You are on page 1of 2
(CONSTRUCTION OF ELEVATED CORRIDOR, KORAMANGALA, BANGALORE Client: Bruhat Bengaluru Mahanagara Palike. Project: Proposed Elevated Corridor, Koramangala, Bangalore Tile: Pile Termination Criteria in intermediate Geo Material Introduction ‘The Pile termination based on the Chiseling criteria, as per IRC: 78-2014, Appendix 9, Method 2 has been worked out different strata below. Apart from resting the pile into hard strata, also its ensured ‘minimum embedment of pile into the strata with N>100, Data: Diameter of Pile 12m Cross sectional Area of Pile (A): 1.130973 Sam Pile Capacity recommended in soll Report 580 Mt Estimated Load On Pile 520 Mt ‘Weight OF Chisel (W) 3.6 Mt Height of Drop (h) 15 Mt (As per Site data, time required for 900 Blows is 1 Number of Blows (n) 900 hour) Efficiency 75% Reference: IRC:78-2014, Appendi-9 and Appendix-10 ‘As per Appendix, Pile Capacity is given by, Untimate Pile Capacity= cr ResRat End Bearing Component Re: Cub*NerAb Nez 9 Cub and Cus= Shear Strength, based on N Value, as per table below- shear strength/co lnsistancy [Moderately Weak Weak _|Very Weak value |300:200 [200-100 [100-60 [shear [strength/co hession [3.34.9 907 |o704 "For Socket Length, ultimate shear strength is limited to 3 Mpa, Also, top 0.3m not accounted for calculating socket resistance. Shaft Resistance Raf= —Cusas, Fos. For End Bearing 3 For Shaft Resistance 6 safe Re/3+Rat/6 ‘As per Appendix-10, Pile Penetration Ratio (PPR) Pk Wwhn/aP Considering 75% Efficiency, Pr 0.75"Wwhn/AP (Case-1: Termination into Strata with penetration value of, 10cm Embedment into strata with N>100 12m PPR 322.2888 Trn/sqmfem From Appendix -10, oma BP ay 0.747 Cub at Base= 3.3 Mpa 330 Mt/Sqm Cus along Shaft= 0.7 Mpa 70 Me/Sqm Re: 358.991 Mt sat 119.664 Mt Also, as per note 2 under method-2, restricting end bearing component to SMpa ( 500 T/Sqm) Re)safe= 565.4867 Mt Raf)Utimate 237.5004 Raf}sat 39.58407 Mt Pile Capacity= 605.0707 Mt Say 600 Mt a ination in wit ation value of 125 em Contractor - M/s SIMPLEX INFRASTRUCTURES umiTED ‘CONSTRUCTION OF ELEVATED CORRIDOR, KORAMANGALA, BANGALORE Client: Bruhat Bengaluru ‘Mahanagara Palike. Embedment into strata with N>100 2m PPR 287.831 Tm/sqm/em From Appendix -10,N 257.831 nee 0.747 Cub at Ba 3.3 Mpa 330 my/sqm Cus along shaft= 0.7 Mpa 70 mu/sam Re 358.991 Mt Reafe= 119.664 Mt Also, as per note 2 under method-2, restricting end bearing component to SMpa (500 T/Sarn) Re)safe= 565.4867 Mt Raf)Ulimate 448.6194 Raf)Safes 74.76991 Mt Pile Capacity= 640.2566 Mt Say 600 mit (Case-3: Termination into Strata with penetration value of 15cm ‘Embedment into strata with N>100 25m PPR 214.8592 Tm/sam/em From Appendix -10, N= 214.8592 a 287.6238 cub at Base= 3.118 Mpa 311.8 m/Sqm Cus along Sha 0.7 Mpa 70 mt/sqm e= 3173.737 Mt Reafe= 1057912 Mt ‘Aso, as per note 2 under method-2, restricting end bearing component to SMpa (S007/Sqrn) Resafe= 565.4857 Mt Raf)Ukimate 580.5653 Raf)Safe= 96.76105 Mt Pile Capacity= 662.2877 Mt Say 600 Mt Note: 1. To ensure proper seating into termination strata, minimum 2700 biows shall be given 2. penetration is more than as specified in the above criteria further boring to be continued tll the criteria is met. 3. PPR corresponding to N>/=100 is 74.7 Mt/m/em Accordingly, the penetration crteriais 43.1441 Say 40cm Contractor - M/s SIMPLEX INFRASTRUCTURES umireD M/s Nagesh Consultants

You might also like