Professional Documents
Culture Documents
1
2 • WORKING AT NIGHT
7 3
6 4
1 Safety Helmet
2 Safety Glass
8
3 Safety Glove
4 Cover all/ Wear pack (optional)
5 Safety Shoes
6 Full body Harness
5 7 Double lanyard with Absorber and Snap hook
8 Working Position Lanyard
New Site GL 1800 H3I Project
INSTALLATION
System GL 1800
SMU
RECTIFIER Module
BBU
DDF
DCDU 12B
RTN 905
4 Spare
1 2 3 4 5 6
5 Cable Data and Coaxial/IF
Water Temperature
Sensor Sensor
POWER Cable harus menggunakan skun cable, di Label and di crimping dengan alat yang sesuai.
1 2 3 4 5 6 7 8 9 10 11
POWER Cable harus menggunakan skun cable, di Label and di crimping dengan alat yang sesuai
Power DCDU terkoneksi ke PDU LLVD 80 A dan Power RTN/IDU terkoneksi ke PDU BLVD 16 A
Installation
Step1 : Connect one end of a network cable to the RS485/RS232 port on the SMU
Step2 : Connect the other end to the MON0 or MON1 port on the BBU
Installation
Step3 : Set the port mode, communications protocol type, baud rate, and communications
address on the LCD.
Comm. - 3
Address
Vertical Clamp
Horizontal Clamp
Power cable and CPRI cable dipasang dengan clamp pada setiap jarak
100 cm atau pada setiap langkah cable tray, pada horizontal cable tray
dan vertical cable tray.
MW IF cable dipasang dengan cable ties (cross/silang) tanpa clamp
pada setiap jarak 100 cm.
Power dan CPRI cable terpasang pada sisi terpisah dengan microwave
IF cable
Coaxial Installation
Must use black cable ties ( big ) with Cross Installation (X) silang
Install grounding clip pada power cable RRU sebelum bending dari vertical tray ke horizontal tray
RRU harus dipasang membelakangi antenna dan lurus. Laying cable jumper dari antenna
ke RRU harus rapi, diikat ties, tidak ada tekukan dengan radius < 20x diameter.
UPPER LOWER
MOUNTING MOUNTING
UPPER
MOUNTING
LOWER
MOUNTING
Setting boom antenna vertical menjadi tegak lurus sebelum setting antenna parameter
Pasang ketinggian mounting antenna sesuai dengan collo approved dari ToCo
Pastikan bracket mounting atas dan bawah tidak terbalik. (Atas menggunakan yang bisa disetting, bawah
menggunkan fix)
Semua baut-baut mounting dan bracket kencang. Ring per, ring plat dan mur pengunci terpasang lengkap (2 mur)
New Site UL 2100 GL 1800 H3I Project
Antenna – Installation Bracket Antenna & Mounting
Mechnical Tilting
Untuk mensetting
tekan/Tarik antenna
pada bagian atas
sehingga terdorong
keluar
Electrical Tilting
Untuk mensetting
buka penutup dan
putar ke kanan
atau kiri
Electrical and Mechanical Tilt, Azimuth and Antenna Height must be installed according TSSR and
Collo Apps Approved
Mechanical Tilt
Electrical Tilt
Electrical and Mechanical Tilt, Azimuth and Antenna Height must be installed
New Site UL 2100 GL 1800 H3I Project according TSSR and Collo Apps Approved
Tower Part Installation
Antenna and RRU Installation
Pastikan semua instalasi parameter antenna sesuai dengan collo approved dan TSSR planning ( Ketinggian,
Azimuth, MDT dan EDT)
New Site UL 2100 GL 1800 H3I Project
Tower Part Installation
Antenna and RRU Installation
3
3
2
1 Pasang label RRU
RRU Grounding cable terpasang dan kencang.
2 Dikoneksikan ke busbar atau tray tempat
busbar berada (jika tidak ada busbar), laying
rapi
Konektor jumper pada RRU dan antenna harus
3 diwaterproof sesuai standard, dilabel warna
Pasang cable power RRU. Pastikan skun power cable terpasang dan kabel terpasang kencang.
1 Ujung satunya terpasang pada DCDU
Lihat petunjuk pemsangan kabel power CPRI. Kupas isolator power cable dan koneksikan ke
2
penjepit cable power di RRU
3 Pasang cable CPRI ke CPRI port di RRU dengan kuat dan pas. Ujung kabel CPRI satunya lagi
terpasang ke UBPP port sesuai sector RRU/ Pastikan tidak ada cross CPRI
a+ a- a+ a-
a+ a- a+
RRU5904 GL 1800M
CPRI
Cable
Coloring Label
• Red Sector 1
• Yellow Sector 2
• Blue Sector 3
RRU 5904 RRU 3959/ RRU 3959 RRU 3959 RRU 3959
RRU 5904
Coloring Label
• Red Sector 1
• Yellow Sector 2
• Blue Sector 3
Instalasi mounting antenna MW pada tower leg model siku dan pipa. Semua baut-baut harus
kencang dan dilengkapi dengan ring per, ring plat, dan baut pengunci (lock not/double nut)
New Site UL 2100 GL 1800 H3I Project
Tower Part Installation
MICROWAVE Installation
3
1 Label antenna, terbuat dari waterproof material (gunakan print label)
3
2
4
4
1 2 3 4 5 6 7 8 9 10 11
POWER Cable Must Use Cable Lug / ferule and Labeled and Crimp properly
Power RTN connect to BLVD 16 A
2
Thanks You
3