Phase II
Picture 1 & 2: Witnessing of BP46A/04 Pile Termination and Measuring Depth of Pile.
Picture 3: Pile BP46A/03 Pile register details.
Picture 4: Rock Penetration test format – 900 blows.
Picture 5: Pile Termination Criteria, BMRCL Technical note.
Inspected by Independent Quality Monitoring Consultant Team
Page 1 of 4
Picture 1 & 2. Witnessing of BP46A/03 Pile Termination and Measuring Depth of Pile.
Page 2 of 4
Picture 3. Pile BP46A/03 Pile register details.
Page 3 of 4
Picture 4. Rock Penetration Test Format – 900 blows. Picture 5. Pile Termination Criteria.
Page 4 of 4