Professional Documents
Culture Documents
Project :
Electrical Consultant :
Tarek M. Zarif, PE, LC
Bill Of Quantity
U/P T/P
Item Description Unit Qty. (EGP)
(EGP)
All items below shall include shop drawings, as-built drawings, manuals, warranty, maintenance and
training as per specs and contract.
GENERAL ITEMS
Total of Page 1
MEP & LS
Lighting the future 1 of 2
PROJECT TITLE: FOUKA BAY
U/P T/P
Item Description Unit Qty. (EGP)
(EGP)
All items below shall include shop drawings, as-built drawings, manuals, warranty, maintenance and
training as per specs and contract.
4 Outdoor Fiber Optic Cabinets:GENERAL ITEMS
Supplying, installing, connecting and testing of outdoor fiber
cabinets that include Cabinet hole under outdoor fiber cabinet,
fiber patch panels, splicing trays, splicing cassettes, optical
splitters, cable organizers, fiber connectors, fiber termination,
fiber pigtails, fixation tools, cables management, labeling...etc.
for smart network. Secured OFC should be with suitable
dimensions to be installed above the Cabinet Hole including all
neccessary accessories and ancillary works and material
required for comelete installations as specified and as indicated
on the design drawings for complete operative system.
Total of Page 2
MEP & LS
Lighting the future 2 of 2