12m
PPR 322.2888 Trn/sqmfem
From Appendix -10, oma BP ay
0.747
Cub at Base= 3.3 Mpa 330 Mt/Sqm
Cus along Shaft= 0.7 Mpa 70 Me/Sqm
Re: 358.991 Mt
sat 119.664 Mt
Also, as per note 2 under method-2, restricting end bearing component to SMpa ( 500 T/Sqm)
Re)safe= 565.4867 Mt
Raf)Utimate 237.5004
Raf}sat 39.58407 Mt
Pile Capacity= 605.0707 Mt
Say 600 Mt
a ination in wit ation value of 125 em
Contractor - M/s SIMPLEX INFRASTRUCTURES
umiTED‘CONSTRUCTION OF ELEVATED CORRIDOR, KORAMANGALA, BANGALORE Client: Bruhat Bengaluru
‘Mahanagara Palike.
Embedment into strata with N>100 2m
PPR 287.831 Tm/sqm/em
From Appendix -10,N 257.831 nee
0.747
Cub at Ba 3.3 Mpa 330 my/sqm
Cus along shaft= 0.7 Mpa 70 mu/sam
Re 358.991 Mt
Reafe= 119.664 Mt
Also, as per note 2 under method-2, restricting end bearing component to SMpa (500 T/Sarn)
Re)safe= 565.4867 Mt
Raf)Ulimate 448.6194
Raf)Safes 74.76991 Mt
Pile Capacity= 640.2566 Mt
Say 600 mit
(Case-3: Termination into Strata with penetration value of 15cm
‘Embedment into strata with N>100 25m
PPR 214.8592 Tm/sam/em
From Appendix -10, N= 214.8592
a 287.6238
cub at Base= 3.118 Mpa 311.8 m/Sqm
Cus along Sha 0.7 Mpa 70 mt/sqm
e= 3173.737 Mt
Reafe= 1057912 Mt
‘Aso, as per note 2 under method-2, restricting end bearing component to SMpa (S007/Sqrn)
Resafe= 565.4857 Mt
Raf)Ukimate 580.5653
Raf)Safe= 96.76105 Mt
Pile Capacity= 662.2877 Mt
Say 600 Mt
Note:
1. To ensure proper seating into termination strata, minimum 2700 biows shall be given
2. penetration is more than as specified in the above criteria further boring to be continued tll the criteria is met.
3. PPR corresponding to N>/=100 is 74.7 Mt/m/em
Accordingly, the penetration crteriais 43.1441 Say 40cm
Contractor - M/s SIMPLEX INFRASTRUCTURES
umireD M/s Nagesh Consultants