Applied Planning & Infrastructure, Inc. (APII) is a Philippine registered corporation, formerly known as The Louis Berger Group Phils., Inc.    APII
provides professional services to public and private clients tailored to their requirements.  We undertake subcontracts to complete technical 
scopes of work and prime contracts to manage projects and programs. We also recruit and assign technical and management personnel 
integrated into client's teams.  With over 25 years experience APII has executed a diverse portfolio of Philippine economic growth, master 
planning, feasibility study, transport engineering, and rural development contracts funded by USAID, The World Bank, The Asian Development 
Bank, JICA and private firms. APII's management team brings extensive Philippine experience, particularly in Mindanao, a team of expat and 
Filipino professionals who have successfully worked together, and linkages to global organizations with specialized expertise.  

Clients have included the Office of the President, Subic Bay Metropolitan Authority, Clark Development Corporation, Light Rail Transit Authority, 
Pueblo De Oro Corporation, San Miguel Corporation, the Supreme Court of the Philippines, Sagittarius Mines, Inc. and many other private and 
public sector organizations. APII's team have participated in and managed many of the largest development programs financed by the US 
Government in the Philippines such as the Rural Infrastructure Fund, the Economic Support Fund Secretariat, The Philippine Assistance Program 
Support fund, and the Growth with Equity in Mindanao Program. 

Experience in Feasibility Study, Master Planning and Transport Engineering 

Master Plan 
Master Plans are more than an inventory of site conditions and concepts for future growth. To attract investment, they must also reflect a shared 
planning vision and development parameters agreed‐to by the owners, key stakeholders, regulators and investors. Thus, our Applied Planning 
methodology starts with open communication; "asking", "listening" and "dialogue" focused on solutions. In the process of arriving at a shared 
vision and planning parameters, we also work to develop an organizational, operational, administrative, regulatory, and policy framework to 
execute the Master Plan. This shared approach to plan conceptualization ensures: 

 the plan to be developed will be stakeholder‐based and sustainable as commitment will be ensured through "ownership" of the project 
concepts; and  
 the plan will be implementable as it will be based on a viable framework agreed upon by the players themselves  

Our Master Plans are characterized by insightful SWOT analysis and recommendations based on demand and market analysis, physical 
assessment of the site, transport planning, land use alternatives, economic and cost analysis, environmental and utility infrastructure, work‐life 
balance amenities, among many factors. Our Masterplans seek to create consensus ‐ a 'way forward' to meet the investment expectations of 
owners, stakeholders, regulators, and investors. Our master plans are used by all the concerned parties to achieve a common vision, and evolve 
with the owner's growth; they are not static reference documents. 

Financial and Business Plan 
A diagnostic review of operations focuses on the three financial statements ‐ Balance Sheet, Income Statement and Cash Flow Statement ‐ and 
Regulatory Compliance. The resulting set of conclusions are used as references for project undertakings, and are the basis of institutional and 
staff capability building. 
Our business planners prepare a financial model to help determine the expected level of funding, profitability and value of the enterprise and sub‐
projects within it. More specifically, we: 

 Gather all relevant assumptions that will be used in the preparation of a financial model per transaction. We will review the reasonableness 
of these assumptions based on information provided by owners, as well as information from publicly available sources; 
 Assist in the conduct of a limited sensitivity analysis to assess the financial boundaries of the Transaction with special focus on determining 
the appropriate cash flows; 
 Review and provide comments on the computation of relevant financial performance measures such as Internal Rate of Return ("IRR"), 
Payback, Return on Investment ("ROI"), Debt Service Coverage Ratio ("DSCR"), as well as others as required; and With the assistance of a Tax 
Consultant, validate the tax assumptions used in the financial model prepared. 

APII provides infrastructure planning and technical support services: 

 Geographic Information Systems; 
 CAD drawings; 
 Construction inspection and supervision; 
 Specifications and Bid Document Preparation; 
 Site Assessment; 
 Economic analysis; 
 Traffic demand; 
 
We have worked on a diverse range of transportation projects (roads, urban rail, seaport, and airports) as well community infrastructure in 
partnership with local government units and donors. Most recently we have completed a business case analysis to establish the Manila Central 
Subway system for consideration by private PPP investors and a Survey of Mindanao Logistics Infrastructure which helped DPWH substantially 
expand Mindanao's road network using its General Appropriations Act funding in 2016/17.    

We have planned and supervised construction of over 1,000 infrastructure facilities in the conflict affected areas of Mindanao to stimulate 
community development and economic growth. We were early pioneers in development of the nation's PPP program with our SLEX study leading 
to the Philippine's first BOT investment. We have executed follow‐up assignments for both DOTC and LRTA leading to expansion of the nation's 
transport system, most recently providing electromechanical engineering expertise to DOTC and its Japanese program manager to expand 
Line1/Line2 capacity in Metro Manila. 
 
Experience in Environmental Assessment 

APII's management team are leading proponents of environmentally sustainable development, having a long history dating back to 1995 in the 
Philippines when it was awarded the prestigious "Gawad Kalikasan" by DENR and the Philippine Association of Environmental Professionals for the  Gawad Kalikasan Award
"Best EIA of the Decade". More recently, and for the past 18 years, we've managed the environmentally sustainable design, construction, and  for the
concurrently regulatory approval processes, for over 1,000 infrastructure construction projects funded by USAID/GEM throughout the Southern  Most Outstanding
Philippines including bridges, roads, airports, water supply, market centers and other facilities.   Environmental Impact
Study of the decade
By bringing together Stakeholders and Authorities in a consultative atmosphere, we develop an ongoing dialogue with and among them which  by DENR and the
allows all points of view and inputs to be considered. The evaluations performed, not only consider existing natural resources within an area, but 
Philippine Association of
also determine environmental trends and the social soundness of a project. By seeking the views of people which may benefit or be impacted by a 
Environmental Assessment
proposed project, we help to dissipate apprehension which may arise from perceived social or environmental impacts. This is done by developing 
Professionals
alternative programs to mitigate and monitor for actual problems early in the program. 

A close working relationship has developed over the years among the Environmental Management Bureau (EMB) of the Department of 
Environment and Natural Resources (DENR). This relationship has provided a free exchange of ideas and information with regards to evolving needs 
and regulations, particularly the framework for implementation of the environmental impact assessment system. 
 
IABC Gold Quill Award of Merit
Growth with Equity in Mindanao
Program (GEM)
Communication Team
Applied Planning & Infrastructure, Inc. (APII)
Project Experience – Ongoing and Completed
Value of Date
Project APII Date Started
Project Title Location Client Type of Services Rendered Services Completed
No. Role (mm/dd/yyyy)
(in US$) (mm/dd/yyyy)
PH124 Household Census and Asset Survey – Province of Cardno Emerging  Census and Asset Survey Prime 125,900 02/02/2017 06/24/2017
500MW Wawa Pumped-Storage Rizal, Markets (Philippines)  Technical Assistance and Advisory
Hydropower Project Philippines Pty., Ltd. (Cardno)
Ultimate Client:
Olympia Violago Water
and Power, Inc. (OVPI)
PH123 Logistics, Secretarial and Documentation Province of Cardno Emerging  Documentation and recording of Community Prime 37,000 01/30/2017 04/30/2017
Contractor – 500MW Wawa Pumped- Rizal, Markets (Philippines) Meetings/Consultations
Storage Hydropower Project Philippines Pty., Ltd. (Cardno)  Production of communication products
Ultimate Client:  Management of logistics to deliver remote
Olympia Violago Water events
and Power, Inc. (OVPI)
PH121 Capacity Enhancement of Mass Transit Metro Manila Sub to Katahira  Preparation of Performance Specifications Sub 1,907,467 02/01/2015 04/30/2020
Systems in Metro Manila Project (Manila Engineers Inc. and Parameters
Light Rail Transit Line 1 – South (Cavite) Ultimate Client:  Construction/Technical Supervision
Extension & Line 2 – East (Masinag) JICA/Department of  Assistance in Bidding
Extension Projects) Transportation and  Review of the Systems Engineering and
Communication (DOTC) Operations
PH122 Manila Central Subway Business Case Metro Manila Applied Planning and  Traffic Study Prime Confidential 07/01/2012 06/30/2015
Infrastructure, Inc.  Financial Analysis
(APII)  Economic Studies
 Engineering Concept Design
 Geographic Information System (GIS)
PH120 Plaridel Bypass Tollroad Project Plaridel, International Technical  Feasibility Studies Sub 64,962 01/05/2015 04/16/2016
Bulacan Assistance Consultants  Environmental Impact Assessment
(ITAC Spain)  Preparation of Tender/Bidding Documents
Ultimate Client: PPP  Design Review
Center/ADB  Technical Assistance & Advisory Services
PH119a Survey on Mindanao Logistics Cagayan de Japan International  Market Survey Prime 33,286 06/16/2014 08/31/2014
Infrastructure Network – Supplementary Oro, Davao, Cooperation Agency  Research Study
Works General Santos, (JICA Philippines)  Technical Assistance & Advisory Services
Butuan and
Surigao
PH119 Survey on Mindanao Logistics Cagayan de Japan International  Market Survey Prime 240,000 04/26/2013 03/24/2014
Infrastructure Network Oro, Davao, Cooperation Agency  Research Study
General Santos, (JICA Philippines)  Technical Assistance & Advisory Services
Butuan and
Surigao
PH113 Batong Buhay Livelihood Demonstration Batong Buhay, Makilala Mining  Technical Assistance & Advisory Services Prime 29,762 12/15/2012 03/31/2014
Project Kalinga Apayao Company, Inc.
PH117 Project Control - Scheduler General Santos Sagittarius Mines, Inc.  Planning and Scheduling Prime 32,255 04/22/2013 08/30/2013
and 118 City and Makati
City

| Page 1
Applied Planning & Infrastructure, Inc. Project Experience – Ongoing and Completed

Value of Date
Project APII Date Started
Project Title Location Client Type of Services Rendered Services Completed
No. Role (mm/dd/yyyy)
(in US$) (mm/dd/yyyy)
PH116 SDMP Barangay Data Collection for One Pula Bato, Sagittarius Mines, Inc.  Geographic Information System (GIS) Prime 2,665 03/04/2013 03/12/2013
Barangay Map Tampakan,
General Santos
City
PH115 Improved Information Management and Manila Sagittarius Mines, Inc.  Geographic Information System (GIS) Prime 21,776 03/05/2013 06/30/2013
Reporting System
PH114 FPIC Capacity Building - Region 12 General Santos Sagittarius Mines, Inc.  Technical Assistance Prime 75,763 10/23/2012 04/16/2013
Documentation City
PH112 Documentation and Communication General Santos Sagittarius Mines, Inc.  Technical Assistance Prime 16,010 07/1/2012 03/05/2013
Materials - Off-Lease Infrastructure (OLI) City
PH111 Resettlement – Livelihood & Cultural General Santos Sagittarius Mines, Inc.  Technical Assistance Prime 21,434 05/01/2012 01/09/2013
Support Team City
PH801 Growth with Equity in Mindanao 3 (GEM Mindanao Sub to The Louis  Construction Supervision / Inspection Sub 13,230,037 01/01/2008 12/31/2012
3) Berger Group, Inc. Services
Ultimate Client: U.S.  Economic and Market Studies
Agency for International  Engineering Design
Development (USAID  Institutional
 Procurement / Tender Documents
 Program Management / Construction
Management
 Technical Assistance & Advisory Services
 Training & Transfer of Technology
PH110 Field Consultation Secretariat, Manila and Sagittarius Mines, Inc.  Technical Assistance & Advisory Services Prime 825,488 11/15/2011 10/30/2012
Documentation and Communications General Santos  Training & Transfer of Technology
Support Team City

PH109 Consultancy Services for the Preparation Mariveles, Authority of the Freeport  Economic and Market Studies Prime 160,649 09/05/2011 01/31/2012
of the Freeport Area of Bataan's Bataan Area of Bataan  Financial Services
Developmental Master Plan with Financial  Geographic Information System (GIS)
Plan  Private Sector Preinvestment / Due
Diligence
 Public Sector Preinvestment / Master
Plans
 Technical Assistance & Advisory Services
PH108 Resettlement Livelihood Framework Manila and Sagittarius Mines, Inc.  Geographic Information System (GIS) Prime 102,076 06/01/2011 11/15/2011
Project General Santos  Private Sector Preinvestment /
City Due Diligence
 Project Design, Monitoring & Evaluation
 Technical Assistance & Advisory Services
 Training & Transfer of Technology

| Page 2
Applied Planning & Infrastructure, Inc. Project Experience – Ongoing and Completed

Value of Date
Project APII Date Started
Project Title Location Client Type of Services Rendered Services Completed
No. Role (mm/dd/yyyy)
(in US$) (mm/dd/yyyy)
PH107 Master Planning for the Godofredo P. Malay, Aklan Trans-Aire  Public Sector Preinvestment / Prime 15,098 01/17/2011 04/08/2011
Ramos Airport (Caticlan Airport) Development Holdings Master Plans
Corporation  Private Sector Preinvestment /
Due Diligence
 Surveys / Cadaster
 Technical Assistance & Advisory Services
PH484 Support to the Supreme Court's Manila Manila The World Bank  Environmental Impact Assessment Prime 15,927 06/26/2010 02/2011
Bay Advisory Committee  Management Information System
 Technical Assistance & Advisory Services
 Training & Transfer of Technology
PH450 Growth with Equity in Mindanao 2 (GEM Mindanao Sub to The Louis  Economic and Market Studies Sub 8,786,532 08/15/2002 12/31/2007
2) Berger Group, Inc.  Engineering Design
Ultimate Client: U.S.  Institutional
Agency for International  Program Management / Construction
Development (USAID) Management
 Technical Assistance & Advisory Services
PH106 EDSA North Transit Study Manila Department of  Economic and Market Studies Prime 400,583 11/22/2005 11/30/2006
Transportation and  Environmental Impact Assessment
Communications  Feasibility Studies
 Procurement / Tender Documents
 Public Sector Preinvestment / Master
Plans
 Technical Assistance & Advisory Services
PH105 Intermodal Transport Development Manila, Asian Development  Economic and Market Studies Prime 229,386 07/01/2005 09/21/2006
Palawan Bank  Environmental Impact Assessment
 Feasibility Studies
 Institutional
 Project Design, Monitoring & Evaluation
 Public Sector Preinvestment / Master
Plans
 Surveys / Cadaster
 Technical Assistance & Advisory Services
 Training & Transfer of Technology
PH450A Livelihood Enhancement and Peace - 2 Mindanao Sub to The Louis  Economic and Market Studies Sub 654,600 04/10/2003 12/31/2005
(LEAP 2) Program Berger Group, Inc.  Management & Organization
Ultimate Client: U.S.  Project Design, Monitoring & Evaluation
Agency for International  Technical Assistance & Advisory Services
Development (USAID)  Training & Transfer of Technology
PH104 Detailed Engineering Design and Subic Bay Subic Bay Metropolitan  Construction Supervision / Inspection Sub 25,678 08/04/2003 02/01/2004
Construction Supervision for the Freeport Zone Authority (SBMA) Services
Rehabilitation/Maintenance of Aircraft  Engineering Design
Pavements Project

| Page 3
Applied Planning & Infrastructure, Inc. Project Experience – Ongoing and Completed

Value of Date
Project APII Date Started
Project Title Location Client Type of Services Rendered Services Completed
No. Role (mm/dd/yyyy)
(in US$) (mm/dd/yyyy)
PH439 Livelihood Enhancement and Peace Mindanao Sub to The Louis  Economic and Market Studies Sub 677,735 12/04/2001 09/30/2003
Program 1 (LEAP-1) Berger Group, Inc.  Management & Organization
Ultimate Client: U.S.  Operations and Maintenance
Agency for International  Project Design, Monitoring & Evaluation
Development (USAID)  Technical Assistance & Advisory Services
 Training & Transfer of Technology
PH265 Growth with Equity in Mindanao Program Mindanao Sub to The Louis  Economic and Market Studies Sub 4,457,865 09/01/1995 09/30/2002
(GEM) Berger Group, Inc.  Engineering Design
Ultimate Client: U.S.  Environmental Impact Assessment
Agency for International  Feasibility Studies
Development (USAID)  Financial Services
 Geographic Information System (GIS)
 Institutional
 Management & Organization
 Management Information System
 Private Sector Preinvestment / Due
Diligence
 Project Design, Monitoring & Evaluation
 Public Sector Preinvestment / Master
Plans
 Technical Assistance & Advisory Services
 Training & Transfer of Technology
PH265B SZOPAD Accelerated Enterprise Zamboanga Sub to The Louis  Technical Assistance & Advisory Services Sub 790,000 03/12/1998 09/01/2001
Development (SZAED) City, Mindanao Berger Group, Inc.  Training & Transfer of Technology
Ultimate Client: U.S.
Agency for International
Development (USAID)
PH265C Emergency Livelihood Assistance Mindanao Sub to The Louis  Technical Assistance & Advisory Services Sub 503,812 05/19/1999 07/31/2001
Program - Component II - Growth with Berger Group, Inc.  Training & Transfer of Technology
Equity in Mindanao Program Ultimate Client: U.S.
Agency for International
Development (USAID)
PH103 Subic Bay Area Municipal Development Various Sub to The Louis  Construction Supervision / Inspection Sub 74,811 01/15/1999 11/30/2000
Project Berger Group, Inc. Services
Ultimate Client: Subic  Institutional
Bay Metropolitan  Program Management / Construction
Authority Management
PH204 San Roque Hydroelectric Project San Roque, San Roque Power  Program Management / Construction Prime 9,117 03/08/1999 04/30/1999
Urdaneta, Corporation Management
Pangasinan  Technical Assistance & Advisory Services

| Page 4
Applied Planning & Infrastructure, Inc. Project Experience – Ongoing and Completed

Value of Date
Project APII Date Started
Project Title Location Client Type of Services Rendered Services Completed
No. Role (mm/dd/yyyy)
(in US$) (mm/dd/yyyy)
PH444 Rural Infrastructure Development Project - Zamboanga del Sub to The Louis  Construction Supervision / Inspection Sub 78,662 08/01/1996 08/01/1998
Engineering Component Sur and Norte Berger Group, Inc. Services
Ultimate Client:  Engineering Design
Department of  Procurement / Tender Documents
Agriculture / IADCCO  Program Management / Construction
Management
PH419 Owners Representative Mactan Lapu Lapu City, Lapu Lapu City  Procurement / Tender Documents Prime 98,772 12/01/1997 02/01/1998
Reclamations Project - Phase 1 Mactan, Cebu  Program Management / Construction
Management
 Technical Assistance & Advisory Services
PH457 Detailed Engineering Design of Presidio Iloilo City Armed Forces of the  Engineering Design Prime 221,154 03/01/1997 09/01/1997
Royale Golf and Country Club Philippines - Retirement
& Separation Benefits
System
PH445 Consulting Services for Subic Bay Subic Bay Sub to The Louis  Economic and Market Studies Sub 78,407 12/01/1996 06/01/1997
International Airport Master Plan Freeport Zone Berger Group, Inc.  Public Sector Preinvestment / Master
Ultimate Client: Subic Plans
Bay Metropolitan
Authority
PH443 Development of the Clark Special Clark Field, Sub to The Louis  Economic and Market Studies Sub 137,919 06/01/1996 04/01/1997
Economic Zone Sub-Zone Pampanga Berger Group, Inc.  Public Sector Preinvestment / Master
Ultimate Client: Clark Plans
Development
Corporation
PH455 Wack Wack Golf and Country Club Water Mandaluyong Wack Wack Golf and  Management & Organization Prime 46,154 02/04/1997 03/14/1997
Management Study City Country Club
PH452 Iloilo Housing Estate Water and Manila City Armed Forces of the  Engineering Design Prime 34,615 01/01/1997 03/01/1997
Wastewater Study Area and Iloilo Philippines/Retirement  Feasibility Studies
City & Separation Benefits  Technical Assistance & Advisory Services
System
PH447 Iloilo Housing Estate Flood Protection Iloilo City Sub to The Louis  Engineering Design Sub 31,352 09/1996 01/31/1997
Project Berger Group, Inc.  Feasibility Studies
Ultimate Client:
Government of
Philippines - Armed
Forces of the
Philippines/Retirement
& Separation Benefits
System
PH449 Technical Audit of the South Luzon Luzon Sub to The Louis  Economic and Market Studies Sub 93,600 09/01/1996 12/01/1996
Tollway Traffic and Revenue and Berger Group, Inc.  Feasibility Studies
Environmental Study Ultimate Client:  Financial Services
Hopewell Holdings  Technical Assistance & Advisory Services
Limited

| Page 5
Applied Planning & Infrastructure, Inc. Project Experience – Ongoing and Completed

Value of Date
Project APII Date Started
Project Title Location Client Type of Services Rendered Services Completed
No. Role (mm/dd/yyyy)
(in US$) (mm/dd/yyyy)
PH414 Pueblo de Oro Mixed Use Development Cagayan de Pueblo De Oro  Public Sector Preinvestment / Master Prime 292,745 09/1994 01/31/1996
Master Plan Project Oro City Development Plans
Corp./Regatta
Properties, Inc.
PH418 Construction Supervision for Zuellig Canlubang, Zuellig Pharma  Construction Supervision / Inspection Prime 80,960 04/05/1994 03/05/1995
Warehouse Laguna Corporation Services
 Program Management / Construction
Management

| Page 6
FRONT‐END MINING 

APII works at the front‐end of the mine's development cycle with the people directly affected ‐‐ we provide livelihood program 
planning through analysis of value chains, market opportunities and ecological conditions; resettlement support through formal 
documentation of community consultations, logistics management of field‐based community events and creation of communication 
materials in local dialect. We are fully aware of and support the Free and Prior Informed Consent requirements and procedures 
established by the National Commission for Indigenous Peoples. 

PROJECTS & SAMPLE WORK PRODUCTS 
PROGRAM MANAGEMENT 

APII provides internal control systems and services to plan, roll‐out and manage large field‐based programs. We support our client's 
on‐the‐ground, transparently managing their resources to implement activities with stakeholders in accordance with their policies and 
directions. We offer two decades of sustainable development experience and lessons‐learned from managing several of the Philippines 
largest developmental undertakings. We have operated in remote, hostile and difficult environments managing donor agency and 
private funds to deliver a diverse range of economic growth, workforce preparation, public communications and other activities. We 
have successfully managed program implementation over two decades in accordance with the strictest international standards of 
integrity and performance. 

PROJECTS & SAMPLE WORK PRODUCTS 
ECONOMIC GROWTH AND RURAL DEVELOPMENT 

APII provides livelihood, economic growth planning and program implementation services. We have worked with producers and their 
associations to improve their production capacity as well as with market makers and buyers to source locally produced products. We 
consider value chains and address constraints therein as the focus of our efforts to increase transactions between sellers and buyers. 
Working in rural environments we seek to build relationships between growers, their associations and buyers to establish contract 
growing opportunities and market linkages. We've also designed and established workforce preparation programs in collaboration with 
employers and local Universities. 

PROJECTS & SAMPLE WORK PRODUCTS 
ENGINEERING and TECHNICAL SUPPORT SERVICES  

APII provides infrastructure planning and detailed engineering services for transport systems such as roads, urban rail, seaport, and 
airports as well as services related to the planning and construction of community infrastructure in partnership with local government 
units and donors. We have managed construction of over 800 such infrastructure facilities in the conflict affected areas of Mindanao to 
stimulate economic growth. We were early pioneers in development of the nation's BOT program with our SLEX study leading to the 
nation's first BOT investment, and follow‐up assignments for both DOTC and LRTA leading to expansion of the nation's transport 
system. A team of seven APII engineers are currently working on L1/L2 capacity expansion programs.  

PROJECTS 
APPLIED PLANNING 

APII's approach to master planning is to balance the various objectives of a project by providing alternative development strategies. 
Using various criteria including inputs from our clients and other stakeholders in the project we prepare a technically feasible, 
financially viable, and socially and environmentally sound master plan. The firm recently completed Master Planning assignments for 
the Freeport Authority of Bataan for their 1,600 ha mixed‐use site and San Miguel Corporation's Trans‐Aire Development Holdings 
Corporation for their Caticlan Airport site, the first privatized airport in the country.  

PROJECTS & SAMPLE WORK PRODUCT 
Please contact us anytime. 
 
Applied Planning & Infrastructure, Inc. (APII) 
 
Unit 711, 7/F 1286 Philippine Axa Life Center 
Sen. Gil Puyat corner Tindalo Street 
Makati City, 1200 Philippines 
 
Tel: (632) 812‐1647 
Fax: (632) 812‐5665 
E‐mail: info@apii.com.ph 

Click map to navigate

You might also like