Battery cabinet:
184Ah*2
RF cabinet for 6
DRFU
• Fix the base to the plinth and check the levelness with level bar, if the
level bar is not in the middle, use the adjusting pad to adjust the
levelness
• 2 base need to be installed, one is for BTS3900A, one is for battery
cabinet
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 5
Install the cabinet
• Push the cabinet so that the cabinet can be in full contact with the
installation block
• Use two bolts to fix the cabinet to the base
Special handle
PMU is needed to
remove the
PDU
DRFU
BBU
DRFU
Install the BBU, DRFU, PMU and PSU to
the cabinet as shown in the picture.
The BBU should be close to the PDU
panel, without space between PDU and
BBU
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 7
Connect the DC cable for BBU and DRFU
Load5
Connector to
UPEU on BBU
DC power cable for DRFU
GTMU
DRFU
CPRI
cable
Connect the CPRI cable between the GTMU and DRFU, the 6 ports
on GTMU should be connected to the corresponding DRFU. The port
on DRFU should be port0
The CPRI cable route should be at left side of the cabinet, as show in
the picture
UELP
Upper 6
jumper to
be installed
Usually, the
lower 6 jumper
is not needed
• S2 • S2 PBT
• S3
• S4
• Usually, one cabinet has 6 jumpers, please refer to the picture for the
jumper and RF cable connection.
• One end of the jumper is straight DIN connector, the other end (BTS side) is
right angle DIN connector. The connectors need to be made on site.
• The configuration of the cell is as showing in the picture:S2, S2 PBT, S3, S4
Wiring
cover cover
Step 3
Step 1 Step 2
Step1:Install the lower cabinet and remove the cover
Step2:Install the wiring cover to the lower cabinet
Step3:Seal the wiring cover with mud.
Step4:Install the upper cabinet on top of the lower cabinet,
fasten the upper cabinet with 4 bolts. Step 4
PDU
Dig the channel and Make the bend with Ground the AC cable
lay the AC cable the Gi flex pipe armor with the hose
clip
• Install the SPD box on the meter cubicle, the SPD should
be grounded.
BBU(MON0)
FMUA(COM IN)
Socket to connect
the 2 sensor
• Connect the door sensors of the two battery cabinets and the
APM30 as red line shown in the picture
• Connect the sensor cable to the socket of the prior door sensor,
so the connection of the 3 door sensors are serial
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 23
Antenna system installation
• Find the seal mud in the cabinet, after all the wiring is
finished, seal the hole at the bottom of the cabinet with the
mud.
AC input DC output
Breaker Breaker
LIU1
Connect the E1 cable to MW, check the indicator “LIU1” on the GTMU, if
it’s always off, it means the E1 is normal.
After the BTS is on air, make some test call, check the cell broadcast
service and GPRS service.