PROJECT TITLE: FOUKA BAY

Owner :
Egyptian Company for Urban Development and Tourism
Investment
‫الشركة المصرية للتنمية العمرانية و الستثمار السياحي‬

Project :

Electrical Consultant :
Tarek M. Zarif, PE, LC

Bill Of Quantity

Low Current Infrastructure -1 of Beach


Date: 17/3/2019 Rev#3

MEP & LS
1 of 2
Lighting the future
PROJECT TITLE: FOUKA BAY

U/P T/P
Item Description Unit Qty.
(EGP) (EGP)
All items below shall include shop drawings, as-built drawings, manuals, warranty, maintenance and
training as per specs and contract.
GENERAL ITEMS

All followings shall be considered in connection with


Low Current works as required by drawings and
specifications for all items in this BOQ.
Excavation and back filling of all below items.
Allow for cable markers and labelling.
Allow for connecting the low current installation to fiber
optic cabinets cabinets.
Allow for providing shop drawings for the entire of low
current works.
Allow for providing as-built for the entire of low current
works.
LOW CURRENT SYSTEM
1 Low Current ManHole:
Supplying, installing and testing Manholes (with cover as per
client specsifications with lock that is totally sealed against dust
and water drain) The item include formwork, reinforcement,
concrete as specified and as indicated on the drawings including
accessories, resizing all necessary and ancillary works for a
complete installation.

1.1 Manhole TYPE#4 600X600X800 MM No. 1

2 Low Current Hand Hole:


Supplying, installing and testing Hand holes (with as per client
specsifications cover with lock that is totally sealed against dust
and water drain) The item include formwork, reinforcement,
concrete as specified and as indicated on the drawings including
accessories, resizing all necessary and ancillary works for a
complete installation.

2.1 Hand Hole TYPE#2 400X400X600 MM No. 16 0

3 Low Current Conduit and Duct bank:

MEP & LS
2 of 2
Lighting the future
PROJECT TITLE: FOUKA BAY

U/P T/P
Item Description Unit Qty.
(EGP) (EGP)
All items below shall include shop drawings, as-built drawings, manuals, warranty, maintenance and
training as per specs and contract.
Supplying, Installing and Testing direct buried thick wall UPVC
ducts and subducts with dimensions of 50mm to fit Manhole/Hand
hole opening dimension. The item includes warning tape,
Spacers, endcap,….etc and all necessary accessories, ancillary
works, marking, labelling, protection and materials required for
complete installation and operation as specified and indicated on
the drawings.

3.1 50 mm UPVC Conduit m 5,000


3.2 25 mm UPVC Conduit m 700
Total of Page 1

MEP & LS
3 of 2
Lighting the future
PROJECT TITLE: FOUKA BAY

U/P T/P
Item Description Unit Qty.
(EGP) (EGP)
All items below shall include shop drawings, as-built drawings, manuals, warranty, maintenance and
training as per specs and contract.
4 Single Mode Fiber Optic Cable:
Supply, install , testing ,commissioning and put into operation
Data system complete with boxes, and all necessary connection
and fixing accessories as per specifications,service provider and
drawings including the following :
0

4.2 2 cores single mode fiber optic cable reinforced m. 4,900

5 Outdoor Fiber Optic Cabinets:


Supplying, installing, connecting and testing of outdoor fiber
cabinets that include Cabinet hole under outdoor fiber cabinet,
fiber patch panels, splicing trays, splicing cassettes, optical
splitters, cable organizers, fiber connectors, fiber termination,
fiber pigtails, fixation tools, cables management, labeling...etc. for
smart network. Secured OFC should be with suitable dimensions
to be installed above the Cabinet Hole including all neccessary
accessories and ancillary works and material required for
comelete installations as specified and as indicated on the design
drawings for complete operative system.

5.1 Outdoor surface mounted fiber optic cabinet in closet of


No. 2
transformer building.
5.2 Smart Splitter as per design 1:32 inside 7U rack No. 2
5.3 closures as per design in manhole No. 1

Happy City Items Units

1 Happy City Items Units for Beach:-

1.1 Installation is included in power BOQ - -

1.2 Fiber Optic end point termination in 20X20 cm weather proof


No. 37
junction box for Happy City Items.

MEP & LS
4 of 2
Lighting the future
PROJECT TITLE: FOUKA BAY

U/P T/P
Item Description Unit Qty.
(EGP) (EGP)
All items below shall include shop drawings, as-built drawings, manuals, warranty, maintenance and
training as per specs and contract.
Total of Page 2

MEP & LS
5 of 2
Lighting the future
PROJECT TITLE: FOUKA BAY

Owner :
Egyptian Company for Urban Development and Tourism
Investment
‫الشركة المصرية للتنمية العمرانية و الستثمار السياحي‬

Project :

Electrical Consultant :
Tarek M. Zarif, PE, LC

Bill Of Quantity

Low Current Infrastructure -3 of Phase 01


Date: 17/3/2019 Rev#3

MEP & LS
6 of 4
Lighting the future
PROJECT TITLE: FOUKA BAY

Item Description Unit Qty. U/P


(EGP)
All items below shall include shop drawings, as-built drawings, manuals, warranty, maintenance and
training as per specs and contract.
GENERAL ITEMS
All followings shall be considered in connection with
Low Current works as required by drawings and
specifications for all items in this BOQ.
Excavation and back filling of all below items.
Allow for cable markers and labelling.
Allow for connecting the low current installation to fiber
optic cabinets cabinets.
Allow for providing shop drawings for the entire of low
current works.
Allow for providing as-built for the entire of low current
works.
LOW CURRENT SYSTEM
1 Low Current Manhole:
Supplying, installing and testing Manholes (with cover as per
client specifications with lock that is totally sealed against dust
and water drain) The item include formwork, reinforcement,
concrete as specified and as indicated on the drawings including
accessories, resizing all necessary and ancillary works for a
complete installation.

1.1 Manhole TYPE#3 1000X1000X1200 MM No. 1


1.2 Manhole TYPE#4 600X600X800 MM No. 81

2 Low Current Hand Hole:


Supplying, installing and testing Hand holes (with as per client
specifications cover with lock that is totally sealed against dust
and water drain) The item include formwork, reinforcement,
concrete as specified and as indicated on the drawings including
accessories, resizing all necessary and ancillary works for a
complete installation.

2.1 Hand Hole TYPE#2 400X400X600 MM No. 75


2.2 Hand Hole TYPE#3 200X400X300 MM No. 41

3 Low Current Conduit and Duct bank:


Supplying, Installing and Testing direct buried thick wall UPVC
ducts and subducts with dimensions of 50mm to fit Manhole/Hand
hole opening dimension. The item includes warning tape,
Spacers, endcap,….etc and all necessary accessories, ancillary
works, marking, labelling, protection and materials required for
complete installation and operation as specified and indicated on
the drawings.

3.1 50 mm UPVC Conduit m 30,000

MEP & LS
7 of 4
Lighting the future
PROJECT TITLE: FOUKA BAY

Item Description Unit Qty. U/P


(EGP)
All items below shall include shop drawings, as-built drawings, manuals, warranty, maintenance and
training as per specs and contract.
3.2 25 mm UPVC Conduit m 2,050
Total of Page 1

MEP & LS
8 of 4
Lighting the future
PROJECT TITLE: FOUKA BAY

Item Description Unit Qty. U/P


(EGP)
All items below shall include shop drawings, as-built drawings, manuals, warranty, maintenance and
training as per specs and contract.
4 Concrete Encasement Duct Bank:
Supplying, Installing and Testing concrete encasement duct bank
types as shown on DWG and when ever required in road
crossing, The item include formwork, reinforcement, concrete
spacers, Duct, Fittings and all necessary accessories, ancillary
works and materials required for complete installation and
operation.

4.1 Concrete Encasement Duct Bank (6Ø 50 mm2 UPVC conduits) m 900

5 Single Mode Fiber Optic Cables


Supply, install , testing ,commissioning and put into
operation Data system complete with boxes, conduits and all
necessary connection and fixing accessories as per
specifications, service provider and drawings including the
following :

5.1 24 cores single mode fiber optic cable reinfrorced :-


5.1.1 From data center to 6 security closures in manholes. m. 6,125
5.1.2 From data center to facility management. m. 110
5.1.3 From data center to FOC 6(TR-33). m. 750
5.1.4 From data center to FOC 3(TR-3). m. 1,950
5.1.5 From data center to "THE HOUSE" hotel. m. 2,050

5.2 8 cores single mode fiber optic cable reinfrorced :-


5.2.1 From FOC 6(TR-33) to FOC 4(TR-17) and FOC 5(TR-8). m. 2,950

5.3 6 cores single mode fiber optic cable reinfrorced :-


5.3.1 From FOC 4(TR-17) to step 4 challets tie in. m. 2,100
5.3.2 From FOC 5(TR-8) to step 5 challets tie in. m. 3,750

5.4 4 cores single mode fiber optic cable reinfrorced :-


5.4.1 From FOC 3(TR-3) to FOC1(Beach) and FOC2(Beach). m. 700

5.5 2 cores single mode fiber optic cable reinfrorced


5.5.1 From closures to media converters(security). m. 14,000
5.5.2 From FOC 3(TR-3) to the 3 steps and happy city items. m. 10,600
5.5.3 From FOC 4(TR-17) to step 4 (twins and happy city items). m. 7,600
5.5.4 From FOC 5(TR-8) to step 5 (happy city items). m. 100
5.5.5 From FOC 6(TR-33) to east and south road happy city items. m. 5,400
5.5.6 From Chalet FDT to each unit m. 800

5.6 CAT6A CABLE ( FTP) for CCTV m. 4,500

Total of Page 2

MEP & LS
9 of 4
Lighting the future
PROJECT TITLE: FOUKA BAY

Item Description Unit Qty. U/P


(EGP)
All items below shall include shop drawings, as-built drawings, manuals, warranty, maintenance and
training as per specs and contract.
6 Outdoor Fiber Optic Cabinets:
Supplying, installing, connecting and testing of outdoor fiber
cabinets that include Cabinet hole under outdoor fiber cabinet,
fiber patch panels, splicing trays, splicing cassettes, optical
splitters, cable organizers, fiber connectors, fiber termination,
fiber pigtails, fixation tools, cables management, labeling...etc. for
smart network. Secured OFC should be with suitable dimensions
to be installed above the Cabinet Hole including all necessary
accessories and ancillary works and material required for
complete installations as specified and as indicated on the design
drawings for complete operative system.

Outdoor surface mounted fiber optic cabinet in closet of


6.1 No. 4
transformer building.
6.2 Smart Splitter as per design 1:32 inside 7U rack No. 12
6.3 closures as per design in manhole. No. 6

7 Fiber Distribution Terminal for Challet (FDT)


Supplying, installing, connecting and testing of fiber Distribution
Terminal (FDT) for Challet that accommodate fiber patching,
patch cords, fiber splicing, fiber connectors, fiber terminations,
fiber pigtails, fixation tools, labeling,...etc. secured boxes should
be with suitable dimensions including all necessary accessories
No, 35
and ancillary works and materials required for complete
installation and operation as specified and as indicated on the
project design drawings for complete operative system.

8 OPTICAL DISTRIBUTION FRAME (ODF)


Supplying, installing, connecting and testing of cross connect
ODFs' racks including fiber patch panels, patch cords, fiber
splicing, fiber connectors, fiber pigtails, fixation tools, labeling,
cables management..etc. Cross connect modular ODF(s) should
be with suitable dimensions including all necessary accessories,
ancillary works and materials required for complete installations
as specified and as indicated on the design drawings for complete
operative system.

8.1 ODF for triple play network No. 2

MEP & LS
10 of 4
Lighting the future
PROJECT TITLE: FOUKA BAY

Item Description Unit Qty. U/P


(EGP)
All items below shall include shop drawings, as-built drawings, manuals, warranty, maintenance and
training as per specs and contract.
Total of Page 3

MEP & LS
11 of 4
Lighting the future
PROJECT TITLE: FOUKA BAY

Item Description Unit Qty. U/P


(EGP)
All items below shall include shop drawings, as-built drawings, manuals, warranty, maintenance and
training as per specs and contract.
Happy City Items Units
1 Happy City Items Units for Beach:-

1.1 Installation is included in power BOQ - -

1.2 Fiber Optic end point termination in 20X20 cm weather proof


No. 38
junction box for Happy City Items.
1.3 Fiber Optic end point termination in 20X20 cm weather proof
No. 46
junction box for Media converters/Industrial switch.

Total of Page 4

MEP & LS
12 of 4
Lighting the future
PROJECT TITLE: FOUKA BAY

Bill Of Quantity

MEP & LS
13 of 4
Lighting the future
PROJECT TITLE: FOUKA BAY

T/P
(EGP)
drawings, as-built drawings, manuals, warranty, maintenance and
aining as per specs and contract.
GENERAL ITEMS

LOW CURRENT SYSTEM

MEP & LS
14 of 4
Lighting the future
PROJECT TITLE: FOUKA BAY

T/P
(EGP)
drawings, as-built drawings, manuals, warranty, maintenance and
aining as per specs and contract.

Total of Page 1

MEP & LS
15 of 4
Lighting the future
PROJECT TITLE: FOUKA BAY

T/P
(EGP)
drawings, as-built drawings, manuals, warranty, maintenance and
aining as per specs and contract.

Total of Page 2

MEP & LS
16 of 4
Lighting the future
PROJECT TITLE: FOUKA BAY

T/P
(EGP)
drawings, as-built drawings, manuals, warranty, maintenance and
aining as per specs and contract.

MEP & LS
17 of 4
Lighting the future
PROJECT TITLE: FOUKA BAY

T/P
(EGP)
drawings, as-built drawings, manuals, warranty, maintenance and
aining as per specs and contract.
Total of Page 3

MEP & LS
18 of 4
Lighting the future
PROJECT TITLE: FOUKA BAY

T/P
(EGP)
drawings, as-built drawings, manuals, warranty, maintenance and
aining as per specs and contract.
Happy City Items Units

Total of Page 4

MEP & LS
19 of 4
Lighting the future
PROJECT TITLE: FOUKA BAY

Owner :
Egyptian Company for Urban Development and Tourism
Investment
‫الشركة المصرية للتنمية العمرانية و الستثمار السياحي‬

Project :

Electrical Consultant :
Tarek M. Zarif, PE, LC

Bill Of Quantity

Low Current System -4 of Main Spine Pool


Date: 7/3/2019 Rev#0

MEP & LS
20 of 1
Lighting the future
PROJECT TITLE: FOUKA BAY

MEP & LS
21 of 1
Lighting the future
PROJECT TITLE: FOUKA BAY

U/P T/P
Item Description Unit Qty.
(EGP) (EGP)
All items below shall include shop drawings, as-built drawings, manuals, warranty, maintenance and
training as per specs and contract.
GENERAL ITEMS

All followings shall be considered in connection with


Low Current works as required by drawings and
specifications for all items in this BOQ.
Excavation and back filling of all below items.
Allow for cable markers and labelling.
Allow for connecting the low current installation to fiber
optic cabinets cabinets.
Allow for providing shop drawings for the entire of low
current works.
Allow for providing as-built for the entire of low current
works.
Low Current System
1 Low Current Conduit and Duct bank:
Supplying, Installing and Testing direct buried thick wall UPVC
ducts and subducts with dimensions of 50mm to fit Manhole/Hand
hole opening dimension. The item includes warning tape,
Spacers, endcap,….etc and all necessary accessories, ancillary
works, marking, labelling, protection and materials required for
complete installation and operation as specified and indicated on
the drawings.

1.1 25 mm UPVC Conduit m 125

2 Single Mode Fiber Optic Cables


Supply, install , testing ,commissioning and put into
operation Data system complete with boxes, conduits and all
necessary connection and fixing accessories as per
specifications, service provider and drawings including the
following :

2.1 2 cores single mode fiber optic cable reinfrorced m 135

Happy City Items Units

1 Happy City Items Units for Beach:-

1.1 Installation is included in power BOQ - -

1.2 Fiber Optic end point termination in 20X20 cm weather proof


No. 2
junction box for Happy City Items.

MEP & LS
22 of 1
Lighting the future
PROJECT TITLE: FOUKA BAY

U/P T/P
Item Description Unit Qty.
(EGP) (EGP)
All items below shall include shop drawings, as-built drawings, manuals, warranty, maintenance and
training as per specs and contract.
Total of Page 1

MEP & LS
23 of 1