New Site

GL 1800 Project H3I

Prepared by : Quality Team


EHS
New Site GL 1800 H3I Project
EHS and Tools Site Preparation

New Site GL 1800 H3I Project


EHS and Tools Site Preparation

1
2 • WORKING AT NIGHT
7 3

6 4
1 Safety Helmet
2 Safety Glass
8
3 Safety Glove
4 Cover all/ Wear pack (optional)
5 Safety Shoes
6 Full body Harness
5 7 Double lanyard with Absorber and Snap hook
8 Working Position Lanyard
New Site GL 1800 H3I Project
INSTALLATION

New Site GL 1800 H3I Project


General Site Information

Site Type Greenfield/Roof Top

System GL 1800

New Site GL 1800 H3I Project


Ground Part Installation
Cabinet and Equipment Overview

New Site GL 1800 H3I Project


Ground Part Installation
Pengamanan Cabinet  Pemasangan cabinet mechanical anchor ataupun belt protection

New Site UL 2100 GL 1800 H3I Project


Ground Part Installation
Pengamanan Cabinet

New Site GL 1800 H3I Project


Ground Part Installation TP48200A Belt Installation
Cabinet and Equipment Overview

Install 2 anchor bolt pada setiap kaki cabinet belt


New Site GL 1800 H3I Project
Ground Part Installation
Cabinet and Equipment Overview

Arrester Breaker PDU LLVD


Breaker PDU BLVD
Main Input Rectifier Breaker Battery

SMU
RECTIFIER Module

BBU

DDF
DCDU 12B

RTN 905

New Site GL 1800 H3I Project


Ground Part Installation
Cabinet and Equipment Overview

1 Power Cable dari ACPDB

2 Grounding Cable Cabinet

3 Optical Cable/CPRI dari RRU

Battery Cable dan Grounding 4

Cable Data dan Coaxial/IF 5


4
3 RRU Power Cable 6 6
2 5 7
1 Water Sensor External Alarm Cable 7

New Site GL 1800 H3I Project


Ground Part Installation
Cabinet and Equipment Overview

1 Power Cable dari ACPDB

7 2 Optical Cable dari RRU

3 Cabinet Grounding Cable

4 Spare
1 2 3 4 5 6
5 Cable Data and Coaxial/IF

6 Power Cable RRU

7 Label baterai terpasang

New Site GL 1800 H3I Project


Ground Part Installation
Cabinet and Equipment Overview

Smoke Tem – Humidity


Sensor Sensor

Water Temperature
Sensor Sensor

Cabinet Sensor Alarm Installation


New Site GL 1800 H3I Project
Ground Part Installation
Cabinet and Equipment Overview

Cabinet Sensor Alarm Installation


New Site GL 1800 H3I Project
Ground Part Installation
Cabinet and Equipment Overview

ACPDB Rectifier/TP 48200

POWER Cable harus menggunakan skun cable, di Label and di crimping dengan alat yang sesuai.

New Site GL 1800 H3I Project


Ground Part Installation
Cabinet and Equipment Overview

Power Equipment Rectifier / TP 48200

1 2 3 4 5 6 7 8 9 10 11

POWER Cable harus menggunakan skun cable, di Label and di crimping dengan alat yang sesuai
Power DCDU terkoneksi ke PDU LLVD 80 A dan Power RTN/IDU terkoneksi ke PDU BLVD 16 A

New Site GL 1800 H3I Project


Ground Part Installation
Labeling Equipment Overview

New Site GL 1800 H3I Project


Ground Part Installation External Alarm Connection from
ACPDB
Cabinet and Equipment Overview

- Phase Failure Alarm


- Arrester Failure Alarm

Grounding Cabinet Connection

New Site GL 1800 H3I Project


Detail Cable Connection External Alarm
Neteco Alarm

Installation
Step1 : Connect one end of a network cable to the RS485/RS232 port on the SMU
Step2 : Connect the other end to the MON0 or MON1 port on the BBU

(1) RS485/RS232 Port (2) MON1 Port

New Site GL 1800 H3I Project


Neteco Alarm

Installation

Step3 : Set the port mode, communications protocol type, baud rate, and communications
address on the LCD.

Main Menu Second-Level Third-Level Menu Fourth-Level Fifth-Level Setting


Menu Menu Menu

Parameters Comm. Serial Port Northbound Port Mode Manual


Settings Parameters
Protocol M/S
Type Protocol

M/S Protocol Baud Rate - 9600

Comm. - 3
Address

New Site GL 1800 H3I Project


Tower Part Installation
Cabinet and Equipment Overview

CPRI & IF cable Spare Optical Cable diletakkan di bawah cabinet


Power
cable sehingga tidak terexposed, dilabel dan ties di 4 sisi

New Site GL 1800 H3I Project


Routing Cable
 Installed cable tidy and straight

Vertical Clamp

Horizontal Clamp

 Power cable and CPRI cable dipasang dengan clamp pada setiap jarak
100 cm atau pada setiap langkah cable tray, pada horizontal cable tray
dan vertical cable tray.
 MW IF cable dipasang dengan cable ties (cross/silang) tanpa clamp
pada setiap jarak 100 cm.
 Power dan CPRI cable terpasang pada sisi terpisah dengan microwave
IF cable

New Site GL 1800 H3I Project


Tower Part Installation
Cabinet and Equipment Overview

Grounding kit power cable RRU and Coaxial Connection


Must waterproofing properly with Insulation tape 3x, rubber 3x, Insulation tape 3x and tied with black cable ties ( besar )

Coaxial Installation
Must use black cable ties ( big ) with Cross Installation (X) silang

New Site GL 1800 H3I Project


Grounding Connection using Grounding Clip (if needed)

Install grounding clip pada power cable RRU sebelum bending dari vertical tray ke horizontal tray

New Site GL 1800 H3I Project


Tower Part Installation
Antenna and RRU Installation

Antenna and RRU assembly on Ground

All connector must waterproofing properly


labeling with color insulation tape
RRU TX/RXA >>>> Antenna +45
RRU TX/RXB >>>> Antenna - 45

New Site GL 1800 H3I Project


Tower Part Installation
Antenna and RRU Installation

 Antenna dan RRU di rakit dibawah agar rapi dan mudah.


 Resiko terjatuh semakin kecil karena bekerja di ketinggian
semakin cepat

RRU harus dipasang membelakangi antenna dan lurus. Laying cable jumper dari antenna
ke RRU harus rapi, diikat ties, tidak ada tekukan dengan radius < 20x diameter.

New Site UL 2100 GL 1800 H3I Project


Tower Part Installation
Antenna and RRU Installation

RRU harus dipasang membelakangi antenna sehingga instalasi rapi.


Laying cable jumper dari antenna ke RRU rapi, diikat ties, tidak ada tekukan dengan radius < 20x diameter.

New Site GL 1800 H3I Project


Antenna – Installation Bracket Antenna & Mounting

UPPER LOWER
MOUNTING MOUNTING

UPPER
MOUNTING

LOWER
MOUNTING

 Setting boom antenna vertical menjadi tegak lurus sebelum setting antenna parameter
 Pasang ketinggian mounting antenna sesuai dengan collo approved dari ToCo
 Pastikan bracket mounting atas dan bawah tidak terbalik. (Atas menggunakan yang bisa disetting, bawah
menggunkan fix)
 Semua baut-baut mounting dan bracket kencang. Ring per, ring plat dan mur pengunci terpasang lengkap (2 mur)
New Site UL 2100 GL 1800 H3I Project
Antenna – Installation Bracket Antenna & Mounting

Mechnical Tilting 
Untuk mensetting
tekan/Tarik antenna
pada bagian atas
sehingga terdorong
keluar

Electrical Tilting 
Untuk mensetting
buka penutup dan
putar ke kanan
atau kiri

 Electrical and Mechanical Tilt, Azimuth and Antenna Height must be installed according TSSR and
Collo Apps Approved

New Site UL 2100 GL 1800 H3I Project


Antenna – Installation Bracket Antenna & Mounting

Mechanical Tilt

Cara mensetting nilai mechanical tilt:


1. Setting nilai inclinometer sesuai dengan nilai mechanical
tilt pada TSSR
2. Pasang/tempel inclinometer pada belakang antenna dekat
dengan label antenna
3. Longgarkan baut bracket scale (pengatur tilting antenna)
4. Dorong antenna kearah luar atau dalam, sehingga air
waterpass pada inclometer berada pada posisi horizontal
(ditengah)
5. Kencangkan kembali baut-baut bracket scale

Electrical Tilt

Cara mensetting nilai electrical tilt:


1. Buka penutup warna putih pada bagian bawah antenna.
2. Putar lingkaran penyesuai (adjustment) sehingga skala
penunjuk angka menjadi sesuai dengan nilai electrical tilt
pada TSSR
3. Pasang kembali penutup warna putih dengan kencang.

 Electrical and Mechanical Tilt, Azimuth and Antenna Height must be installed
New Site UL 2100 GL 1800 H3I Project according TSSR and Collo Apps Approved
Tower Part Installation
Antenna and RRU Installation

Pastikan semua instalasi parameter antenna sesuai dengan collo approved dan TSSR planning ( Ketinggian,
Azimuth, MDT dan EDT)
New Site UL 2100 GL 1800 H3I Project
Tower Part Installation
Antenna and RRU Installation

3
3

2
1 Pasang label RRU
RRU Grounding cable terpasang dan kencang.
2 Dikoneksikan ke busbar atau tray tempat
busbar berada (jika tidak ada busbar), laying
rapi
Konektor jumper pada RRU dan antenna harus
3 diwaterproof sesuai standard, dilabel warna

New Site UL 2100 GL 1800 H3I Project


Tower Part Installation
Antenna and RRU Installation

Pasang cable power RRU. Pastikan skun power cable terpasang dan kabel terpasang kencang.
1 Ujung satunya terpasang pada DCDU
Lihat petunjuk pemsangan kabel power CPRI. Kupas isolator power cable dan koneksikan ke
2
penjepit cable power di RRU

3 Pasang cable CPRI ke CPRI port di RRU dengan kuat dan pas. Ujung kabel CPRI satunya lagi
terpasang ke UBPP port sesuai sector RRU/ Pastikan tidak ada cross CPRI

New Site UL 2100 GL 1800 H3I Project


Tower Part Installation
Antenna and RRU Installation
RRU5904+RRU3959 Antenna Connection

Sector 1 Sector 2 Sector 3

a+ a- a+ a-

RRU5904 GL 1800M RRU3959a GL 1800M

Power Cable AWG 10 Power Cable AWG 12


CPRI CPRI
Cable Cable

New Site GL 1800 H3I Project


Tower Part Installation
Antenna and RRU Installation

2*RRU5904 Antenna Connection

Sector 1 Sector 2 Sector 3

a+ a- a+

RRU5904 GL 1800M

Power Cable AWG 10 Power Cable AWG 10


CPRI CPRI
Cable Cable

New Site GL 1800 H3I Project


SFP Connector
RRU5904 GL 1800M
Example of SFP Connector

CPRI
Cable

Capacity of the SFP Type of SFP


SFP Coonector 10G => 10 Gbps SM => Single Mode
Optic Cable MM => Multi Mode

1st RRU connect to Port 0 of UBBPe4


2nd RRU connect to Port 1 of UBBPe4
SFP that used for connection between UBBP to RRU MUST at least 9.8 Gbps Single Mode

New Site GL 1800 H3I Project


Tower Part Installation
Antenna and RRU Installation

Semua kabel grounding RRU harus


dipasang dan terkoneksi ke busbar terdekat

New Site UL 2100 GL 1800 H3I Project


Tower Part Installation
Antenna and RRU Installation

System GL 1800  Jumper Cable


antenna antenna antenna
+45 -45 +45 -45 +45 -45

Coloring Label
• Red  Sector 1
• Yellow  Sector 2
• Blue  Sector 3

TX/RXA TX/RXA TX/RXA System GL 1800


TX/RXB TX/RXB TX/RXB • 2 ring + 2 ring White Color  TX/RXA >> ANT +45
• 1 ring + 2 ring White Color  TX/RXA >> ANT - 45
New Site UL 2100 GL 1800 H3I Project
Tower Part Installation
Antenna and RRU Installation

System GL 1800  CPRI & Power Cable Labeling

2 RRU 3 sector Antenna 3 RRU 3 sector Antenna

RRU 5904 RRU 3959/ RRU 3959 RRU 3959 RRU 3959
RRU 5904

Coloring Label
• Red  Sector 1
• Yellow  Sector 2
• Blue  Sector 3

New Site GL 1800 H3I Project


Tower Part
MICROWAVE Installation
1 + 0 SYSTEM 2 + 0 SYSTEM WITH WAVE GUIDE

New Site UL 2100 GL 1800 H3I Project


Tower Part Installation
MICROWAVE Installation

LEG TOWER SIKU


LEG TOWER TUBULAR/BULAT

Instalasi mounting antenna MW pada tower leg model siku dan pipa. Semua baut-baut harus
kencang dan dilengkapi dengan ring per, ring plat, dan baut pengunci (lock not/double nut)
New Site UL 2100 GL 1800 H3I Project
Tower Part Installation
MICROWAVE Installation

3
1 Label antenna, terbuat dari waterproof material (gunakan print label)

2 Label ODU, terbuat dari waterproof material (gunakan print label)

3 Grounding cable terpasang ke ODU dan dilabel

New Site UL 2100 GL 1800 H3I Project


Tower Part Installation
MICROWAVE Installation

1 ODU grounding cable


1
2 2 IF cable spare, install tidy in
the back of tower leg at
mounting height

New Site UL 2100 GL 1800 H3I Project


Ground Part Installation
MICROWAVE Installation

New Site UL 2100 GL 1800 H3I Project


Ground Part Installation
MICROWAVE Installation

1 IF connector covered by heat shrink and Labeled

2 Label direction and actual frequency

3 Grounding cable connected properly

4 Power Cable was labeled

5 Attach label on Ethernet/Optical Cable


5

3
2

4
4

New Site UL 2100 GL 1800 H3I Project


Ground Part Installation
Cabinet and Equipment Overview

Power Equipment Rectifier

1 2 3 4 5 6 7 8 9 10 11

POWER Cable Must Use Cable Lug / ferule and Labeled and Crimp properly
Power RTN connect to BLVD 16 A

New Site UL 2100 GL 1800 H3I Project


1

2
Thanks You