EMERGENCY ACTION PLAN

HIRAKUD DAM [OR10HH0003]

EMERGENCY ACTION PLAN


Prepared for: Prepared by:
Central Project Management Unit (CPMU)
3rd Floor, CWC Library Building
Rajiv Bhawan, Opposite Secretariat, R.K.Puram, New Delhi
Bhubaneswar, Odisha 751001 Tel. (+91) 11-29583480,
110066, Delhi.
Office Ph: 06632430866
October 2018
Emergency Action Plan
HIRAKUD DAM [OR10HH0003]
HIRAKUD DAM
Project ID Code [OR10HH0003]

Sambalpur, Odisha

Disclaimer

Every effort has been taken to estimate the severity of flooding and inundation areas likely to be affected
by Hirakud Dam in an emergency condition. These estimates are based on available primary and secondary
data. Every effort has been made to foresee varied emergency possibilities and develop appropriate
notification procedures for timely rescue and relief operations. However, implementation of the Emergency
Action Plan (EAP) involves many agencies, who are required to work in a coordinated manner to reduce the
consequences of the emergency triggered by the dam site condition. Effectiveness of the rescue and relief
operations depend on many factors including the adequacy and accuracy of the estimation of the severity of
flooding, coordinated efforts of all the agencies involved in rescue and relief efforts and availability of
facilities like power, telephones, road communications, etc. EAP Developer may therefore, not be held
responsible for the efficacy of the EAP.

For any information, please contact:

(Jyotirmaya Rath)
Chief Engineer & Basin Manager, UMB
Odisha Water Resources Department
Burla
Mobile Ph: 9437223174
E-mail: cebmumbburla@rediffmail.com

ODISHA WATER RESOURCES DEPARTMENT


CENTRAL PROJECT MANAGEMENT UNIT
Emergency Action Plan
HIRAKUD DAM [OR10HH0003]

FOREWORD

The basic purpose of this plan is to provide a guide for emergency operations. The plan is intended to assist
key city officials and emergency organizations to carry out their responsibilities for the protection of life and
property under a wide range of emergency conditions.

When disasters threaten or strike a jurisdiction, people expect elected leaders to take immediate action to
deal with the problem. Local government is expected to marshal its resources, channel the efforts of voluntary
agencies and private enterprise in the community, and solicit assistance from outside the jurisdiction, if
necessary.

This is the Emergency Action Plan for Hirakud Dam Project. It assigns responsibility to organizations and
individuals for carrying out specific actions in emergencies exceeding the capacity or routine responsibility of
any agency. The Plan sets forth lines of authority and organizational relationships and shows how
coordination should be achieved. The Plan describes how people and property will be protected and
identifies personnel and resources available within the districts involved, or by agreement with others, for use
during response and recovery operations.

Although an organization may have the foresight to plan for anticipated situations, such planning is of little
worth if the planning is not reduced to written form. Personnel familiar with unwritten plans may be
unavailable at the time it becomes necessary to implement them. A written plan will furnish a documentary
record, which can be referred to as needed. This documentary record will serve to refresh the knowledge of
key individuals and can be used to inform persons who become replacements.

Primary goals of the Emergency Action Plan are:


 Protect life and property and alleviate human distress.
 Ensure that the public safety and welfare is maintained by coordinating aid.
 Improve emergency response through planning and education.
 Define roles of departments and agencies for large and small emergencies.
 Develop effective response and coordination among district agencies.
 Promote mobilization with less duplication of effort or gaps.
 Outline access to resources within corresponding districts.
 Encourage partnerships between government, private and volunteer sectors.
 Outline the recovery and restoration process (resilience).

(Pradeep Kumar Jena, IAS)


Principal Secretary, Deptt. Of Water Resources

ODISHA WATER RESOURCES DEPARTMENT


CENTRAL PROJECT MANAGEMENT UNIT
Emergency Action Plan
HIRAKUD DAM [OR10HH0003]

PREFACE

The Central Dam Safety Organization (CDSO) recognize that having an effective Emergency Action Plan
(EAP) for all high- and significant-hazard potential dams in India is critical to reduce the risks of loss of life
and property damage from dam failures. It is especially critical to have an EAP at the high hazard potential
dams that have been found to be unsafe or do not meet current accepted dam safety criteria.

There is a consensus in the dam safety community that some of the major reasons for the lack of an EAP at
some high-hazard potential dams are the cost of detailed dam break studies and the lack of
knowledge/resources from part of Dam Owner‘s officials to carry out such type of analysis by their own. In
addition, it has become increasingly clear that many dam owners do not understand their personal liability
for the downstream loss of life and property damage in the event their dam fails.

Dam owners of high- and significant-hazard potential dams are encouraged to contact the Dam Safety
Organization either at Central or State level (CDSO and SDSO) for further guidance on emergency action
planning and the use of the resources included in this EAP, as well as for additional resources the State Dam
Safety Organization may have to assist dam owners in the preparation of EAPs.

(N.K Mathur)
Member (D&R), Central Water Commission

ODISHA WATER RESOURCES DEPARTMENT


CENTRAL PROJECT MANAGEMENT UNIT
Emergency Action Plan
HIRAKUD DAM [OR10HH0003]
TABLE OF CONTENT

APPROVAL AND IMPLEMENTATION .........................................................................................................11


EAP DISTRIBUTION LIST .............................................................................................................................13
LOG SHEET OF CHANGES ..........................................................................................................................19
1. PURPOSE ..............................................................................................................................................1
2. DAM DESCRIPTION ...............................................................................................................................1
2.1. General ................................................................................................................................................................... 1
2.2. Reservoir Operations ............................................................................................................................................ 2
3. RESPONSIBILITIES .................................................................................................................................4
3.1. Dam Owner‘s Responsibilities .............................................................................................................................. 4
3.2. Dam Safety Organization‘s Responsibilities ..................................................................................................... 6
3.3. Responsibilities for Notification ........................................................................................................................... 7
3.4. Responsibilities for Evacuation ............................................................................................................................ 8
3.5. Responsibilities for Termination and Follow-Up ............................................................................................... 9
4. COMMUNICATIONS NETWORKS ........................................................................................................10
5. EMERGENCY DETECTION, EVALUATION, AND CLASSIFICATION......................................................11
5.1. Emergency Detection.......................................................................................................................................... 11
5.1.1. Situations ...................................................................................................................................................... 11
5.1.2. Signs of Failure ........................................................................................................................................... 11
5.2. Emergency Evaluation and Classification ....................................................................................................... 12
5.3. Previously Known Problems .............................................................................................................................. 13
6. PREPAREDNESS ..................................................................................................................................13
6.1. Surveillance .......................................................................................................................................................... 13
6.2. Response on forecast of excessive inflow ...................................................................................................... 14
6.3. Response during weekends and holidays ...................................................................................................... 14
6.4. Response during periods of darkness and adverse weather ..................................................................... 14
6.5. Access to the site ................................................................................................................................................. 15
6.6. Remedial Actions................................................................................................................................................. 15
7. SUPPLIES AND RESOURCES ................................................................................................................16
7.1. Contracts .............................................................................................................................................................. 16
7.2. Equipment and Supplies .................................................................................................................................... 16
7.3. Reports.................................................................................................................................................................. 16
8. EMERGENCY OPERATIONS CENTRE ...................................................................................................16
8.1. Activity log ........................................................................................................................................................... 16
8.2. Costs of the Emergency Operations Centre .................................................................................................. 17
9. INUNDATION AREA ...........................................................................................................................17

ODISHA WATER RESOURCES DEPARTMENT


9.1. Local Evacuation Plan ........................................................................................................................................ 19
10. IMPLEMENTATION ..............................................................................................................................20
10.1. Development ................................................................................................................................................... 20
10.2. Updating .......................................................................................................................................................... 20
10.3. Testing............................................................................................................................................................... 21
10.4. Training............................................................................................................................................................. 21

WATCH CONDITION NOTIFICATION FLOW CHART (INTERNAL ALERT)


FAILURE CONDITION NOTIFICATION FLOW CHART (EXTERNAL ALERT)
(ANGUL DISTRICT) .................................................................................................... Notification Flowchart
(BARAGARTH DISTRICT) .......................................................................................... Notification Flowchart
(BOUDH DISTRICT) ................................................................................................... Notification Flowchart
(CUTTACK DISTRICT) .............................................................................................................. Notification Flowchart
(DHENKANAL DISTRICT) ....................................................................................................... Notification Flowchart
(JAGATSINGHPUR DISTRICT) ............................................................................................... Notification Flowchart
(JAJPUR DISTRICT) ................................................................................................................. Notification Flowchart
(KENDRAPARA DISTRICT) .................................................................................................... Notification Flowchart
(KHORDHA DISTRICT) ............................................................................................................ Notification Flowchart
(NAYAGARH DISTRICT) ......................................................................................................... Notification Flowchart
(PURI DISTRICT) ....................................................................................................................... Notification Flowchart
(SAMBALPUR DISTRICT) ........................................................................................................ Notification Flowchart
(SONEPUR DISTRICT) ................................................................................................ Notification Flowchart

ANNEXURES
ANNEXURE 1 ............................................................................................................................Vecinity Map
ANNEXURE 2 (Separate Booklets) .......................................................... Inundation Maps, Evacuation Plan
ANNEXURE 3 .................................................................................................... Shelters / Relief Camps List
ANNEXURE 4 ........................................................ Emergency Level Determination and Action Data Sheets
ANNEXURE 5 .......................................................................................................... Supplies and Resources
ANNEXURE 6 ................................................................................................. Sample Public Annoucements
ANNEXURE 7 ...................................................................................................................... Dam Description
ANNEXURE 8 ........................................................................................................... Annual EAP Evaluation
ANNEXURE 9 ......................................................................................................... Plan Review and Update
ANNEXURE 10 ..................................................................................................................... Training Record

CENTRAL PROJECT MANAGEMENT UNIT


Emergency Action Plan
HIRAKUD DAM [OR10HH0003]
Hirakud Dam
Project ID Code [OR10HH003]

APPROVAL AND IMPLEMENTATION

This Emergency Action Plan has been prepared by Central Project Management Unit in collaboration with
Odisha Water Resources Department. This version of the document is hereby approved and is effective
immediately and supersedes all previous editions.

(Pradeep Kumar Jena, IAS) Date


Principal Secretary, Dept. Of Water Resources

(Gulsan Raj) Date


Chief Engineer, Central Dam Safety Organization

I have received a copy of this Emergency Action Plan and concur with the notification procedures.

(Prafulla Kumar Swain) Date


Chief Engineer, Dam Safety Organization, Bhubaneswar

(Samarth Verma) Date


District Disaster Management Authority, Sambalpur

ODISHA WATER RESOURCES DEPARTMENT


CENTRAL PROJECT MANAGEMENT UNIT
Emergency Action Plan
HIRAKUD DAM [OR10HH0003]
Hirakud Dam
Project ID Code [OR10HH003]

EAP DISTRIBUTION LIST

By my signature, I acknowledge that I, or my representative, have reviewed this plan and concur with the
tasks and responsibilities assigned herein for my organization and me.

Authority Name, Title, Phone Acceptance Signature


Name: Er. Naresh Kumar Barik
Title: Deputy Executive Engineer
Mobile Ph:9090004061/9668891081
Office Ph: 9668891081
Email: naresh.vsut87@gmail.com
Name: Er. Amulya Narayan Pradhan
Dam Operator / Site Title: Assistant Engineer
Officials Mobile Ph:9556025410
Office Ph: NOT PROVIDED
Email: narayanamulya.pradhan@gmail.com
Name: Er. Satrughna Guru
Title: Assistant Engineer
Mobile Ph:8895628134
Office Ph: 7077316575
Email: dee.mdshkd@gmail.com
Name: Er. Chinmoy Ranjan Rout
Title: Executive Engineer, Main Dam Division
Mobile Ph: 8895483648
Office Ph: 06632430101
Emergency Planning Email: ee_mddburla@rediffmail.com
Manager Name: Er. Amiya Kumar Seth
Title: Assistant Executive Engineer
Mobile Ph:9437347691
Office Ph: 0663-2430292
Email: amiya_seth@rediffmail.com
Name: Er. Jyotirmaya Rath
Title: Chief Engineer & Basin Manager, UMB
Mobile Ph: 9437223174
Office Ph: 06632430866
Odisha Water Email: cebmumbburla@rediffmail.com
Resources Department Name: Er. Bhakta Ranajan Mohanty
Title: Superintending Engineer, Hirakud Dam Circle
Mobile Ph:9437035420
Office Ph: 06632430001
Email: se.hdc@rediffmail.com
Name: Er. Prafulla Kumar Swain
Title: Chief Engineer, Dam Safety, Bhubaneswar
Odisha Dam Safety Mobile Ph: 9437022440
Organisation Office Ph: 06742531935
Email: cedamsafety-eicwr.od@nic.in
Name: Dr. Akshya Kumar Das
Title: Director, Dam Safety

ODISHA WATER RESOURCES DEPARTMENT


Authority Name, Title, Phone Acceptance Signature
Mobile Ph: 9437002409
Office Ph: 06742391982
Email: akdas61@gmail.com
Name: Mr. Gulsan Raj
Title: Chief Engineer, CWC, New Delhi
Mobile Ph: 9999277474
Office Ph: 2610 6848
Central Dam Safety Email: cedams@nic.in
Organisation Name: Mr. Pramod Narayan
Title: Director, Dam Safety & Rehabilitation, CWC
Mobile Ph:9958975921
Office Ph: 011-29583480
Email: dir-drip-cwc@nic.in
Name: Shri Prasanta Kumar Nayak
Title: General Manager, Training & Coordination.
Mobile Ph:9437170179
Office Ph: 0674-2395398
Odisha Disaster Email: nayak.prasanta5@gmail.com
Management Authority
Name: Sri Pravat Kumar Mohaptra
Title: Joint Relief Commissioner, OSDMA
Mobile: 9437306659
Office Ph: 0674- 2395398
Email NOT PROVIDED
Official No 1:
Name: Brig. Ajay Gangwar
Title: Advisor (Ops.)
Office Ph: 011-26701886
National Disaster Email: advopscomn@ndma.gov.in
Management Authority
Official No 2:
Name: Dr. Pavan Kumar Singh
Title: Joint Advisor (Ops)
Office Ph: 011-26701788
Email: ja.ops@ndma.gov.in
Name: Shri Anil Kumar Samal
Title: District Collector
Mobile Ph: 9437031784
[ANGUL DISTRICT] Office Ph: 06764-230567
Email: NOT PROVIDED
District Disaster Name: Shri Bichitrananda Nayak
Management Authority Title: Tahasildar
Mobile Ph:8018140746
&
Office Ph: NOT PROVIDED
Police Department Email: NOT PROVIDED
Superintendent of Police
Contact Name: Shri Mitrabhanu Mohapatra
Mobile Ph: 9438916430
Office Ph: 06764-230316
[BARAGARH Name: SriIndramani Tripathy
DISTRICT] Title: District Collector
Mobile Ph: 9438000044

CENTRAL PROJECT MANAGEMENT UNIT


Emergency Action Plan
HIRAKUD DAM [OR10HH0003]
Authority Name, Title, Phone Acceptance Signature
District Disaster Office Ph: 06646-232340
Management Authority Name: Sri Sabyasachi Panda
Title: Tahasildar
& Mobile Ph: 8763685529
Police Department Office Ph: NOT PROVIDED
Email: NOT PROVIDED
Superintendent of Police
Contact Name :Shri Mukesh Kumar Bhamo
Mobile Ph:9438916490
Office Ph: 06646-234480
Name: Sri Sitansu Kumar Rout
Title: District Collector
Mobile Ph:9430965778
[BOUDH DISTRICT] Office Ph:06841-222203
Email: NOT PROVIDED
District Disaster Name: Sri Lalatendu Si
Management Authority Title: Tahasildar
Mobile Ph:7978381110
&
Office Ph: NOT PROVIDED
Police Department Email: NOT PROVIDED
Title: Superintendent of Police
Contact Name: Shri Sudhansu Sekhar Mishra
Mobile Ph:9438916690
Office Ph: 06841-222206
Name: Shri Aravind Agrawal
Title: District Collector
[CUTTACK DISTRICT]
Mobile Ph:9438106239
District Disaster Office Ph:0671-2508100
Management Authority Name: Sanjibita Ray
Title: Tahasildar
& Mobile Ph:9437187888
Title: Superintendent of Police
Police Department Contact Name :Shri Madhab Chandra Sahoo
Mobile Ph:9437178872
Office Ph: 0671-2368116
Name: Shri Nikhil Pavan Kalyan
[DHENKANAL Title: District Collector
DISTRICT] Mobile Ph:8280066828
Office Ph:06762-225602
District Disaster Name: Shri Uday Kumar Mohapatra
Management Authority Title: Tahasildar
Mobile Ph:9437529295
&
Title: Superintendent of Police
Police Department Name :Shri Shri Santosh Kumar Nayak
Mobile Ph:9437106171
Office Ph: 06762-225777
Name: Smt. Yamini Sarangi
Title: District Collector
[JAGATSINGHPUR Mobile Ph:9437048177
DISTRICT] Office Ph:06724-220379
Name: Shri Chintamani Singh
District Disaster Title: Tahasildar

ODISHA WATER RESOURCES DEPARTMENT


Authority Name, Title, Phone Acceptance Signature
Management Authority Mobile Ph:9861684694
Contact Name :Shri Prakash R
& Title: Superintendent of Police
Police Department Mobile Ph:9439876581
Office Ph: 06724-220115
Name: Shri Ranjan Kumar Deb
Title: District Collector
[JAJPUR DISTRICT]
Mobile Ph:9437286512
District Disaster Office ph:06728-222001
Management Authority Name: Shri Laxmikanta Mishra
Title: Tahasildar
& Mobile Ph:9437636118
Name :Shri Charan Singh Meena
Police Department Title: Superintendent of Police
Mobile Ph:8763294357
Office Ph: 06726-240112
Name: Shri Bibhuti Bhusan Pattanaik
[JHARSUGUDA Title: District Collector
DISTRICT] Mobile Ph:9438342614
Office Ph:06645-272802
District Disaster Name: Shri Golaka Bihari Mangaraj
Management Authority Title: Tahasildar
Mobile Ph:9437222389
&
Name :Shri Aswini Kumar Mohanty
Police Department Title: Superintendent of Police
Mobile Ph:9438916530
Office Ph: 06645-270808
Name: Shri Dasarathy Satapathy
[KENDRAPARA
Title: District Collector
DISTRICT]
Mobile Ph:9439883093
District Disaster Name:
Management Authority Title: Tahasildar
Mobile Ph:
& Name :Shri Niti Sekhar
Title: Superintendent of Police
Police Department Mobile Ph:9438916260
Office Ph: NOT PROVIDED
Name: Shri Nirmal Chandra Mishra
Title: District Collector
[KHORDHA DISTRICT] Mobile Ph:9437124029
District Disaster Office Ph: 06755-220001
Management Authority Name: Shri Sailendra Kumar Samantray
Title: Tahasildar
& Mobile Ph: 9437790442
Name :Shri Dipti Ranjan Ray
Police Department Title: Superintendent of Police
Mobile Ph:9437041583
Office Ph: 06755220001
[NAYAGARH Name: Dr. N. Thirumala Naik
DISTRICT] Title: District Collector
Mobile Ph:8280343088
District Disaster Office Ph: 06753-252333

CENTRAL PROJECT MANAGEMENT UNIT


Emergency Action Plan
HIRAKUD DAM [OR10HH0003]
Authority Name, Title, Phone Acceptance Signature
Management Authority Name: Shri Manoj Kumar Sahoo
Title: Tahasildar
& Mobile Ph:9437874633
Name :Shri Sashi Bhusan Satapathy
Police Department
Title: Superintendent of Police
Mobile Ph:7978683769
Office Ph: 06753--252088
Name: Shri Jyoti Prakash Das
Title: District Collector
[PURI DISTRICT]
Mobile Ph:9937169310
District Disaster Office Ph:06752-222033
Management Authority Name: Shri Prabir Kumar Khilar
Title: Tahasildar
& Mobile Ph:9437314721
Name: Dr. Sarthak Sarangi
Police Department Title: Superintendent of Police
Mobile Ph:8280382804
Office Ph: 06752-225400
Name: Sri Samarth Verma
[SAMBALPUR
Title: District Collector
DISTRICT]
Mobile Ph:9439277733
District Disaster Office Ph:+916632411022
Management Authority Name: Manas Ranjan Swain, Tahasildar, Sadar
Title: Tahasildar
& Mobile Ph:8458074943
Contact Name :Shri Sanjeev Arora
Police Department Mobile Ph:9438054259
Office Ph: 0663-2412330
Name: Shri Madhusudan Mishra
[SONEPUR DISTRICT] Title: District Collector
Mobile Ph: 9437198636
District Disaster Office Ph: 06654-220201
Management Authority Name: Shri Maghabana Bagh
Title: Tahasildar
&
Mobile Ph:9439239020
Police Department Contact Name :Shri Debi Prasad Dash
Mobile Ph:9437224838
Office Ph: 06654-220349

ODISHA WATER RESOURCES DEPARTMENT


CENTRAL PROJECT MANAGEMENT UNIT
Emergency Action Plan
HIRAKUD DAM [OR10HH0003]
LOG SHEET OF CHANGES
The following changes have been made to the EAP and revisions have been provided to the people shown on
the EAP Distribution List

DATE CHANGE MADE SIGNATURE


Update of the entire document, adding new and updated
October notification Flow Charts, inundation maps, including
2018 recurrent flood scenarios and local evacuation plan. David Gonzalez (CPMU
Changes made in overall responsibilities Consultant)

ODISHA WATER RESOURCES DEPARTMENT


CENTRAL PROJECT MANAGEMENT UNIT
Emergency Action Plan
HIRAKUD DAM [OR10HH0003]

1. PURPOSE
The purpose of this Emergency Action Plan (EAP) is to identify emergency situations that could threaten
Hirakud Dam and to plan for an expedited, effective response to prevent failure of the dam and warn
downstream residents of impending danger. This plan defines the notification procedures to be followed in
the event of a potentially hazardous situation. The procedures are intended to protect lives and prevent
property damage from an excessive release of water from the dam spillways or an uncontrolled outflow of
water from the breached portion of dam.

2. DAM DESCRIPTION
2.1. General
Hirakud Dam and Reservoir are owned and operated by Odisha Water Resources Department. It is located
on Mahanadi River in Sambalpur District, approximately 15 km. Northwest of Sambalpur City, Odisha. The
dam was completed in 1957 and was granted to Owner in 1958. The reservoir was constructed to serve as
multiple purposes.

A vicinity map showing the location of the dam is presented in Annexure 1 and its salient features are
summarized in Annexure 2. Inundation maps showing the areas subject to flooding as a result of a dam
failure along with other recurrent flood scenarios are provided in the Annexure 2 (Inundation Maps) of this
document. The inundation area is described in further detail in the Inundation Area Section of this EAP
document (Section 9).

The main dam is 4,800 m. long and it is a combination of concrete gravity, masonry and zoned earth fill
sections (Figure 1). Average height of the dam is 45.75m and maximum height above deepest foundation is
60.96m. The dam is flanked by two earthen dykes. The left dyke is 9,837m. long with 5 gaps and the right
dyke is 10, 759 m. long in one stretch.

The spillways on either side are solid gravity type with ogee crest. The right and left spillway have 24 nos.
and 40 nos. under-sluices of size 3.658 m. x 6.08 m. each, respectively. Besides this, there are radial gates
of 13 nos. on right spillway and 21 nos. on left spillway of size 15.54m x 6.10m each.

Three head regulators are provided from the reservoir for irrigation. They are Bargarh Main Canal, Sason
Main Canal and Sambalpur Distributary having discharge 108.16 m3/s, 17.82 m3/s and 3.59 m3/s,
respectively.

The power dam close to right abutment is provided with 7 nos. of penstocks, 5 nos. of 7.6 m diameter and 2
nos. of 6.1m diameter. The power house is located at the toe of the power dam on the right flank. Full supply
discharge from the Power House-I at Burla is 990.50 m3/s.

ODISHA WATER RESOURCES DEPARTMENT 1| Pag.


Figure 1.- General Layout Hirakud dam

2.2. Reservoir Operations


Hirakud project though conceived as a multipurpose project with an emphasis on flood control, due to acute
shortage of food grains in the country, the priorities of the purposes were changed to the order (i) Irrigation
(ii) flood control (iii) Power generation and (iv) Navigation in the revised project report.

For flood control Hirakud‘s Operator adopt a pre-depletion plan based on the likelihood of flood flows in
the basin. This is achieved through a continuous data acquisition process since the moment of storm formation
till the moment flood‘s waves reach the reservoir, which leads to an increased knowledge and accuracy
during the decision-making process. The following inputs/information is used to support the reservoir
operation

a) Satellite images of cloud formation.


b) India Meteorological Department (IMD) forecast indicating monsoon through, storm track, circulation
etc.
c) Storm characteristics and IMD prediction of QPF.
d) Average rainfall calculated from daily/3 hrly rainfall records of 40 stations in upper stations and 31
stations of lower catchment.
e) Runoff records from gauging stations in upper catchment can give inflow to reservoir 48 hours in
advance, though approximate.
f) Runoff records from gauging stations in upper catchment give inflow records 24 hours in advance of
reaching the dam site. The runoff from lower catchment at delta head can be predicted
approximately from the rainfall records about 60 hours in advance.
g) The releases from upstream reservoirs if intimated in advance will further help the reservoir operation.
h) Rule curve (1988) for Hirakud‘s reservoir (Figure 2), which is aimed to create a cushion for flood
absorption in the beginning of the monsoon season and fill-up the reservoir in 90% of the years by
the end of the flood period.

2| Pag. CENTRAL PROJECT MANAGEMENT UNIT


Emergency Action Plan
HIRAKUD DAM [OR10HH0003]

Figure 2. Rule Curve Hirakud’s Reservoir (1988)

Inundation maps have been obtained for several discharges scenarios from Hirakud‘s spillway, and the
following levels of alert have been determined:
Table 1. Trigger Levels of Alert for Normal discharges of Hirakud’s Spillway

Discharge Discharge Level of


Affected Zones**
(m3/s) Duration (hr.) Alert*
< 5,000 any Blue -
> 5,000 > 100 Orange Zone A
> 10,000 > 50 Orange Zone B
> 10,000 > 80 Red Zone C
> 15,000 any Orange All zones (Zone D)
> 20,000 any Red All zones (Zone D)
* See Chapter 5 ‖Emergency Level Determination‖
**See Table 2 for detailed names of affected CD-Blocks

Table 2.- Affected Zones (CD-Blocks) by Normal discharges of Hirakud’s Spillway

Zone CD Blocks Name


Astaranga, Athagarh, Balianta, Balikuda ,Balipatana, Banki, Baranga, Bhubaneswar, Biridi
Cuttack Sadar, Dampara, Garadpur, Jagatsinghpur, Kakatpur, Kantapara, Marshaghai
Zone A
Niali, Nischintakoili, Nuagaon, Raghunathpur, Salipur, Tirtol, Kendrapara, Derabish, Tangi-
Chowadwar
Zone B Athamallik, Harbbhanga, Narasinghpur, Khandapara
Zone C Zone A+ Zone B + Baramba, Begunia, Ersama, Khurda, Kujanga, Mahakalapara, Tigiria
Angul, Astaranga, Athagarh, Athamallik, Attabira, Balianta, Balikuda, Balipatana, Banki
Zone D
Baramba, Baranga, Begunia, Bhapur, Bherhen, Bhubaneswar, Binika, Biramaharajpur, Biridi,

ODISHA WATER RESOURCES DEPARTMENT 3| Pag.


Bolagarh, Boudh, Cuttack Sadar, Dampara, Ersama, Gania, Garadpur, Gop, Harbhanga, Jatani,
Kakatpur, Kantamal, Khandapara, Khurda, Kujanga, Mahakalapara, Maneswar, Marshaghai,
Narasinghpur, Niali, Nimapara, Nischintakoili, Nuagaon, Pipli, Puri, Raghunathpur, Salipur,
Sambalpur, Sonapur, Tigiria, Tirtol, Ulunda, Badchana, Pattamundai, Kendrapara, Derabish,
Mahanga, Tangi-Chowadwar, Jagatsinghpur, Kantapara, Delanga, Satyabadi.

3. RESPONSIBILITIES
3.1. Dam Owner’s Responsibilities
The Dam Owner, Odisha Water Resources Department is responsible for all dam operation and maintenance.
This EAP is not intended to designate a specific person for a specific responsibility but instead will designate
the person‘s duties or job description for both, before and during an Emergency event (Table 3)
Table 3.- Dam Owner’s Responsibilities

Officer Designation Responsibilities (During Preparedness and Emergency Events)


Preparedness Responsibilities:
- Coordinate routine inspections and Dam‘s operations.
- Ensure effective transmission of hydro-metrological and stream flow data
through different means.
- Ensure proper accessibility to all vulnerable points for constant monitoring
during emergency situations.
- Identify primary and secondary communication systems, both internal
(between persons at the dam) and external (between dam personnel and
outside entities).
- Provide security measures at the dam (CCTV surveillance, security guards,
fencing).
- Ensure the availability of adequate staff at dam site during holidays, nights
and round the clock in weekdays.
- Ensure that the EAP is functional and staffs are familiar with their
responsibilities.
- Ensure that a signboard is installed and clearly visual in different locations at
dam site and operation room, with the most common evidence of distress and
corresponding levels of alert and remedial actions.
Executive Engineer
- Ensure all the equipment/means at dam site to response to an emergency are
(Emergency Planning
easily accessible and well maintained (generators, vehicles, lanterns, radios,
Manager)
heavy equipment, etc)
- Ensure the installation and proper maintenance of a warning system (sirens,
horns) in the critical areas within the floodplain (less than 2 hours of wave
arrival time)
- Ensure the current approved version of the EAP is available to all relevant
stakeholders (those who have a functional role in the emergency response)
- Ensure all necessary means to manage the emergency response are available
and operative in the Emergency Operation Center.
- Participate in exercises for test/improvement of this EAP.
- In charge of organizing publicity at strategic points both in Burla & Hirakud
N.A.C. areas limited for forewarning people on opening of gates.

During Emergency Responsibilities:


- Ensure a continuous and reliable communication with dam site officers
- Receive and assess any distress condition as notified by site engineers,
observer or regular inspection.
- Classify the incident/distress condition reported by the observer into the
different Emergency Levels (Blue, Orange, Red) based on the ANNEXURE 4

4| Pag. CENTRAL PROJECT MANAGEMENT UNIT


Emergency Action Plan
HIRAKUD DAM [OR10HH0003]
(Emergency Level Determination/Action Sheets) and ANNEXURE 2
(Inundation Maps)
- Initiate/implement the Emergency Action Plan and the Emergency Operation
Centre if it is deemed necessary.
- Identify the areas that would be potentially impacted by the emergency
events.
- Provide updates of the situation to the District(s) Disaster Management
Authority to assist them in making timely and accurate decisions regarding
warnings and evacuations.
- Propagate the emergency information to other relevant stakeholders.
- Support the communication needs of local emergency authority.

Preparedness Responsibilities:
- Monitor & surveillance of dam and appurtenant structures looking for
evidence of distress as mentioned in ANNEXURE 4
- Conduct Pre and Post monsoon Inspections under the direction of the
Emergency Planning Manager
- Inform the Emergency Planning Manager about any irregular/unusual
condition at dam site and keep him/her posted about any
progression/change
- Operate dam‘s gates/under sluices, under the express direction of Chief
Engineer/Superintending Engineer/Executive Engineer
Dam Site Engineers
- Conduct routine dam maintenance
(Dy. Executive Engineer,
- Collect instrumentation measurements
Assistant Engineers,
- Ensure effective working conditions of the warning system (Sirens)
Junior Engineers)
- Participate in exercises for test/improvement of this EAP.

During Emergency Responsibilities:


- Monitor de emergency event at dam site and keep posted the Emergency
Planning Manager about any change in the development
- Contact the suppliers/contractors
- Supervise the work of the labour contractors and machineries engaged in the
site for rehabilitation/remedial works
- Conduct the remedial actions as per Action Data Sheets (ANNEXURE 4)

Preparedness Responsibilities:
- Ensure an annual review of the EAP.
- Coordinate the annual / regular testing events of the EAP, such as tabletop
exercises, mock drills, stakeholder‘s consultation.
- Coordinate training events in problem detection, evaluation and appropriate
corrective measures
- Supervise the functioning of control room and ensure to be well equipped with
all type of information to facilitate the rescue and relief operations
- Ensure proper access to site at the earliest possible.
- Ensure that all related machinery/equipment are in running conditions and can
Superintending Engineer be deployed as per requirement at emergency site.
- Formation of Purchase Committee / Committee in consultation with C.E. &
B.M., UMB, Burla for Procurement of Material from Appropriate Source
through Spot Purchase.
- Ensure the correctness of Gauge Discharge sites under his control every year
well before monsoon.

During Emergency Responsibilities:


- Provide decision support and technical support to Emergency Planning
Manager as appropriate.
- Have a constant liaison with Indian Meteorological Department (IMD) during

ODISHA WATER RESOURCES DEPARTMENT 5| Pag.


emergency periods related with flood events.
- Advise the Emergency Planning Manager of the emergency level
determination, if time permits.
- Disseminate information and make contact to utilize media as appropriate at
the time of emergency on behalf of Chief Engineer, Upper Mahanadi Basin,
Burla.

Preparedness Responsibilities:
- Assist the Dam Owner‘s officers in preparation of Action Data Sheets
(ANNEXURE 4)
- Recommend specific actions in order to improve the readiness of emergency
actions
- Support and Monitor the remedial construction activities such as earth moving,
especial investigations, etc.
- Decide depending upon the quantum of repair/reconstruction work, whether
the work is to be got executed through large construction firms or purely
through the department or small contractors.
- Undertake an engineering assessment of the safety hazard at the dam in
collaboration with the State Dam Safety Organization
Chief Engineer
During Emergency Responsibilities:
- Advice the dam‘s Emergency Planning Manager/Superintending Engineer with
the emergency level determination, if time permits.
- Advice the dam‘s Emergency Planning Manager/Superintending Engineer with
remedial actions to take if Blue/Orange events occurs, and if time permits.
- Direct specific and appropriate procedures to open/close the spillway‘s gates
during the reservoir operation.
- Play the role of ―Public Affair‘s Officer‖ in case external/public notifications
should be released.
- Keep close watch on the different activities being carried out by different
agencies at the time of emergency

3.2. Dam Safety Organization’s Responsibilities


The following are the basic emergency planning and response roles and responsibilities for the dam safety
authorities (State and National level). The Dam Safety Organization (DSO) is the first point of contact for
BLUE alert

 Is responsibility of the Dam Safety Organizations undertaking an engineering assessment of the


safety hazard at the dam.
 The DSO may inspect the Dam at its discretion and inform the Emergency Planning Manager if
Hirakud‘s dam is considered to be at BLUE alert.
 The DSO may advise the Dam Owner/Emergency Planning Manager of remedial actions to take if
BLUE/ORANGE events occur.
 The DSO may have an active role in ORANGE/RED levels of alert. The DSO may advise the Dam
Owner/Emergency Planning Manager of the emergency level determination.
 A DSO‘s officer may be called on to be the Subject Matter Expert at the Emergency
Operation/Response Center.
 The DSO is responsible for reviewing and accepting the Emergency Action Plan, before its final
publication.

6| Pag. CENTRAL PROJECT MANAGEMENT UNIT


Emergency Action Plan
HIRAKUD DAM [OR10HH0003]
 Odisha Dam Safety Organization shall constitute a Dam Safety Review Panel consisting of engineers,
geologist and hydrologist to analyse the distress conditions of Dam periodically.
 Support for the preparation of asset management plans, emergency preparedness plans, emergency
warning systems, flood plain mapping, preparation of flood inundation maps in different areas for
lower Mahanadi Basin and downstream impact mitigation measures
 Focus on legal, regulatory and technical frameworks for dam safety assurance
 Participate/Conduct a public hearing program before finalization of the Emergency Action Plan

3.3. Responsibilities for Notification


After an event level has been determined appropriate notifications should be made in accordance with the
corresponding notification Flow Chart provided in this EAP (See Notification FlowCharts Tab). These
Notification Flowcharts list the names and contact information and identifies who is to be notified of a dam
safety incident, by whom, and in what order. Alternate contacts and their confirmed telephone number is also
listed, in case primary contact is unavailable. Each official listed in the notification flowcharts should be
familiar with it and immediately notify the Emergency Planning Manager in case of cessation of his/her
functions within the organization.
Table 4.- Responsabilities for Notification

Officer Designation Responsibilities During Emergency Events


- Notify the District Disaster Management authorities (District Collector) in case
of Orange/Red alert
- Notify the District Authorities about any emergency response actions at dam
site and their impacts in the downstream area (e.g. large releases)
Executive Engineer - Assist the District Collectors/relief Authorities involved in the emergency
(Emergency Planning response actions with information about condition at dam site
Manager) - Where the residences located immediately downstream of a dam that would
be inundated within minutes of a dam failure, wherein the available warning
time is very limited, in that cases, Emergency Planning Manager will arrange
to notify the residences directly without waiting for the local administration to
act upon before an emergency situation develops.
Dam Site Engineers
- Keep inform the Emergency Planning Manager about the progress of the
(Dy. Executive Engineer,
situation at dam site
Assistant Engineers)
- Notify dam safety Organization and request technical advice as per required
- Notify/inform higher authorities on the mishap as per notification flow chart
of particular alert level as per situation at site.
Superintending - Notify/inform media representatives about the emergency situation.
Engineer/ Chief Engineer - Define emergency situations for which each medium will be utilized and
include an example of a news release that would be the most effective for
each possible emergency, avoiding disseminate false/overstated messages
among the population.
- Implement the Notification Flow chart for regional and State Disaster
Management Contacts
- Contact Local Law Enforcement Authorities and Relief Authorities under their
District jurisdiction
Collector(s)/District - Liaising and coordinating with Early Warning Agencies like IMD, CWC,
Disaster Management INCOIS, etc. for disaster specific information and disseminating the
Authority information for coordinating with the State Govt. and facilitating the
deployment of NDRF in the disaster affected districts during disaster
- Issue public announcements in coordination with Dam Owner‘s officials and
media representatives about the status of the emergency event

ODISHA WATER RESOURCES DEPARTMENT 7| Pag.


- Notify downstream residents in vulnerable areas
- Provide to the District Disaster Management Authority precise and accurate
Relief Authorities (Police
feedback information about the progress of relief actions and advise when
Department, Civil
the emergency can be terminated
Defense, Army Forces)
- Notify to their corresponding command the necessity to deploy more
resources to attend the rescue and relief actions.
- Disseminate wide public awareness during emergency condition of Dam
through Social Media Platform such as Facebook, Twitter, Whatsapp &
Instagram.
- The news media, including radio, television and newspapers, should be
Media Representatives utilized to the extent available and appropriate.
- Pre-plan in coordination with Chief Engineer/Superintending Engineer the
most effective way to disseminate the most delicate and common emergency
situations among the population. Pre-defined news shall be available in order
to improve readiness of the decision-making process

3.4. Responsibilities for Evacuation


Evacuation and relief actions are exclusive responsibilities of Districts Authorities, and emergency relief forces
at local and state level. For Hirakud Dam, a total of 13 Districts would be directly affected by a potential
failure/emergency event at the dam site, and therefore, each district‘s representative is responsible for
evacuation/relief actions in their jurisdiction.
Table 5. Districts potentially District Collector(s) acting as District’s Disaster Management Authority is
affected by an Emergency
Event in Hirakud Dam responsible to coordinate actions along with the following specialised
S.I. District name teams/forces: Police and Fire Departments, National Disaster Management
No. Authority (Response Force), Civil Defense, Army Forces.
1 Angul
Within their responsibilities are:
2 Baragarh
3 Boudh UNDER NO EMERGENCY (Preparedness)
4 Cuttack  Participate in review, updates and exercises of the EAP
5 Dhenkanal  Dissemination among the population making them aware about their
6 Jagatsinghpur own risks.
7 Jajpur  Conduct training/education programs among the population in regard
how to act before, during and after emergency events such as flash
8 Kendrapara
floods.
9 Khordha
10 Nayagarh UNDER ORANGE ALERT
11 Puri 
Prepare emergency response personnel for possible evacuations that
12 Sambalpur may be needed if a RED alert is declared.
13 Sonepur  Provide resources as necessary to the dam owners.
 Serve as the primary contact responsible for coordination of all
emergency actions for potentially affected communities.
 Consider drafting a State of Local Emergency in preparation for RED alert.
 Maintain close liaison with the district and the State Governments as well as the nearest units of Armed
Forces/Central police organizations and other relevant Central Government organizations like Ministries
of Communications, Water Resources, Health, Drinking Water, Surface Transport, who could supplement
the efforts of the district administration in the rescue and relief operations
 Decide in coordination with the Emergency Planning Manager when to terminate the Emergency.

8| Pag. CENTRAL PROJECT MANAGEMENT UNIT


Emergency Action Plan
HIRAKUD DAM [OR10HH0003]
UNDER RED ALERT

 Initiate warnings and order evacuation of people under vulnerable areas as per inundation maps
(ANNEXURE 2)
 Direct local emergency response services (may include local law enforcement) to carry out the
evacuation of people and close roads/crossings within the evacuation area (see local Evacuation Plan,
ANNEXURE 2 and ANNEXURE 3 tables).
 Declare a State of Local Emergency if required.
 Provide resources as necessary to the dam owners.
 Decide in coordination with the Emergency Planning Manager when to terminate the Emergency

Police Department(s) Responsibilities

 Warn the public under vulnerable areas in their jurisdiction as per inundation maps (ANNEXURE 2).
 Secure and control access to evacuated areas.
 Install barricades in the affected bridges and crossings as per Table 9 and ANNEXURE 2 flood
hazard values
 Assist in conducting rescue and recovery operation as required.
 Ensure proper access to the emergency services
 Prioritize the vehicle movement to the emergency site
 Control the traffic and divert through alternative routes.
 Ensure no unauthorized persons entering into the emergency site.
 Permit with minimum delay the entry of authorized personnel and recognized outside agencies,
vehicles etc. involved in the emergency operations that come to help.
 Any other responsibility as entrusted by the high officers.

Fire Department(s), Army & Navy Forces Responsibilities

 Assist in evacuation operations and initiate the evacuation of impact areas in cooperation with
Emergency Management Agency and Police Department.
 Request mutual aid for boats and initiate rescue of trapped residents as needed.
 Supply special equipment/teams to support rescue operations (e.g. Helicopters, divers, off-road and
amphibious vehicles)

3.5. Responsibilities for Termination and Follow-Up


Once EAP operations have begun under BLUE, ORANGE or RED alerts levels, the EAP operations must
eventually be terminated and follow-up procedures completed. EAP operations can only be terminated after
completing operations under RED or BLUE alert levels. If ORANGE Event Level is declared, the operations
must be designated RED Event Level or BLUE before terminating the EAP operations.

Please check the Action data Sheets (ANNEXURE 4) for further details in when to declare an emergency
event terminated. Table 6 below shows the main responsibilities in the termination and follow-up process.

ODISHA WATER RESOURCES DEPARTMENT 9| Pag.


Table 6.- Termination and Follow-Up Responsibilities

Officer Designation Responsibilities (Termination and Follow-up)


- Declare the termination of the emergency operations in coordination with
District Disaster Management Authority and Relief/Response Forces.
- Conduct a review process of the EAP procedures.
- Identify EAP procedures that were followed effectively, as well as any ways
Executive Engineer that the EAP could be improved.
(Emergency Planning - Identify the causes that could have triggered the emergency event and
Manager) propose actions to improve readiness and early detection. Support from the
Dam Safety Organization may be requested in this regard
- For Major Emergencies, the Emergency Planning manager will maintain
detailed records of cost expended and will prepare a detailed report in this
regard. (See Section 7.3 “Reports”, page 16)
- Ensure that all parties that participated in the EAP activities are involved in
the review process.
- Impose a time frame within which the EAP review is to be completed.
Superintending - Propose any ways that the EAP could be improved.
Engineer/ Chief Engineer - Present the final results of the EAP evaluation in a documented report to the
Principal Secretary of Odisha Water Resources Department.
- Ensure that there is no danger of spread of any epidemics or water borne
diseases after the floods.
- Identify in coordination with the Emergency Planning Manager the causes that
Dam Safety
could have triggered the emergency event and propose actions to improve
Organization (State /
readiness and early detection. A report should be presented to the dam
Central level)
owner‘s authorities in this regard.
- Declare the termination of the emergency operations in coordination with
District(s) - All districts -
Emergency Planning Manager and Relief/Response Forces.
and National Disaster
- Identify EAP procedures that were followed effectively, as well as any ways
Management Authority
that the EAP could be improved.

4. COMMUNICATIONS NETWORKS
Every monsoon Hirakud Dam Project authority, in coordination with Orissa Police Department, will set up
temporary wireless communication network between eleven gauging stations (seven upstream and four
downstream) with the central station at Burla, close to flood control room.

Local officials and downstream residents will be notified by landline telephone, if available; otherwise via
cell phones or emergency personnel (in person or using their radios). The various networks for emergency use
include the networks of the following:

• Flood Control Room, Burla


• Indian Meteorological Department
• Central Water Commission
• All affected Districts Police and Fire Departments (See Table 5)
• Odisha Disaster Management Authority
• Army/Navy Forces

Sample public announcements appear in ANNEXURE 6 and internal suggested phone messages are also
available in each notification flow chart. Verification or authentication of the situation can be made by
contacting the Emergency Planning Manager and the corresponding district disaster management officials
(See District-wise Notification Flow Charts Tab). Television, Radio and bulk SMS facilities of the local
Mobile Network Operators can be used as much as possible to notify area residents of the possible dangers.

10| Pag. CENTRAL PROJECT MANAGEMENT UNIT


Emergency Action Plan
HIRAKUD DAM [OR10HH0003]
As per notification responsibilities (Section 3.3) public announcements are to be issued by the concerned
District Disaster Management officials and the Chief Engineer & Basin Manager, Upper Mahanadi Basin,
Burla in coordination with media representatives.

5. EMERGENCY DETECTION, EVALUATION, AND CLASSIFICATION


5.1. Emergency Detection
5.1.1. Situations
Many dam conditions can lead to emergency situations, not all of which will require the implementation of the
EAP. However, if any of them occur, the appropriate actions must be taken. ANNEXURE 4 of this EAP shows
the most common emergency situations that may emerge in Hirakud Dam and appurtenances, along with the
corresponding specific actions to be done by each of the dam‘s officials. Some of these emergency situations
are summarized as follows:

• Severe Storms/Inclement Weather: Although generally not in themselves a threat to the dam, severe
storms and other inclement weather conditions can contribute to an existing problem and hinder any
remediation efforts. Severe storms also cause the uncontrolled release of floodwater, and increase
flow in already rain-swollen areas.
• Tropical cyclones: Tropical cyclones do occur in the area, with the potential for structural damage to
the dam, possibly resulting in its failure. If a tropical cyclone has struck in the area, an inspection of
the dam for any signs of damage will be appropriate.
• Earthquakes: Hirakud dam is located in the Seismic Zone Number III. This zone is classified as
Moderate Damage Risk Zone which is liable to MSK VII. and also 7.8. The IS code assigns zone
factor of 0.16 for Zone III. Therefore, an earthquake is a possibility, and appropriate post-
earthquake inspections should be performed.
• Sabotage: A threat to damage the dam has been made. Appropriate actions must be taken to
protect the dam.

5.1.2. Signs of Failure


Site engineers in coordination with the Executive Engineer (Main Dam Division) are responsible for conducting
routine inspections and identifying conditions that could indicate the onset of problems leading to a dam
failure. The early identification of potentially dangerous conditions can allow time for the implementation of
the EAP. The following sections describe some of the different types of failure which could lead to a dam
failure.

• Seepage Failure: Although all earthen embankments allow some minor seepage through the dam or
the foundation, excessive, uncontrolled seepage can result in piping (the movement of embankment
material in the seepage flow) and lead to failure. Piping can occur for years at a slow rate. If the
piping has progressed to a dangerous level, it will be evident by increased flow or the discharge of
muddy water (or both). At that stage, immediate action to stop the piping is needed. Fully developed
piping is difficult to control and is very likely to result in failure. A whirlpool in the reservoir is a sign
of uncontrollable piping and necessitates immediate emergency action.
• Embankment or Foundation Sliding: Sliding is usually first apparent when cracks or bulges in the
embankment appear. Slides with progressive movement can cause failure of the embankment.
• Structural Failure: The structural failure or collapse of any non-overflow portion of the dam, spillway
or spillway gates could result in loss of the reservoir. A structural failure of a portion of the spillway
could cause piping and possibly embankment failure.

ODISHA WATER RESOURCES DEPARTMENT 11| Pag.


• Overtopping Failure: Overtopping of the embankment results in erosion of the dam crest. Once erosion
begins, it is very difficult to stop.

5.2. Emergency Evaluation and Classification


This section lists the conditions and actions which may be used to classify the level of emergency response, as
a guide for the Emergency Planning Manager (Executive Engineer, Main Dam Division). Specific dam
observations and corresponding emergency classification levels can be found in ANNEXURE 4, along with
appropriate and recommended actions to follow in each case.

Internal Alert Condition BLUE – A ―watch‖ condition. A problem has been detected at the dam that requires
constant monitoring. At this time, the distress condition is manageable by dam personnel. The Emergency
Planning Manager (Executive Engineer, Main Dam Division) along with the support of site engineers will be
responsible for monitoring and repair as soon as possible and implementing the appropriate Notification
Flowchart. The following is a list of conditions that would initiate this condition:

• Cloudy or dirty seepage or seepage with an increase in flow, boils, piping, or bogs
• Large sinkholes with corresponding seepage anywhere on the embankment or downstream from the
toe.
• Any slide that degrades the crest of the embankment or that is progressively increasing in size
• Cracking or movement of any concrete structure
• An increase in the reservoir level leading to engagement of the spillway gate‘s
• Exceptionally heavy rainfall in the catchment of the dam reservoir

External Alert Condition ORANGE – This is indicative of a dam condition that is progressively getting worse;
and there is a high probability of dam failure. Although there is no immediate danger, the dam could fail if
conditions continue to deteriorate. The Emergency Planning Manager (Executive Engineer, Main Dam Division)
will be responsible for initiating immediate repairs, including lowering the reservoir if appropriate and
implementing the appropriate Notification Flowchart. The following is a list of conditions that would initiate
this condition:

• Any spillway‘s release matching with an ORANGE alert in accordance with the Table 1 (Trigger
Levels of Alert for Normal discharges of Hirakud’s Spillway)
• Large boils, increasing in size and flow rate, especially if there is flowing muddy water
• Significantly increasing seepage, especially flowing muddy water
• Slides involving a large mass of material that impairs the crest of the dam and is continuing to move
• Sinkholes with seepage flowing muddy water
• Large cracks, movement or failure of a portion of any major concrete structure that forms an integral
part of the dam
• An increase in the reservoir level to near the top of the dam
• Near to ‗Design Flood‘ inflow forecast

External Alert Conditions RED – These are ―failure‖ conditions. Either the dam is in immediate danger of
failing or has already failed. No time remains to implement measures to prevent failure. Evacuate
immediately. Evacuation efforts will continue until the situation is stabilized. The Emergency Planning Manager
(Executive Engineer, Main Dam Division) is responsible for implementing the appropriate Notification
Flowchart. The following is a list of conditions that would initiate ―imminent dam failure‖ or ―dam failure‖
conditions:

• Any spillway‘s release matching with a RED alert in accordance with the Table 1 (Trigger Levels of
Alert for Normal discharges of Hirakud’s Spillway)

12| Pag. CENTRAL PROJECT MANAGEMENT UNIT


Emergency Action Plan
HIRAKUD DAM [OR10HH0003]
• Rapidly increasing boils or the presence of new, significantly flowing boils, particularly muddy ones
near previously identified ones.
• Rapidly increasing seepage, especially flowing muddy water
• Slides involving a large mass of material or which have degraded the crest of the embankment to a
level that approaches the water surface level, or if significant seepage is observed through the slide
area
• Settlement that is predicted to degrade to the reservoir level
• Cracks that extend to the reservoir level
• Significant movement or failure of any structure that forms an integral part of the dam
• Overtopping of the earthen dam
• Uncontrollable release of the reservoir

5.3. Previously Known Problems


Insufficient Discharge Capacity: Design Flood has been revised and a PMF with a peak value of 69,632 m3/s
was accepted by CWC in 1997. However, the current discharge capacity of the spillways and under sluices
is only 42,450 m3/s, which is around 27,000 m3/s below the vetted design flood. Currently, the provision of
an additional spillway with a discharge capacity of 9,000 m3/s is under process.

Seepage: There are four (4) seepage locations in Left Earth Dam and six (6) in Right Earth Dam. There are 57
nos. of seepage locations in Left Dyke. ‗V‘ notches have been fixed in the cross drains leading from the toe of
the Dam and Dykes. As per report of the Chief Research Officer, Hirakud Research Officer, Hirakud, the
seepage of the dam is well under permissible limit

Instrumentation: Several instruments are not in working conditions (cross arms, base plates, piezometers), which
stop de possibility to monitor the dam performance in a proper way.

Erosion: Small erosion in the Hirakud Dam energy dissipation bucket has been observed, which is visually
inspected in regular basis

Cracks/Structural Concerns: cavities and cracks have been detected in blocks of the left and right spillway, as
well as in the power dam.

6. PREPAREDNESS
Preparedness actions are to be taken both before and following the development of emergency conditions
and should identify ways of preparing for an emergency, increasing response readiness in a uniform and
coordinated manner, and helping to reduce the effects of a dam failure. The following are some steps that
could prevent or delay failure after an emergency is first dis-covered.

6.1. Surveillance
Round the clock surveillance at the dam and its appurtenant (on the rim of reservoir (left & right)) will be
carried out by site engineers during emergency situations. For this, the posting of special observer of high
experience and keen observation is an important requirement of EAP during high flood period. To ensure that
the whole system (including civil structures & mechanical installations) is being maintained well upto
satisfactory level, the repair maintenance must be carried out as per requirement of O & M of Hirakud Dam.
In addition it must be ensured that maintenance and upkeep of different components is carried out and will
be only possible through deployment of well procedure conversant and trained staff. The list of such persons
should be displayed on a photo frame mounting at convenient safe places at dam site and list of local
telephone numbers inside the dam & outside the dam area. It will be updated from time to time for any
change.

ODISHA WATER RESOURCES DEPARTMENT 13| Pag.


6.2. Response on forecast of excessive inflow
There are more than 200 rain gauge stations existing in Mahanadi basin, which are maintained by different
agencies I.M.D. Out of these around 100 stations are located in upper Mahanadi basin upstream of Hirakud
dam. But no data on real time basis, except in respect of stations maintained by Hirakud Dam Project (HDP)
and Central Water Commission (CWC), is obtained for used in operation of Hirakud reservoir and flood
forecasting.

Hirakud dam project maintains total 11 nos, gauging stations out of which 7 nos. are in upstream and 4 nos.
are in downstream of Hirakud dam. All these eleven stations are river gauge and rain gauge stations. All
stations are ordinarily rain gauge stations and operative only in monsoon period. Normally only gauges are
observed every 3 hours; in high flood periods hourly gauges are observed and transmitted through wireless
network installed through State Police. Discharge observation is made in specific stations at intervals. Rainfall
observations are twice in a day at 8.30hr. Stage discharge curve developed for each site are used for flood
forecasting. In addition, two (2) gauge stations are established in Kheruwal (Bheden river) and Patharla (Tel
river) for observations only.

Subsequent to devastating floods of 1982, the Mahanadi Division, Burla was established by C.W.C. in
Sept.1983, at the request of Govt. of Orissa, for flood forecasting in Mahanadi basin. C.W.C. maintains river
gauge network of 32 sites spread over the whole basin out of which 28 sites are under Brahmani, Mahanadi
Division Burla, one under Eastern River Division Bhubaneswar and three sites under Brahmani, Subarnarekha
division, Bhubaneswar. Discharge observations are made at 22 sites. Silt observation are conducted at 13
sites/. Gauge are observed hourly in monsoon period and thrice daily in non-monsoon period. Discharge is
observed once daily on all working days. Silt is observed once daily in monsoon and once every week during
non-monsoon.

Out of 34 gauge stations over the basin for which data are available with C.W.C., 33 stations are
maintained by C.W.C. and one by F.M.D.(IMD). Eleven of these are equipped with S.R.R.G as well as O.R.G.
Rainfall observations are conducted every 3 hourly at most of the stations under C.W.C.

Rainfall data of Burla (HDP) and Hirakud (IMD) is received once daily at 8.30 hrs. mostly at a later either by
telegram, police wireless or post.

6.3. Response during weekends and holidays


The Standard Operating Procedure with Reservoir Operation & Maintenance Manual and Gate Operation
Manual are strictly followed throughout the year whether it is weekends/holidays/night. Executive Engineer
(Main Dam Division) will be available for emergency response during weekends and holidays and can be
present at the dam site within 15 minutes of detection of an emergency condition. In case of non-availability
of the Executive Engineer (Main Dam Division), the Assistant Executive Engineer or Deputy Executive Engineer
will take his responsibilities.

6.4. Response during periods of darkness and adverse weather


The Executive Engineer (Main Dam Division) and Site Engineers will arrange for access to generators and lights
to adequately monitor the situation. Site Engineers will ensure the generators and emergency light are well
maintained and available under any circumstances. Executive Engineer (Main Dam Division) will be able to
access the site during adverse weather conditions by off road vehicle.

14| Pag. CENTRAL PROJECT MANAGEMENT UNIT


Emergency Action Plan
HIRAKUD DAM [OR10HH0003]
6.5. Access to the site
The following accesses to the dam are available, and depending of the emergency situation some of them
should be used with caution or totally avoided (See Table 7 and ANNEXURE 1. Vicinity Map)
Table 7. Condition of Accesses to Hirakud Dam under Emergency Conditions

Spillway Discharge/Emergency Condition


Approx. Above
From Access Description Under Main Dam
Distance 20,000
20,000 m3/s Failure
m3/s

NH No-6 to Chandlidungri Hill left Use with


Burla 6 km. Safe to use NOT SAFE
toe to Dam Site Caution

From NH No-6 to Laxmidungri Hill


Use with
Hirakud toe through Hirakud town to Dam 7 km NOT SAFE NOT SAFE
Caution
site (
Jharsuguda road to Pradhanpali to
Jharsuguda Jamadarpali to Dam site through 17 km. Safe to use Safe to use Safe to use
Left Dyke
Bargarh road to Lahanda to
Godbhaga through Right Dyke to 20 km. Safe to use Safe to use Safe to use
Dam site
Bargarh
Bargarh road to Debrigarh
Sanctuary via Dunguri Mines to 30 km. Safe to use Safe to use Safe to use
Dam site

6.6. Remedial Actions


Preparedness and remedial actions can be taken in an emergency to prevent the catastrophic failure of the
dam, but such repairs should be undertaken with extreme caution. The repairs are only temporary, and a
permanent repair should be designed by an engineer as soon as possible.

Specific actions for different emergency situations are described in the ANNEXURE 4 (Action Data Sheets),
which can be used in conjunction with Annex Table I.- Emergency Level Determination - Action Data Sheet
Index). Examples of the actions to be taken for dam‘s officials under the direction of a professional engineer
or contractor are described below. In all cases, the appropriate Notification Flowchart must be implemented
and the personnel of the Odisha Dam Safety Organization be notified.

Consider the following remedial actions if the dam‘s integrity is threatened by:

Seepage Failure

• Plug the flow with whatever material is available (hay, bentonite, or plastic) if the entrance is in the
reservoir.
• Consider lower the water level in the reservoir
• Place an inverted filter (a protective layer of sand and gravel) on the exit area to hold the material
in place.
• Continue operating at a lower level until a repair is made.

Embankment or Foundation Sliding

• Lower the water level in the reservoir to an elevation considered safe, given the slide condition.

ODISHA WATER RESOURCES DEPARTMENT 15| Pag.


• Stabilize the slide, if on the downstream slope, by weighting the toe area below the slide with soil,
rock, or gravel.
• Continue operating at a lower level until a repair is made.

Structural Failure

• Implement temporary measures to protect the damaged structure, such as placing rock riprap in the
damaged area.
• Lower the water level to a safe elevation through the low flow outlet.

7. SUPPLIES AND RESOURCES


7.1. Contracts
If Hirakud Project‘s personnel and resources prove to be inadequate during an emergency, requests will be
made for assistance from other local jurisdictions, other agencies, and industry, as needed. Such assistance
may include equipment, supplies, or personnel. All agreements will be entered into by the following
authorized officials, as deemed necessary to prevent the failure of the dam:

• Emergency Planning Manager (Executive Engineer, Main Dam Division)


• Superintending Engineer, Hirakud Dam Circle
• Chief Engineer & Basin Manager, UMB

7.2. Equipment and Supplies


Equipment that is available for use and local contractors that can be contacted to provide equipment during
an emergency event are listed in ANNEXURE 5.

7.3. Reports
Pre-monsoon and post-monsoon inspections of the dam are made every year during the month of May and
December respectively by the Site Engineers in coordination with the Emergency Planning Manager (Executive
Engineer, Main Dam Division) to evaluate its structural safety, stability, and operational adequacy. In the event
of an abnormal occurrence, reference to these reports, particularly the photographs, can be beneficial in the
evaluation of a potential problem.

Technical records such as drawings and inspection reports are stored and carefully maintained at the Control
Room in dam site and in the Emergency Planning Manager’s Office. Site Engineers are familiar with the location
of the documents in the event of an emergency situation.

8. EMERGENCY OPERATIONS CENTRE


8.1. Activity log
Any unusual or emergency condition should be documented, including the following:

• Activation or deactivation of emergency facilities


• Emergency notifications to other local governments and to state and central government agencies
• Significant changes in the emergency
• Major commitments of resources or requests for additional resources from external sources
• Telephone calls will be recorded in chronological order

16| Pag. CENTRAL PROJECT MANAGEMENT UNIT


Emergency Action Plan
HIRAKUD DAM [OR10HH0003]
• Issuance of protective action recommendations to the public
• Evacuations and casualties
• Termination of the incident

8.2. Costs of the Emergency Operations Centre


For major emergencies, the emergency operations centre will maintain detailed records of costs expended.
These records may be used to recover costs from the responsible party or insurers, or as a basis for
requesting financial assistance for certain allowable response and recovery costs from the state or central
government. Documented costs should include:

• Personnel costs, especially overtime


• Equipment operation
• Equipment leasing and rental
• Contract services to support emergency operations
• Specialized supplies expended in emergency operations

9. INUNDATION AREA
Inundation maps in ANNEXURE 2 illustrate the areas subject to flooding from a failure of the main dam and
others recurrent flood scenarios (Table 8). The maps were prepared using the results of a two-dimensional
flow analysis and contain profiles of the peak flood levels expected, as well as an estimation of the time
from the beginning of the breach to the moment the location start to be inundated. More hazard reference
values such as depth, velocity, vulnerability, and water surface elevation are included in ANNEXURE 2 in
both, tabular and map format for each of the affected locations
Table 8.- Scenarios included in the Emergency Action Plan

Annexure No. Scale


Scenario Hazard Parameters
Index Tiles (A0 Size Sheet)
Vulnerability, Depth, Velocity, Arrival Time, Water
2-A Overtopping Failure 24 1:35,000
Surface Elevation (WSE)
2-B Revised PMF Flood Routing Vulnerability, Arrival Time, WSE 22 1:35,000

2-C Discharge 40,000 Cumecs Vulnerability, Arrival Time, WSE 22 1:35,000

2-D Discharge 30,000 Cumecs Vulnerability, Arrival Time, WSE 22 1:35,000

2-E Discharge 20,000 Cumecs Vulnerability, Arrival Time, WSE 18 1:35,000

2-F Discharge 15,000 Cumecs Vulnerability, Arrival Time, WSE 18 1:35,000

2-G Discharge 10,000 Cumecs Vulnerability, Arrival Time, WSE 16 1:35,000

2-H Discharge 5,000 Cumecs Vulnerability, Arrival Time, WSE 14 1:35,000

After examining the results of the breach analysis of Hirakud Dam, it has been determined that there were a
significant number of structures that could be affected due to a large discharge from the spillways or dam
breach scenario. These structures are located along the river Mahanadi and its tributaries, such as Jira, Ong,
Tel, Harihara Jora, and Surubali rivers. The most important crossing structures, susceptible to the failure
scenario, are summarized in the Table 9 below and are labelled in the ANNEXURE 1 (Vicinity Map).
Hazard reference values (water surface elevation, depth, velocity, arrival time and vulnerability) for each of
these structures are summarized in the ANNEXURE 2 tables along with the inundation maps for each case.

ODISHA WATER RESOURCES DEPARTMENT 17| Pag.


Table 9.- List of Main Crossing Structures The potential consequences either due to a hypothetical
See Map Tile breach scenario of Hirakud Dam or due to a large
District Bridge Name/Location ID No.
(Annexure 1)
controlled release from the spillways (> 20,000 m3/s)
Angul Boudh No. 2 involve all the districts located downstream the dam in
Barang Canal No. 4 the lower Mahanadi basin, until the delta area, in the
Cuttack - Trisulia No. 4
Gandarpur No. 4 mouth of the Mahanadi river into the Bay of Bengal. The
Kathjodi No. 4
Kathjodi Railway No. 4
Community Development Blocks (C.D Blocks) which can
Khuakhai No. 4 suffer a significant impact are listed in the Table 10
Cuttack Kuakhia No. 4
Madhusudan No. 4 below.
Mahanadi Barrage Road No. 4
Mahanadi Sikharpur No. 4 The most affected areas in a failure scenario are those
Mundali No. 4
Sidhamula No. 3 located near the river banks where the hydraulic
Subarnapur No. 4 conditions are extreme. A total area of 6,166 Km2 will
Padamala No. 3 & 4
Khordha Palasuni No. 4 be approximately affected in the downstream districts
Sambalpur
Burla No. 1 (excluding the river bed).
Chaurpur No. 1
Binka No. 2
Mahanadi/Sonepur A vulnerability approach has been used to determine a
No. 2
Sonepur Ong general classification of severity or flood hazard on the
No. 2
Tel Nadi No. 2
Ong Lachipur floodplain. The thresholds shown in Figure 3 and Table
No. 2
11 intent to relate the vulnerability of the community
when are interacting with the floodwaters, however factors like isolation during a flood, effective warning
time, rate of rising of floodwater and time of the day play important roles that shall be considered by the
relief authorities.

Table 12 includes the district-wise total affected area within each hazard-vulnerability classification, which
can help/assist district authorities to prioritize in identifying critical infrastructure and sites with population at
risk that may require protective measures and warning and evacuation planning. This Table can be used
along with inundation maps included in ANNEXURE 2.

The vulnerability to hazard will also be influenced by whether the primary consideration is either the strategic
land use planning aimed to ensure that the land use is compatible with the flood risk or assessing
development proposals or emergency management planning aimed to address residual flood risks.
Table 10.- Affected C.D Blocks within the Inundation Area (Failure Scenario)
See Map Tile ID No.
District Community Development Block (C.D. Block)
(Annexure 2-A)
Angul Angul, Athamallik Nos. 6, 7, 8
Baragarth Attabira, Bherhen Nos. 2, 3
Boudh Boudh Harbhanga, Kantamal Nos. 4, 5, 6, 7, 8
Salipur, Athagarh, Banki, Baramba, Cuttack Sadar, Dampara, Kantapara, Narasinghpur, Nos. 8, 9, 10, 11, 12, 13,
Cuttack
Nischintakoili, Tigiria, Mahanga, Tangi-Chowadwar, Baranga, Niali 14, 18, 19, 20, 21
Dhenkanal Dhenkanal Nos. 12, 15, 16
Jagatsinghpu
Balikuda, Biridi, Ersama, Jagatsinghpur, Kujanga, Raghunathpur, Tirtol Nos. 15, 19, 20, 21, 23, 24
r
Jajpur Dharmasala, Badchana, Bari Nos. 14, 18
Kendrapara Pattamundai, Garadpur, Mahakalapara, Marshaghai, Rajnagar, Aali, Kendrapara, Derabish Nos. 18, 22, 23
Nos. 11, 12, 13, 15, 16,
Khordha Balianta, Balipatana, Begunia, Bhubaneswar, Bolagarh, Jatani, Khurda
19, 20
Nayagarh Bhapur, Gania, Khandapara, Nuagaon Nos. 8, 9, 10, 11
Puri Satyabadi, Astaranga, Delanga, Gop, Kakatpur, Nimapara, Pipli, Puri Nos. 16,17, 20, 21
Sambalpur Jujumara, Maneswar, Rairakhol, Sambalpur Nos. 1, 2, 3, 6
Sonepur Binika, Biramaharajpur, Sonapur, Ulunda Nos. 3, 4, 5, 6

18| Pag. CENTRAL PROJECT MANAGEMENT UNIT


Emergency Action Plan
HIRAKUD DAM [OR10HH0003]

Figure 3.- Vulnerability Zones (Smith et al., 2014)


Table 11.- Vulnerability Thresholds Classification Limits . (Smith et al.,
2014)

Classification Limiting
Hazard Limiting
Limit Water
Vulnerability Description Velocity
Depth
Classification (Depth *
(m/s)
Velocity) (m)

Generally safe for vehicles, people


H1 D*V < 0.3 0.3 2.0
and buildings.
H2 Unsafe for small vehicles. D*V < 0.6 0.5 2.0
Unsafe for vehicles, children and the
H3 D*V < 0.6 1.2 2.0
elderly.
H4 Unsafe for vehicles and people. D*V < 1.0 2.0 2.0
Unsafe for vehicles and people. All
buildings vulnerable to structural
H5 D*V < 4.0 4.0 4.0
damage. Some less robust buildings
subject to failure.
Unsafe for vehicles and people. All
H6 building types considered vulnerable D*V > 4.0 - -
to failure.

Table 12.- District-wise Hazard Vulnerability Classification for Failure Scenario Hirakud Dam

Hazard Vulnerability Classification (Area in Ha.) Total Area


District H1 H2 H3 H4 H5 H6 (Ha.)
Angul 165 213 717 689 1,706 13,307 16,798
Baragarth 85 89 1,915 1,276 2,997 11,969 18,331
Boudh 616 277 2,444 2,088 4,876 23,914 34,215
Cuttack 5,804 4,077 19,122 20,540 49,941 55,206 154,690
Dhenkanal 145 6 158 34 20 0 363
Jagatsinghpur 4,102 3,130 15,320 21,756 41,795 5,664 91,767
Jajpur 1,142 1,571 6,816 4,508 4,096 254 18,387
Kendrapara 5,862 5,630 25,704 30,160 42,057 4,269 113,682
Khordha 2,710 1,529 6,166 4,404 7,289 9,108 31,206
Nayagarh 999 113 696 1,004 2,559 9,170 14,541
Puri 4,765 3,325 15,565 11,152 9,157 350 44,315
Sambalpur 612 512 1,636 1,510 3,853 20,428 28,552
Sonepur 574 628 3,963 3,391 7,862 33,313 49,732
TOTAL = 616,577

9.1. Local Evacuation Plan


If imminent failure of Hirakud Dam with uncontrolled downstream flooding is anticipated, local disaster
management and law enforcement personnel should notify those downstream (Table 10), for evacuation in
the most expedient manner possible following the procedure given in the notification flow charts of this
document (Notification Flow Chart Tab). Local law enforcement officials, along with local mobile network
operators, radio and media representatives can best spread the notice for evacuation (See Responsibilities
Sections, 3.3 and 3.4)

In addition, ANNEXURE 4 (Emergency Level Determination & Action Data Sheets) can be used as support
in the decision-making process either to escalate or downgrade en emergency event. The most important
actions that should be taken during an evacuation process are:

ODISHA WATER RESOURCES DEPARTMENT 19| Pag.


• Police Departments will barricade all bridges and roads that could possibly be flooded to prevent
access to the affected area. These bridges include all Mahanadi crossings and its tributaries as well
as those affected roads shown in the ANNEXURE 2 (Inundation Maps). Inundation Maps along with
Flood Hazard Reference Values in crossings locations included in this annexure indicate the
appropriate barricade locations under the responsibility of local law-enforcement authorities.
• The Districts Disaster Management Authorities (Districts Collectors) will assist with the notification of all
persons and agencies involved (relief authorities), with the possibility of additional support—including
contacting others not accessible by radio or telephone.
• Relief Authorities (Police, Fire, Army) are generally familiar with developed areas in their jurisdiction.
Such knowledge, coupled with the requirements of state law that they respond to disasters, make them
the logical officials to be notified and to spread the warning message to all areas subject to flooding.

Based on the specific results of the dam breach analysis (wave arrival time) and the hazard vulnerability
classification (Table 11), a local evacuation plan has been developed to assist disaster management
authorities in the relief actions. The local evacuation plan can be found in the ANNEXURE 2 tables of this
EAP, and a complete list of relief camps (shelters) is included in ANNEXURE 3

10. IMPLEMENTATION
10.1. Development
This EAP version has been prepared by Central Project Management Unit in collaboration with Odisha Water
Resources Department. The document has been sent to the Odisha Dam Safety Organization and Disaster
Management Authority for review, and agency their comments will be incorporated into this document for
final publication.

10.2. Updating
Copies of the EAP have been provided to all authorities/officials included in the distribution list and the
document has been approved and signed by the Principal Secretary of Odisha Water Resources
Department, District Disaster Management Authority, and the Dam Safety Organization.

This plan will be reviewed and updated annually before the 1st of June of every year by the Emergency
Planning Manager (Executive Engineer, Main Dam Division) and the Superintending Engineer. This review will
involve corresponding personnel from local disaster management agencies in conjunction with Dam Safety
Organization‘s staff.

The Superintending Engineer will organize every year prior to monsoon an orientation meeting to introduce the
revised EAP to local officials, emergency responders. This meeting will give an opportunity to all the
stakeholders to review and comment on EAP document and their respective roles.

The Emergency Planning Manager (Executive Engineer, Main Dam Division) will review and complete all items on
the Annual EAP Evaluation Checklist in Annexure 8. After the annual update is complete, a new Approval
and Implementation sheet will be attached and the annual update will be documented on the Plan Review
and Update sheet in ANNEXURE 9.

If revisions to the EAP are made as a result of the annual update, such changes will be recorded on the Log
Sheet of Changes form at the front of the report. A copy of the updated portions of the EAP will be sent to
the SDSO and all other concerned as per the EAP Distribution List. If the EAP was reviewed and revisions
were not required, the [Dam Owner] will submit written notification to all concerned that no updates to the
EAP have been adopted or implemented.

20| Pag. CENTRAL PROJECT MANAGEMENT UNIT


Emergency Action Plan
HIRAKUD DAM [OR10HH0003]
10.3. Testing
The Superintending Engineer shall organize the following exercises as specified below:

• Orientation (Stakeholders’ Consultation): The Superintending Engineer will organize an orientation


meeting every year with local responders and stakeholders to solicit input, established roles during
emergency situation and facilitate reliable responses to the emergencies. In orientation meeting, the
Emergency Planning Manager will introduce the revised EAP to local officials and emergency
responders and provide those entities the opportunity to review and comment on the documents and
on their roles and responsibilities, described in EAP.
• Tabletop exercises: Superintending Engineer and Emergency Planning Manager will organize a table-
top drill once in 2 years to discuss and review the simulated or imaginary emergency situation. The
tabletop drill involves a meeting of Emergency Planning Manager with local and state Disaster
Management Officials in a conference room. The drill begins with a description of a simulated event
and proceeds with discussions by the participants to evaluate the EAP and response procedures, and
to resolve concerns regarding coordination and responsibilities. Any problems identified during a drill
should be included in revisions to the EAP.

Before the tabletop exercise begins, meeting participants will visit the dam to familiarize with the
dam site. Emergency Planning Manager will present a scenario of an unusual or emergency event at
the dam. The scenario will be developed prior to the exercise with the support of the Dam Safety
Organization.

Once the scenario has been presented, the participants will discuss the risk involved, responses and
related actions that they would take to address and resolve the scenario throughout the exercise. The
exercise provides an opportunity to discuss EAP and response procedures and resolve the questions
throughout the exercise. It will also clarify roles and responsibilities and will identify additional threat
mitigation and preparedness actions.

Records and reporting of the main conclusions/findings of both meetings will be maintained in ANNEXURE 10
and following the deadline given in Table 13.
Table 13.- Hirakud’s EAP exercise/testing requirements

Exercise Schedule Reporting Deadlines


 Pre-Event: Submit Agenda to Stakeholders 30 days before
Orientation (Stakeholder‘s meeting
Annual
Consultation)  Post-Event: Update Form 2 (Annexure 10), within 30 days
after meeting.
 Pre-Event: Submit Exercise Plan and Schedule to participants
Once every 2 years (before monsoon 90 days before exercise
Tabletop Exercise
season)  Post-Event: Update Form 2 (Annexure 10) and submit
Evaluation Report within 60 days after exercise

10.4. Training
The Superintending Engineer will ensure all people involved in the EAP be trained to guarantee that they are
thoroughly familiar with its elements, the availability of equipment, and their responsibilities and duties under
the plan. Personnel will be trained in problem detection, evaluation, and appropriate corrective measures.
This training is essential for proper evaluation of developing situations at all levels of responsibility. Training
records will be maintained also in ANNEXURE 10.

ODISHA WATER RESOURCES DEPARTMENT 21| Pag.


22| Pag. CENTRAL PROJECT MANAGEMENT UNIT
Emergency Action Plan
HIRAKUD DAM [OR10HH0003]

WATCH CONDITION
NOTIFICATION FLOW CHART
(INTERNAL ALERT)

ODISHA WATER RESOURCES DEPARTMENT


CENTRAL PROJECT MANAGEMENT UNIT
Emergency Action Plan
HIRAKUD DAM [OR10HH0003]

FAILURE CONDITION
NOTIFICATION FLOW CHART
(EXTERNAL ALERT)

ODISHA WATER RESOURCES DEPARTMENT


CENTRAL PROJECT MANAGEMENT UNIT
Emergency Action Plan
HIRAKUD DAM [OR10HH0003]

(ANGUL DISTRICT)
DISTRICT-WISE
NOTIFICATION FLOW CHART

ODISHA WATER RESOURCES DEPARTMENT


CENTRAL PROJECT MANAGEMENT UNIT
Emergency Action Plan
HIRAKUD DAM [OR10HH0003]

(BARAGARTH DISTRICT)
DISTRICT-WISE
NOTIFICATION FLOW CHART

ODISHA WATER RESOURCES DEPARTMENT


CENTRAL PROJECT MANAGEMENT UNIT
Emergency Action Plan
HIRAKUD DAM [OR10HH0003]

(BOUDH DISTRICT)
DISTRICT-WISE
NOTIFICATION FLOW CHART

ODISHA WATER RESOURCES DEPARTMENT


CENTRAL PROJECT MANAGEMENT UNIT
Emergency Action Plan
HIRAKUD DAM [OR10HH0003]

(CUTTACK DISTRICT)
DISTRICT-WISE
NOTIFICATION FLOW CHART

ODISHA WATER RESOURCES DEPARTMENT


CENTRAL PROJECT MANAGEMENT UNIT
Emergency Action Plan
HIRAKUD DAM [OR10HH0003]

(DHENKANAL DISTRICT)
DISTRICT-WISE
NOTIFICATION FLOW CHART

ODISHA WATER RESOURCES DEPARTMENT


CENTRAL PROJECT MANAGEMENT UNIT
Emergency Action Plan
HIRAKUD DAM [OR10HH0003]

(JAGATSINGHPUR DISTRICT)
DISTRICT-WISE
NOTIFICATION FLOW CHART

ODISHA WATER RESOURCES DEPARTMENT


CENTRAL PROJECT MANAGEMENT UNIT
Emergency Action Plan
HIRAKUD DAM [OR10HH0003]

(JAJPUR DISTRICT)
DISTRICT-WISE
NOTIFICATION FLOW CHART

ODISHA WATER RESOURCES DEPARTMENT


CENTRAL PROJECT MANAGEMENT UNIT
Emergency Action Plan
HIRAKUD DAM [OR10HH0003]

(KENDRAPARA DISTRICT)
DISTRICT-WISE
NOTIFICATION FLOW CHART

ODISHA WATER RESOURCES DEPARTMENT


CENTRAL PROJECT MANAGEMENT UNIT
Emergency Action Plan
HIRAKUD DAM [OR10HH0003]

(KHORDHA DISTRICT)
DISTRICT-WISE
NOTIFICATION FLOW CHART

ODISHA WATER RESOURCES DEPARTMENT


CENTRAL PROJECT MANAGEMENT UNIT
Emergency Action Plan
HIRAKUD DAM [OR10HH0003]

(NAYAGARH DISTRICT)
DISTRICT-WISE
NOTIFICATION FLOW CHART

ODISHA WATER RESOURCES DEPARTMENT


CENTRAL PROJECT MANAGEMENT UNIT
Emergency Action Plan
HIRAKUD DAM [OR10HH0003]

(PURI DISTRICT)
DISTRICT-WISE
NOTIFICATION FLOW CHART

ODISHA WATER RESOURCES DEPARTMENT


CENTRAL PROJECT MANAGEMENT UNIT
Emergency Action Plan
HIRAKUD DAM [OR10HH0003]

(SAMBALPUR DISTRICT)
DISTRICT-WISE
NOTIFICATION FLOW CHART

ODISHA WATER RESOURCES DEPARTMENT


CENTRAL PROJECT MANAGEMENT UNIT
Emergency Action Plan
HIRAKUD DAM [OR10HH0003]

(SONEPUR DISTRICT)
DISTRICT-WISE
NOTIFICATION FLOW CHART

ODISHA WATER RESOURCES DEPARTMENT


CENTRAL PROJECT MANAGEMENT UNIT
Emergency Action Plan
HIRAKUD DAM [OR10HH0003]

ANNEXURES

ODISHA WATER RESOURCES DEPARTMENT


CENTRAL PROJECT MANAGEMENT UNIT
Emergency Action Plan
HIRAKUD DAM [OR10HH0003]

ANNEXURE 1
Vicinity Map

ODISHA WATER RESOURCES DEPARTMENT


CENTRAL PROJECT MANAGEMENT UNIT
Emergency Action Plan
HIRAKUD DAM [OR10HH0003]
ANNEXURE 3
Shelters / Relief Camps Available outside the Inundation Area

SI. DISTRICT C.D BLOCK VILLAGE NAME SHELTER NAME

0 ANGUL Banarpal Kusupangi KUSAPANGI


1 BALESWAR Soro Gud GUDA
2 BALESWAR Simulia Bainshibati BAISIBATI
3 BALESWAR Soro Tentei TENTEI
4 BALESWAR Simulia Kabirpur ANKULA
5 BALESWAR Bahanaga Bankeswarpur SARANGPUR
6 BALESWAR Soro Mulakaeda CHANDANPUR
7 BALESWAR Soro Pakhar PAKHAR
8 BALESWAR Bahanaga Kharasahapur RAMTALI
9 BALESWAR Bahanaga Barajadeuli BARAJDEOLI
10 BALESWAR Bahanaga Kharasahapur ATHILABAJ
11 BALESWAR Bahanaga Kharasahapur KHARASAHAPUR
12 BALESWAR Soro Belapur BELAPUR
13 BALESWAR Bahanaga Avana ABHANA
14 BALESWAR Bahanaga Barahampur RAMADHA
15 BALESWAR Bahanaga Kuruda KORADA
16 BALESWAR Bahanaga Anji ANJI
17 BALESWAR Bahanaga Kochiakoili KOCHIAKOILI
18 BALESWAR Bahanaga Debendrapur BANIA BISHNUPUR
19 BALESWAR Bahanaga Sahaspura SAHASPUR
20 BALESWAR Bahanaga Sahaspura SAHASPUR
21 BALESWAR Bahanaga Baripada BARIPADA
22 BALESWAR Bahanaga Kheranga KHERANG
23 BALESWAR Bahanaga Rahaniaganja RAHANIAGANJ
24 BALESWAR Bahanaga Ataspur ATISHPUR
25 BALESWAR Bahanaga Thalasada BIJANA
26 BALESWAR Bahanaga Villa BHILA
27 BALESWAR Bahanaga Apitira APITRA
28 BALESWAR Remuna Talapada TALPADA
29 BALESWAR Bahanaga Nuapur NUAPUR
30 BALESWAR Bahanaga Gandhina Gandhina
31 BALESWAR Remuna Inchudi INCHURI
32 BALESWAR Bahanaga Bajipur PAIKASTA
33 BALESWAR Bahanaga Odasala URSAL
34 BALESWAR Remuna Mahamadabad MAHAMADABAD
35 BALESWAR Remuna Deulabad KANTANDAPAHI
36 BALESWAR Remuna Srijang SHRIJANG
37 BALESWAR Remuna Kantarda KHATU
38 BALESWAR Remuna Tundara Rajachaka
39 BALESWAR Remuna Khadu BHIMPUR
40 BALESWAR Remuna Tundara TANRA
41 BALESWAR Remuna Maharajpur MAHARAJPUR
42 BALESWAR Remuna Boita BOLTA

ODISHA WATER RESOURCES DEPARTMENT


SI. DISTRICT C.D BLOCK VILLAGE NAME SHELTER NAME

43 BALESWAR Remuna Rehang REHANG


44 BALESWAR Baleswar Bardhanpur BARDHANPUR
45 BALESWAR Baleswar Jayadebkasapa JAYDEB KHASBE
46 BALESWAR Oupada Jemadeipur SHYAMSUNDARPUR
47 BALESWAR Remuna Tina MANDAGAN
48 BALESWAR Baleswar Purusatampur BARKIA
49 BALESWAR Baleswar Gudu GUDU
50 BALESWAR Baleswar Hidigan HIDIGAN
51 BALESWAR Baleswar Pakharsaun POKHARA SASAN
52 BALESWAR Baleswar Ranasahi RANASAHI
53 BALESWAR Baleswar Srikona SHRIKANA
54 BALESWAR Baleswar Srikona SRIKANA
55 BALESWAR Baleswar Parikhi KAYAKADALA
56 BALESWAR Baleswar Parikhi TALABOROI
57 BALESWAR Baleswar Parikhi PARAKHI
58 BALESWAR Baleswar Pakhrabad POKHARABAD
59 BALESWAR Baleswar Baincha BALACHA
60 BALESWAR Baleswar Nuapur SINDHIA
61 BALESWAR Baleswar Gopinathpur GOPINATHPUR
62 BALESWAR Baleswar Bahabalpur BAHABALPUR
63 BALESWAR Remuna Ganeswarpur GANESHWARPUR
64 BALESWAR Baleswar Sartha SARTHA CHOK
65 BALESWAR Baleswar Sartha Chaka Sartha
66 BALESWAR Baleswar Kasafal KASAPHAL
67 BALESWAR Baleswar Sangobara SANGOBRA
68 BALESWAR Baliapal Jambhirei JAMBHIRAL
69 BALESWAR Baliapal Jamunasul JAMUNASHUL
70 BALESWAR Baliapal Jambhirei Jambhirai
71 BALESWAR Baliapal Gobindapur CHHALLA
72 BALESWAR Baleswar Chakbramhananda MAHAPADA
73 BALESWAR Baliapal Jambhirei KALSHIMULI
74 BALESWAR Baleswar Kaudipur KAURIPUR
75 BALESWAR Baliapal Chaumukha KAKRAPALI
76 BALESWAR Baleswar Panchpada PANCHPARA
77 BALESWAR Baliapal Dagara NARAYANPUR
78 BALESWAR Baliapal Chaumukha CHAUMUKH
79 BALESWAR Baleswar Alumeda ALUMARA
80 BALESWAR Baliapal Panchupali PACHUPALI
81 BALESWAR Baliapal Nuagan KATARAMAHAL
82 BALESWAR Remuna Kasimpur Kashimpur
83 BALESWAR Baliapal Narayanpur NARAYANPUR PANTHAL
84 BALESWAR Baleswar Sartha SARTHA
85 BALESWAR Baliapal Bhanupur BHANUPUR
86 BALESWAR Baliapal Dagara DAGARA
87 BALESWAR Baleswar Kalabudhi Kalabudhi
88 BALESWAR Baleswar Koilisahi KORLISAHI
89 BALESWAR Baliapal Aladiha BALIBILI

CENTRAL PROJECT MANAGEMENT UNIT


Emergency Action Plan
HIRAKUD DAM [OR10HH0003]

SI. DISTRICT C.D BLOCK VILLAGE NAME SHELTER NAME

90 BALESWAR Bhograi Kirtaniajalpahi KIRTANIA


91 BALESWAR Baliapal Saudihi SAUDIHI
92 BALESWAR Remuna Gududa GURUDA
93 BALESWAR Baliapal Gobindapur GOBINDAPUR
94 BALESWAR Baliapal Bishikadeipur BISHIKADEIPUR
95 BALESWAR Baliapal Suradiha ALADIHA
96 BALESWAR Nilagiri Mangalapala PUNDAL
97 BALESWAR Baliapal Ranikhudi ANDEULA
98 BALESWAR Baliapal Bisikadeipur MAHAPADA
99 BALESWAR Baliapal Narayanpur KASHIPUR
100 BALESWAR Baliapal Bramhanbaisada BAGDA
101 BALESWAR Baleswar Binjha BINJHA
102 BALESWAR Baliapal Mundananji SURADIHA
103 BALESWAR Baliapal Bulang BULANG
104 BALESWAR Baliapal Kudali(Kundali) KUNDOLI
105 BALESWAR Baliapal Pratappur PRATABPUR
106 BALESWAR Baliapal Mahabala MAHABELA
107 BALESWAR Bhograi Kanthibhaunri KANTHIBHAUNIRI
108 BALESWAR Baliapal Sarapunja NABHARA
109 BALESWAR Baliapal Sankhua SHANKHUA
110 BALESWAR Bhograi Rankotha RANAKOTHA
111 BALESWAR Bhograi Bichitrapur BICHITRAPUR
112 BALESWAR Bhograi Kanyanagari KANYANAGARI
113 BALESWAR Bhograi Krushnanagar KRISHNANAGARI
114 BALESWAR Baliapal Pakmundi POKAMURI
115 BALESWAR Bhograi Udayapur UDAIPUR
116 BALESWAR Baliapal Jamkunda Jamakunda
117 BALESWAR Basta Kainagari KALNAGARI
118 BALESWAR Remuna Sankarpur SANKARPUR
119 BALESWAR Bhograi Dakhinsarisa SAHABHAJAPUR
120 BALESWAR Bhograi Thakurbhaunri KUMBHIRGADI
121 BALESWAR Bhograi Gajipur BARA SARISA
122 BALESWAR Baliapal Jamkunda JAMKUNDA
123 BALESWAR Bhograi Pasarbindha PASARBINDHA
124 BALESWAR Baliapal Jabaka DEULA
125 BALESWAR Baliapal Jamkunda JAMKUNDA
126 BALESWAR Bhograi Tengramari TENGRAMARI
127 BALESWAR Bhograi Jairampur JAIRAMPUR
128 BALESWAR Baliapal Nayabali Ikrapal
129 BALESWAR Bhograi Sialia SIALIA
130 BALESWAR Bhograi Gopinathpur DWARPATNA
131 BALESWAR Bhograi Jalpahi KASIMPUR
132 BALESWAR Baliapal Rasalpur RASALPUR
133 BALESWAR Bhograi Manunagar MANUNAGA
134 BALESWAR Bhograi Jaleswarpur JALESWARPUR
135 BALESWAR Baliapal Dalua-2 BARHAPAL
136 BALESWAR Bhograi Nilpura NILPURA

ODISHA WATER RESOURCES DEPARTMENT


SI. DISTRICT C.D BLOCK VILLAGE NAME SHELTER NAME

137 BALESWAR Jaleswar Baliapal BALIAPAL


Paunsakuli oraf
138 BALESWAR Basta PUNSKULI
Ratankuli
139 BALESWAR Bhograi Nachinda NACHINDA
140 BALESWAR Bhograi Putina PUTINA
141 BALESWAR Basta Chormara CHORMARA
142 BALESWAR Basta Junbalada JUNBALDA
143 BALESWAR Bhograi Mohagab MAHAGABA
144 BALESWAR Jaleswar Kapasuda JALAKOPARIA
145 BALESWAR Jaleswar Dakhinpaharajpur GUAGARIA
146 BARGARH Ambabhona Antaradi ANTRARI
147 BARGARH Ambabhona Bhainatora GANTHIAPAL
148 BHADRAK Chandabali Kaudiapal KANRIAPAL
149 BHADRAK Chandabali Orasahi URASAHI
150 BHADRAK Chandabali Tentulidihi TENTULIDIHI
151 BHADRAK Chandabali Charadia CHARDIA
152 BHADRAK Chandabali Paikasahi PAIKSAHI
153 BHADRAK Chandabali Bidyutprava BIDYUTPRAVANAGAR
154 BHADRAK Chandabali Sampatia URAMAL
155 BHADRAK Chandabali Jharakata JHARKOTI
156 BHADRAK Chandabali Dosinga DASINGHA
157 BHADRAK Chandabali Sailendrapalli HARISHPUR
158 BHADRAK Chandabali Jagula NARSINGHPURDIHA
159 BHADRAK Chandabali Sailendrapalli SHAILENDRAPALI
160 BHADRAK Chandabali Chianipahi CHANIPAI
161 BHADRAK Chandabali Koilekha KOILEKHA
162 BHADRAK Chandabali Guanl GUANIA
163 BHADRAK Chandabali Kanakprasad KRUSHNAPRASAD
164 BHADRAK Chandabali Jyotisingpur KRUSHNAPUR
165 BHADRAK Chandabali Badatilanchi BADA TILANCHI
166 BHADRAK Chandabali Karandimal KARANDIMAL
167 BHADRAK Chandabali Kaithkola KANAKPRASAD
168 BHADRAK Chandabali Matto MOTA
169 BHADRAK Chandabali Gangadharpur GANGADHARPUR
170 BHADRAK Chandabali Chhedak CHHENAK
171 BHADRAK Chandabali Purnaprasad GOURPRASAD
172 BHADRAK Chandabali Baliarpur BALIARPUR
173 BHADRAK Dhamanagar Arjunpur ARJUNPUR
174 BHADRAK Dhamanagar Padhani PADHANI
175 BHADRAK Chandabali Barakolha BARAKULA
176 BHADRAK Chandabali Karanjamal KARANJAMAL
177 BHADRAK Chandabali Jantuali JANTUALI
178 BHADRAK Chandabali Nachhipur NACHHIPUR
179 BHADRAK Tihidi Barsar TIARISAHI
180 BHADRAK Chandabali Dhirasahi Uttarasahi
181 BHADRAK Dhamanagar Bamkura BAMAKURA
182 BHADRAK Chandabali Sunaripokhari SUNDARIPOKHARI

CENTRAL PROJECT MANAGEMENT UNIT


Emergency Action Plan
HIRAKUD DAM [OR10HH0003]

SI. DISTRICT C.D BLOCK VILLAGE NAME SHELTER NAME

183 BHADRAK Chandabali Ankapada ANKAPARA


184 BHADRAK Chandabali Khadalpokhari KHODALPOKHARI
185 BHADRAK Dhamanagar Bayangdihi BAYANGDIHI
186 BHADRAK Chandabali Baincha BAINCHA
187 BHADRAK Chandabali Biriadia BIRIADIHA
188 BHADRAK Chandabali Kaduanasi KADUANASI
189 BHADRAK Chandabali Sendhagara SENDAGADA
190 BHADRAK Tihidi Chabispada DAHAPANIA
191 BHADRAK Chandabali Bijaypatana BIJAYPATANA
192 BHADRAK Basudebpur Balarampur Khedualpur
193 BHADRAK Basudebpur Khantakhuada KHANTKHUAR
194 BHADRAK Basudebpur Balarampur BALARAMPUR
195 BHADRAK Basudebpur Joragadia JURAGADIA
196 BHADRAK Basudebpur Badahabelisahi HABELISAHI
197 BHADRAK Basudebpur Brajanandapur BRAJANANDAPUR
198 BHADRAK Basudebpur Govindapur Gobindapur
199 BHADRAK Basudebpur Govindapur GOBINDAPUR
200 BHADRAK Bhandaripokhari Khapuriapada BANDALO
201 BHADRAK Basudebpur Machhuaghaibada MACHHUAGHAI BADA
202 BHADRAK Basudebpur Rajgharpokhari RAJGHARPOKHARI
203 BHADRAK Basudebpur Bideipur GADI
204 BHADRAK Basudebpur Bideipur GANGAMANISHILA
205 BHADRAK Tihidi Saya SAYA
206 BHADRAK Basudebpur Lakshmiprasad LAKSHMIPRASAD
207 BHADRAK Basudebpur Bideipur BIDEIPUR
208 BHADRAK Basudebpur Kerasahi KERSAHI
209 BHADRAK Basudebpur Mishrapur MISHRAPUR
210 BHADRAK Basudebpur Biras BIROS
211 BHADRAK Basudebpur Mishrapurpatna PATANA MISHRAPUR
212 BHADRAK Basudebpur Managarh MANGARH
213 BHADRAK Basudebpur Laxmidaspur LOKSHMIPRASADPUR
214 BHADRAK Basudebpur Krushnapur KRUSHNAPUR
215 BHADRAK Basudebpur Lunga LUNGA
216 BHADRAK Basudebpur Krushnapur SANA KRUSHANAPUR
217 BHADRAK Basudebpur Krushnapur DHINDACHANDI
218 BHADRAK Basudebpur Krushnapur KRUSHNAPUR
219 BHADRAK Basudebpur Krushnapur SANA KRUSHANAPUR
220 BHADRAK Basudebpur Kismatkrushnapur KISMAT KRUSHNAPUR
221 BHADRAK Basudebpur Kismatkrushnapur KISMAT KRUSHNAPUR
222 BHADRAK Basudebpur Radhakanatapur RADHAKANTAPUR
223 BHADRAK Bhadrak Daising DAISINGHA
224 BHADRAK Basudebpur Chudamani CHURAMANI ARHIA
225 BHADRAK Basudebpur Chudamani CHURAMANI
226 BHADRAK Basudebpur Chudamani CHURAMANI
227 BHADRAK Basudebpur Adhuan ADUAN
228 BHADRAK Basudebpur Kalidaspur KALIDASPUR
229 BHADRAK Basudebpur Eram IRAM

ODISHA WATER RESOURCES DEPARTMENT


SI. DISTRICT C.D BLOCK VILLAGE NAME SHELTER NAME

230 BHADRAK Basudebpur Eram ARHIA


231 BHADRAK Basudebpur Eram OLAGADA
232 BHADRAK Basudebpur Iswarpur KUMIRGARIA
233 BHADRAK Basudebpur Nuagan NUAGAN
234 BHADRAK Basudebpur Jagannathi JAGANNATH
235 BHADRAK Basudebpur Suan SUDARSHANPUR
236 BHADRAK Basudebpur Uhad UHAR
237 BHADRAK Basudebpur Ratanga RATANG
238 BHADRAK Bant Charigan CHARIGAN
239 BHADRAK Basudebpur Artung ARTUNG
240 BHADRAK Basudebpur Kumarpur SANKHARO
241 BHADRAK Basudebpur Padhuan KUMARPUR
242 BHADRAK Basudebpur Padhuan Sarapokhari adi
243 BHADRAK Basudebpur Padhuan PADHUAN
244 BHADRAK Basudebpur Mohanpur MOHANPUR
245 BHADRAK Basudebpur Bachhada BACHHADA
246 BOUDH Kantamal Ghantapada GHANTAPARHA
247 BOUDH Kantamal Gadiajore GARHIAJOR
248 BOUDH Boudh Bahira BAHIRA
249 Cuttack Banki-Dampara Gadajit DAMAPARHAGARH
250 DHENKANAL Parajang Panigengutia RANIGENGUTIA
251 DHENKANAL Gandia Khandabandha NUAGARHA
252 DHENKANAL Odapada Kharagprasad KHARAGAPRASAD
253 DHENKANAL Gandia Lahada LAHARHA
254 DHENKANAL Kamakhyanagar Kantajharia BUDHIBILI
255 DHENKANAL Bhuban Asurabandha ASURBANDHA
256 DHENKANAL Kankadahad Kankadahad KANKARHAHARH
257 GAJAPATI Kasinagar Bhupatilaxmipur LAKSHMIPURANA
258 GAJAPATI Kasinagar Partada PARTADA
259 GAJAPATI Kasinagar Sara SARA
260 Ganjam Chikiti Patisonapur PATISUNAPUR
261 Ganjam Chikiti Sonapur SUNAPUR
262 Ganjam Chikiti Alladapur ALARAPUR
263 Ganjam Chikiti Chandanbada CHANDANABARHA
264 Ganjam Chikiti Dayanidhipeta DAYANIDHIPETA
265 Ganjam Chikiti Gobindapur GOBINDAPUR
266 Ganjam Chikiti Ekasingi EKASING
267 Ganjam Chikiti Maisanpur NUA MAISANAPUR
268 Ganjam Chikiti Maisanpur PURUNA MAISANAPUR
269 Ganjam Rangeilunda Dhepanuapada DHEPI NUAPARHA
270 Ganjam Rangeilunda Mendrajpur MENDRAJAPUR
271 Ganjam Rangeilunda Markandi MARKANDI
272 Ganjam Rangeilunda Tulu TULU
273 Ganjam Rangeilunda Gunupur GUNAPALLI
274 Ganjam Rangeilunda Lohadigam GODIGAN
275 Ganjam Rangeilunda Hatipada NUA GOLABANDHA
276 Ganjam Digapahandi Dhanyarasi DHANARASHI

CENTRAL PROJECT MANAGEMENT UNIT


Emergency Action Plan
HIRAKUD DAM [OR10HH0003]

SI. DISTRICT C.D BLOCK VILLAGE NAME SHELTER NAME

277 Ganjam Chikiti Chadhiapada NUAPARHA


278 Ganjam Rangeilunda Venketraipur NUA BAKSHIPALLI
279 Ganjam Rangeilunda GOPALPUR (NAC) GOPALPUR
280 Ganjam Rangeilunda Bandar BANDARA
281 Ganjam Chhatrapur Uppalaputi HARIPUR
282 Ganjam Chhatrapur Uppalaputi UPALAPUTI
283 Ganjam Rangeilunda Antarbatia ANTRABATIA
284 Ganjam Digapahandi Golanda GOLANDA
285 Ganjam Chhatrapur Matikhala MATIKHAL
286 Ganjam Chhatrapur Arjyapalli BARHA ARYAPALLI
287 Ganjam Chhatrapur Arjyapalli SANA ARYAPALLI
288 Ganjam Chhatrapur Kanamana KANAMANA
289 Ganjam Chhatrapur Agastinuagan NALIYANUAGAN
290 Ganjam Chhatrapur Karapalli KARAPALLI
291 Ganjam Chhatrapur Agastinuagan AGASTINUAGAN
292 Ganjam Ganjam Pallibandha PURANABANDH
293 Ganjam Digapahandi Bhishmagiri BHISMAGIRI
294 Ganjam Ganjam Binchanapalli BINCHANPALLI
295 Ganjam Ganjam Aliabada NILADRIPURAM
296 Ganjam Ganjam Gokharakuda GOKHURKUDA
297 Ganjam Ganjam Kainchapur KALAYANPUR
298 Ganjam Ganjam Rajapur RAJPUR
299 Ganjam Ganjam Aliabada ALYABAD
300 Ganjam Ganjam Karapada KARPARA
301 Ganjam Ganjam Kantiagada KANTIAGAR
302 Ganjam Ganjam Sribena JAGANNATHPUR
303 Ganjam Ganjam Lunguri LUNGURI
304 Ganjam Purusottampur Sunadhara SUNATHARA
305 Ganjam Ganjam Barada BARADA
306 Ganjam Ganjam Lunguri BARIGAN
307 Ganjam Ganjam Raghunathpur JHATIPADAR
308 Ganjam Ganjam Ranibara HUMMA
309 Ganjam Ganjam Belapada RAGHUNATHPUR
310 Ganjam Ganjam Padagadajhatipadar NEW PODAMPETA
311 Ganjam Ganjam Ranibara BELPARA
312 Ganjam Ganjam Palurgada ARUNPUR
313 Ganjam Hinjilicut Balarampur BALARAMAPALLI
314 Ganjam Ganjam Ranibara SHATRUSHOL
315 Ganjam Ganjam Santoshpur SANTOSHPUR
316 Ganjam Ganjam Prayagi PROYAGI
317 Ganjam Ganjam Haripurburudi MATH MAKUNDAPUR
318 Ganjam Ganjam Binchanapalli BINCHANAPALLI
319 Ganjam Hinjilicut Ralabha RALABA
320 Ganjam Ganjam Satuli SATULI
321 Ganjam Chhatrapur Goba GOBA
322 Ganjam Ganjam Ranibara BAHARAPALLI
323 Ganjam Purusottampur Gobindapur COBINDAPUR

ODISHA WATER RESOURCES DEPARTMENT


SI. DISTRICT C.D BLOCK VILLAGE NAME SHELTER NAME

324 Ganjam Hinjilicut Allapur ALIPUR


325 Ganjam Purusottampur Pratappur PRATAPUR
326 Ganjam Hinjilicut Burupada BURUPARHA
327 Ganjam Purusottampur Balia BALIA
328 Ganjam Hinjilicut Kharida KHARIRHA
329 Ganjam Purusottampur Antrigam ANTIRIGAN
330 Ganjam Ganjam Jahami Madhurchuan
331 Ganjam Hinjilicut Khandara KODRA
332 Ganjam Ganjam Kahakapur POLLANGO
333 Ganjam Seragad Kanjiama KANJANA
334 Ganjam Seragad Tahara TOGRAMA
335 Ganjam Seragad Santoshpur SANTOSHAPU
336 Ganjam Kabisuryanagar Bhetasingi BHERASINGI
337 Ganjam Khallikote Mukundapur MUKUNDAPUR
338 Ganjam Khallikote Badapalli BADOPALLI
339 Ganjam Khallikote Sabilia SABILIA
340 Ganjam Seragad Brahmanachai BRAHMANACHHAL
341 Ganjam Khallikote Bahadapalli BABARAPALLI
342 Ganjam Khallikote Bania BANIA
343 Ganjam Khallikote Kanaka KONOKA
344 Ganjam Khallikote Samalnasi SOMALA
345 Ganjam Purusottampur Sama SHAMA
346 Ganjam Khallikote Dimiria DHIMIRIYA
347 Ganjam Khallikote Paladhuapalli PALODHUAPALLI
348 Ganjam Khallikote Nutanberhampur BHARAMPUR
349 Ganjam Khallikote Solabandha GADAKASTA
350 Ganjam Beguniapada Baurinuapalli NUAPALLI
351 Ganjam Kabisuryanagar Mathatentulia TENTULIA
352 Ganjam Aska Gunthapada JAGADALPUR
353 Ganjam Aska Sidhanai MAHARAJAPUR
354 Ganjam Khallikote Kumarsingh KUMARSINGI
355 Ganjam Sorada Amrutulu AMRUTULU
356 Ganjam Buguda Krushnasharanpur KRUSHNASHARANAPUR
357 Ganjam Bellaguntha Mandara MANDAR
358 Ganjam Bhanjanagar Turuma TURUMU
359 JAJPUR Bari Madhusudan Pur MADHUSUDANPUR
360 JAJPUR Badachana Dhanmandal DHANMANDAL
361 JAJPUR Binjharpur Ranapur RANPUR
362 JAJPUR Dasarathpur Dattapur Duttapur
363 JAJPUR Rasulpur Laxmi Nagar LAKSHMINAGAR
364 JAJPUR Danagadi Manipur MANIPUR
365 JAJPUR Danagadi Barigodha TRIJANGA
366 JHARSUGUDA Lakhanpur Mohadi MOHADI
367 JHARSUGUDA Lakhanpur Kanaktora KANAKTURA
368 KALAHANDI Junagarh Kutengan KOTENGAON
369 KALAHANDI Kesinga Belkhandi BELAKHANDI
370 KENDRAPARA Rajnagar Gupti UKILAPARA

CENTRAL PROJECT MANAGEMENT UNIT


Emergency Action Plan
HIRAKUD DAM [OR10HH0003]

SI. DISTRICT C.D BLOCK VILLAGE NAME SHELTER NAME

371 KENDRAPARA Rajnagar Adabhutia GUPTI


372 KENDRAPARA Rajnagar Junus Nagar JONESNAGAR
373 KENDRAPARA Rajnagar Balabhadrapur BAOBHADRAPUR
374 KENDRAPARA Rajnagar Panchu Palli PADMALABHPUR
375 KENDRAPARA Rajkanika Koilipur KOLIPUR
376 KENDRAPARA Rajnagar Pata Paria PATAPARA
377 KENDRAPARA Rajnagar Chanra Kolha CHABARAKOLA
378 KENDRAPARA Rajnagar Keruapal KERUAPAL
379 KENDRAPARA Rajnagar Sourendrapur SURENDRAPUR
380 KENDRAPARA Rajkanika Bajarpur BAJARPUR
381 KENDRAPARA Rajnagar Paramanandpur REJENDARNARAYANPUR
382 KENDRAPARA Rajnagar Dalei Sahi DALASAHI
383 KENDRAPARA Rajnagar Dangamal DHANGMAL
384 KENDRAPARA Rajnagar ManjulaPalli MANJULAPALLI
385 KENDRAPARA Rajnagar Khas Munda KHASMUNDA
386 KENDRAPARA Rajnagar Sikar Pahi BHEKTA
387 KENDRAPARA Rajnagar Dangamal DANGMAL
388 KENDRAPARA Rajnagar SailendraNagar KANAKANAGAR
389 KENDRAPARA Rajnagar Khamarsahi KHAMARSAHI
390 KENDRAPARA Rajnagar Tikayat Nagar TALCHUA
391 KENDRAPARA Rajkanika Domanda (Barha) GUNTHAL
392 KENDRAPARA Rajnagar Subarnpur KRISHNAGARH
393 KEONJHAR Hatadihi Ratakana RATAKANA
394 KEONJHAR Hatadihi Habaleswar HABALESWAR
395 KEONJHAR Ghasipura Atta ATTA
396 KEONJHAR Hatadihi Karagola KARAGOLA
397 Khordha Chilika Boriasahi BORASAHI
398 Khordha Banapur Ranipada PUNJIAMA SASAN
399 Khordha Banapur Manikpur MANIKPUR
400 Khordha Chilika Baulabandha BANIABANDHA
401 Khordha Banapur Narendrapur NARENDRAPUR
402 Khordha Chilika Haripur HARIPUR
403 Khordha Banapur Bhapur BHAPUR
404 Khordha Chilika Parabala PARABAL
405 Khordha Chilika Baradihi BARADIHI
406 Khordha Banapur Kulei KULOI
407 Khordha Banapur Binjhala BINJHALA
408 Khordha Banapur Harichandanpur HARICHANDANPUR
409 Khordha Chilika Biribadi BERIBAR
410 Khordha Banapur Madhusudanpur GOTAPALLI
411 Khordha Chilika Mansinghpur MANSINGHPUR
412 Khordha Chilika Bhagabatipur BHAGABATIPUR
413 Khordha Banapur Moramori MORAMOR
414 Khordha Tangi Ratanpur RATANPUR
415 Khordha Tangi Jayamangalapur JAIMANGALPUR
416 Khordha Tangi Mangalajodi KARTIASAHI
417 Khordha Tangi Orada ORADA

ODISHA WATER RESOURCES DEPARTMENT


SI. DISTRICT C.D BLOCK VILLAGE NAME SHELTER NAME

418 Khordha Tangi Mangalajodi MANGLAJORI


419 Khordha Tangi Subhadrapur Saraswatinagar
420 Khordha Tangi Singarama SINGARAMA
421 Khordha Tangi Katilagothpatna KATIAKUT COLONY
422 Khordha Tangi Sundarpur SUNDARPUR
423 Khordha Tangi Jhatinuagaon BALIPATPUR
424 Khordha Tangi Jhatinuagaon NUAGAON
425 Khordha Tangi Kantalabai KANTALBAL
426 Khordha Tangi Ramachandrapur RAMACHANDRAPUR
427 Khordha Tangi Mulijhar BHUSANDAPUR
428 Khordha Tangi Sanagobindapur ARERI
429 Khordha Tangi Nuagarh NAYAGARH
430 Khordha Khordha Balapur BALAPUR
431 Khordha Jatani Trimal TIRIMAL
432 Khordha Jatani Badanuagaon BARANUAGAN
433 Khordha Jatani Angarpada ANGARAPARHA
434 MAYURBHANJ Kaptipada Karapada KARPADA
435 MAYURBHANJ Udala Purunapani PURUNAPANI
436 MAYURBHANJ Barsahi Salgan SALGAN
437 MAYURBHANJ Barsahi Kolkotha BELANPUR
438 MAYURBHANJ Barsahi Rangpani RANGAPARA
439 MAYURBHANJ Barsahi Baguli BAGULI
440 MAYURBHANJ Baripada Narapada NARAPADA
441 MAYURBHANJ Baripada Sanagaria SANAGARIA
442 MAYURBHANJ Baripada Kalikapur KALIKAPUR
443 MAYURBHANJ Shamakhunta Teldiha KANTAPAL
444 NAYAGARH Ranapur Arjunapur ARJUNPUR
445 NAYAGARH Ranapur Ranigadia RANIGUDIA
446 NAYAGARH Ranapur Champagada CHAMPAGARH
447 NAYAGARH Ranapur Muktapur BANDHAPALA
448 NAYAGARH Ranapur Barangagadia BARANG GARIA
449 NAYAGARH Ranapur Champapedi CHAMPAPERHI
450 NAYAGARH Odagaon Badagorada BARHA GORADA
451 NAYAGARH Nayagarh Badapandusar BARHA PANDUSA
452 NAYAGARH Nayagarh Natugaon NATUGRAMA
453 PURI Krushnaprasad Ramalenka RAMLANKA
454 PURI Krushnaprasad Bramhanadeo BRAHMANDEO
455 PURI Krushnaprasad Bajrakote BAJRAKOT
456 PURI Krushnaprasad Udayagiri DEGIRI
457 PURI Krushnaprasad Talatala TALRALA
458 PURI Krushnaprasad Fatepur PHATEPUR
459 PURI Krushnaprasad Budhibar Budhibar
460 PURI Krushnaprasad Maludkhas GOPAKUDA
461 PURI Krushnaprasad Siala SIYALA
462 PURI Krushnaprasad Jamuna JAMUNA
463 PURI Krushnaprasad Alanda ALANDA
464 PURI Krushnaprasad Nuagaon NUAGAON

CENTRAL PROJECT MANAGEMENT UNIT


Emergency Action Plan
HIRAKUD DAM [OR10HH0003]

SI. DISTRICT C.D BLOCK VILLAGE NAME SHELTER NAME

465 PURI Krushnaprasad Titipa TITIPO


466 PURI Krushnaprasad Jagirakuda BARAANLA
467 PURI Krushnaprasad Jagirakuda Sanaanla
468 PURI Krushnaprasad Gomundia GOMUNDIA
469 PURI Krushnaprasad Jharakata Kurupala
470 PURI Krushnaprasad Khatiakudi KHATIAKUDI
471 PURI Krushnaprasad Khirisahi KHIRSAHI
472 PURI Krushnaprasad Iping KRISHNAPRASADGARH
473 PURI Krushnaprasad Jharakata JHARKATA
474 PURI Krushnaprasad Badajhada JENAPUR
475 PURI Krushnaprasad Sipia SIPIA
476 PURI Krushnaprasad Nuapada NUAPARA
477 PURI Krushnaprasad Baghamunda BAGHMUNDA
478 PURI Krushnaprasad Gurubai GURUBAL
479 PURI Krushnaprasad Nuagan NUAGAON
480 PURI Krushnaprasad Manikapatna GOBAKUND
481 PURI Krushnaprasad Pirijipur PIRIJIPUR
482 PURI Krushnaprasad Manikapatna MANIKPATNA
483 PURI Krushnaprasad Manikapatna SANAPATNA
484 PURI Krushnaprasad Anandapur GANGADHARPUR
485 PURI Krushnaprasad Rameswarapur RAMESWARPUR
486 PURI Krushnaprasad Panasapada PANASAPADA
487 PURI Krushnaprasad Siara SIARA
488 PURI Krushnaprasad Gopinathpur GOPINATHPUR
489 PURI Bramhagiri Sipasurubili MOT
490 PURI Bramhagiri Chapamanik CHAMPANIK
491 PURI Bramhagiri Matamatpur MATMATPUR
492 PURI Bramhagiri Narasinghpurpattna NARSINGHA PATNA
493 PURI Bramhagiri Gobindapur SATYAKIPUR
494 PURI Bramhagiri Jagannathpatana JAGANNATH PATNA
495 PURI Bramhagiri Palanka PALANK
496 PURI Bramhagiri Barudi BOLUKHADRA PATNA
497 PURI Bramhagiri Badabenakudi BARA BENAKUDI
498 PURI Bramhagiri Barajanga BARJHANGA
499 PURI Bramhagiri Dharanikudi Dharanikudi
500 PURI Puri PURI (M) PURI
501 PURI Bramhagiri Sanabandhakera SANA BANDHKERA
502 PURI Bramhagiri Kahalapada KAHALPADA
503 PURI Bramhagiri Badabandhakera BARA BANDHKERA
504 PURI Bramhagiri Gorual GORUAL
505 PURI Puri Kharipada KHARIAPADA
506 PURI Bramhagiri Bramahnia BRAHMANJA
507 PURI Bramhagiri Torana TERAN
508 PURI Bramhagiri Bijipur GOURBANDH
509 PURI Bramhagiri Kankuda KANKURA
510 PURI Bramhagiri Aruagobindpur BIDURBANK
511 PURI Bramhagiri Manapada MANDPARA

ODISHA WATER RESOURCES DEPARTMENT


SI. DISTRICT C.D BLOCK VILLAGE NAME SHELTER NAME

512 PURI Bramhagiri Chaturthasha CHATURTHASHA


513 PURI Bramhagiri Golara GOLORA
514 PURI Bramhagiri Chhotapur CHHATAPUR
515 PURI Bramhagiri Ghatakudi GHATAKURI
516 PURI Bramhagiri Basantapada BANASTAPADA
517 PURI Bramhagiri Tiarapari TIARPARI
518 PURI Bramhagiri Gagadala JAGADAL
519 PURI Bramhagiri Bhandarikuda BHANDARIKUDA
520 PURI Bramhagiri Brahmapur RAMCHANDRAPUR
521 PURI Bramhagiri Nuapada NUAPADA
522 PURI Puri Kurunti KURUNTI
523 PURI Puri Hantuk HANTUR
524 PURI Bramhagiri Dimirisena DIMIRISANA
525 PURI Puri Krushnanjanpur KRUSHNANJANPUR
526 PURI Bramhagiri Talamala TALMAL
527 PURI Puri Ganganarayanpur Ganganarayanpur
528 PURI Kanas Alibada JODAPADAR
529 PURI Puri Ganganarayanpur GANGANARAYANPUR
530 PURI Puri Khandighar KHANDIGHAR
531 PURI Kanas Mulabasanta Mulabasanta
532 PURI Kanas Gopinathpur PAIKMARA
533 PURI Kanas Jamilagoda JAMILIGODA
534 PURI Kanas Badal BARAORA
535 PURI Kanas Basantapur BASANTPUR
536 PURI Satyabadi Sukala SUKOL
537 PURI Satyabadi Narendrapur NARENDRAPUR
538 PURI Kanas Deipur DEIPUR
539 PURI Kanas Kadua KAURIKHANI
540 PURI Kanas Harasapada Khandahota
541 PURI Kanas Deipur TELONGAPARA
542 PURI Satyabadi Alaguma ALAGUM
543 PURI Kanas Gadakharada No.1 GORKHAROD
544 PURI Kanas Chupurungi Kaudiapur
545 PURI Kanas Chupurungi CHUPURUNGI
546 PURI Kanas Jankia JANKIA
547 PURI Delanga Indipurdeuli INDIPUR
548 PURI Delanga Dhanakera(Egarapana) DHANKERA
549 PURI Kanas Ichhapur LAKHANPUR
550 PURI Delanga Gudapailo GURUPAIL
551 PURI Delanga Karimul-Sebatipur KALYANPUR
552 PURI Pipili Kakudia KAKURIA
553 PURI Pipili Bilipada BILIPARA
554 PURI Pipili Ekachalia LAKSHMINARAYANPUR
555 RAYAGADA Rayagada Hatasakhal RAMAHANDRAPUR
556 RAYAGADA Gunupur GUNUPUR (NAC) GUNUPUR
557 RAYAGADA Bissam Cuttack Kutragada KUTRAGARH

CENTRAL PROJECT MANAGEMENT UNIT


Emergency Action Plan
HIRAKUD DAM [OR10HH0003]
ANNEXURE 4
Emergency Level Determination - Action Data Sheet Index
Annex Table I.- Emergency Level Determination - Action Data Sheet Index

Action
Event/General Emergency
Specific Observation/Condition Data
Observation Level
Sheet
Unexpected Failure Dam unexpectedly and without warning begins to fail RED SHEET #1
No active erosion in downstream areas. Discharges are
BLUE SHEET A1
below 5,000 m3/s (See Table 1)
Active erosion in downstream areas. Spillway‘s
Spillway Release,
discharges are above 15,000 m3/s or as per Table 1 ORANGE SHEET A2
increasing reservoir
ORANGE conditions
Water Surface
elevation Active erosion in downstream areas or advancing
headcut that is threatening the dam toe. Discharges
RED SHEET A3
are above 20,000 m3/s or as per Table 1 RED
conditions
Potential Embankment Overtopping. Reservoir water
surface elevation is one (1) meter below the top of the ORANGE SHEET B2
Embankment dam.
Overtopping
Water from the reservoir is flowing over the top of the
RED SHEET B3
dam.
Seepage through the dam body. New or minor
seepage at toe, on slope of embankment, abutments BLUE SHEET C1
or galleries, water flowing clear.
New, seriously or rapidly increasing seepage flow rate
Seepage at toe, on slope of embankment, abutments or ORANGE SHEET C2
galleries, water flowing cloudy.
Serious seepage at toe, on slope of embankment,
abutments, or galleries. Incontrollable muddy water RED SHEET C3
flowing, failure of the dam is imminent.
Sinkholes anywhere in the embankment or within 150
m. downstream from the toe. No seepage or flowing BLUE SHEET D1
water
Sinkholes with seepage or flowing water anywhere in
Sinkholes the embankment or within 150 m. downstream from the ORANGE SHEET D2
toe.
Sinkholes rapidly enlarging with muddy water
anywhere in the embankment or within 150 m. RED SHEET D3
downstream from the toe.
Cracks in the embankment crest or slopes greater than
½ cm or ¼ inch. wide and considerable length, without BLUE SHEET E1
seepage.
Cracks in the embankment crest or slopes greater than
Embankment ½ cm or ¼ inch. wide and considerable length, with
ORANGE SHEET E2
Cracking/Movement active movement/slippage and/or seepage through
cracks.
Sudden or rapidly proceeding slides of the
embankment slopes. Cracks that extends to the RED SHEET E3
reservoir elevation
Minor cracks (bigger than ¼ cm.) in the
Concrete/Masonry BLUE SHEET F1
masonry/concrete structure, without leakage.
Structure Cracking
Enlarging cracks (bigger than ¼ cm.) and active ORANGE SHEET F2

ODISHA WATER RESOURCES DEPARTMENT


Action
Event/General Emergency
Specific Observation/Condition Data
Observation Level
Sheet
movement in the masonry/concrete structure, with
leakage passing through.
Enlarging cracks with sudden or rapidly proceeding
movements/displacements in the masonry/concrete RED SHEET F3
structure, with severe leakage passing through.
Instrumentation readings are beyond
Instrumentation BLUE SHEET G1
predetermined/thresholds values.
Structural member of a gate, gate operator broken or
severely damage, which prevents operation or
malfunction of the gate(s). No leakage or uncontrolled BLUE SHEET H1
discharge is detected. Flood can be routed without
damaged/non-operational gate(s)
Structural member of a gate, gate operator broken or
severely damage, which prevents operation or
Malfunction of
malfunction of the gate(s). Considerable leakage or ORANGE SHEET H2
Radial/Sluice Gate(s)
uncontrolled discharge is detected. Flood cannot be
routed without damaged/non-operational gate(s)
Structural member of a gate, gate operator broken or
severely damage, which prevents operation or
malfunction of the gate(s). Unexpected high discharge RED SHEET H3
is occurring. Flood cannot be routed without
damaged/non-operational gate(s)
Measurable earthquake felt or reported and dam
BLUE SHEET I1
appears to be stable
Earthquake resulting in visible damage to the dam or
appurtenances which can cause a potential dangerous ORANGE SHEET I2
Earthquake
situation
Earthquake resulting in uncontrolled release of water
over dam or rapidly developing flow through cracks or RED SHEET I3
rapidly developing erosion through increased seepage
Unverified bomb threat or verified damage to the
dam/appurtenances with no impacts in the functioning BLUE SHEET J1
of the dam.
Verified bomb threat that if carried out, could result in
Security damage the dam/appurtenances that impacts the
Threat/Sabotage/ functioning of the dam OR verified damages due to ORANGE SHEET J2
Vandalism vandalism that impacts the normal operation of the
dam.
Detonated bomb resulting in visible damage to the to
the dam or appurtenances OR verified damages due RED SHEET J3
to vandalism causing an uncontrolled water release

CENTRAL PROJECT MANAGEMENT UNIT


Emergency Action Plan
HIRAKUD DAM [OR10HH0003]

RED Description:
UNEXPECTED FAILURE SHEET #1
ALERT
RECOMMENDED ACTIONS
Emergency Planning Manager
A. Implement the ―Failure Condition Notification Flowchart‖, using pre-scripted message.
B. Activate the Emergency Operations Center
C. Recommend to the Districts Collectors and Disaster Management authorities IMMEDIATE EVACUATION
downstream of the dam and affected areas as per Local Evacuation Plan
D. Stay a safe distance away from the dam. The immediate concern is the safety of the downstream public.
E. Record all information, observations, and actions on an Event Log Form (FORM 1).
Site’s Engineers
F. Stay a safe distance away from the dam
G. Observe conditions in site periodically and provide decision support as appropriate.
Superintending/Chief Engineer
A. Communicate and keep informed the Principal Secretary of Water Resources Department.
Dam Safety Organization’s Staff
H. Provide decision support and technical support to the Emergency Planning Manager as appropriate.

RE-EVALUATION / DECISION based upon ANNEX TABLE I


Evaluate conditions CONTINUOUSLY Using Annex Table I, determine if:

A. The event warrants downgrade if there is no longer an impending threat of dam failure with no additional
rainfall occurring YET there is damage to the dam that prevents safe impoundment of water. All contacts on
Event Level 1 Notification Flow Chart shall be notified of downgrade to Event Level 3.
B. Event may be Terminated only when either:
 There is no longer an impending threat of dam failure with no additional rainfall occurring and it has
been determined by NC Dam Safety staff safe to impound water or;
 The dam has failed AND there is no longer a threat to the downstream public
All contacts on Notification Flow Chart shall be updated of changes

Based on this determination, follow the appropriate actions

A) EVENT LEVEL DOWNGRADE B) TERMINATION

Monitor conditions until damage is


Go to Termination and Follow- up
repaired

ODISHA WATER RESOURCES DEPARTMENT


CENTRAL PROJECT MANAGEMENT UNIT
Emergency Action Plan
HIRAKUD DAM [OR10HH0003]

Event Description:
BLUE
Reservoir water surface elevation is increasing and operation of spillway‘s SHEET A1
ALERT gates is demanded. No active erosion in downstream areas. Discharges are
below 5,000 m3/s (See Table 1)
RECOMMENDED ACTIONS
Emergency Planning Manager (May be split responsibilities, i.e. One person at the dam handling on site actions and a different
person who can make notifications. APPLICABLE TO ALL ACTION DATA SHEETS)
A. Implement the ―Watch Condition Notification Flowchart‖, using pre-scripted message.
B. Make careful observation and inspection of every part of the dam; this should be done without compromising
the safety of anyone performing these tasks. Monitor water levels and spillway area for erosion every two
hours.
C. Record all information, observations, and actions on an Event Log Form (FORM 1).
D. Contact the Superintending/Chief engineer at least daily to report the latest observations and conditions. If
conditions change significantly, go to re-evaluation/decision section and follow relevant steps immediately
Site’s Engineers
E. Observe conditions in site periodically and provide decision support as appropriate.
F. Provide oversight to corrective actions or work as required.
Superintending/Chief Engineer
G. Direct specific and appropriate procedures to open/close the spillway‘s gates during the reservoir operation.
Dam Safety Organization’s Staff
H. Provide decision support and technical support to the Emergency Planning Manager as appropriate.

RE-EVALUATION / DECISION based upon ANNEX TABLE I


Evaluate conditions CONTINUOUSLY Using Annex Table I, determine if:

A. The event can be terminated when spillway flows cease.


B. The event remains at the current Event Level (No change in situation).
C. The event warrants escalation when spillway flows produce either active erosion of channel or spillway flow
that may result in flooding of people downstream (See Table 1, Discharges above 5,000 m3/s for more
than 100 hours duration warrants escalation to ORANGE alert). Link to Annex Table I Level ORANGE
Conditions.

Based on this determination, follow the appropriate actions

A) EVENT LEVEL DOWNGRADE B) TERMINATION C) EVENT LEVEL ESCALATION

Monitor conditions until damage is


Go to Termination and Follow- up Go to SHEET A2 (ORANGE Alert)
repaired

ODISHA WATER RESOURCES DEPARTMENT


CENTRAL PROJECT MANAGEMENT UNIT
Emergency Action Plan
HIRAKUD DAM [OR10HH0003]

Event Description:
ORANGE
Reservoir water surface elevation is increasing and operation of spillway‘s SHEET A2
ALERT gates is demanded. Active erosion in downstream areas. Spillway‘s discharges
are above 15,000 m3/s or as per Table 1 ORANGE conditions
RECOMMENDED ACTIONS
Emergency Planning Manager (May be split responsibilities, i.e. One person at the dam handling on site actions and a different
person who can make notifications. APPLICABLE TO ALL ACTION DATA SHEETS)
A. Implement the ―Failure Condition Notification Flowchart‖, using pre-scripted message.
B. Identify the areas that would be potentially impacted by the emergency events
C. Make careful observation and inspection of every part of the dam; this should be done without compromising
the safety of anyone performing these tasks. Monitor water levels and spillway area for erosion every hour.
D. Record all information, observations, and actions on an Event Log Form (FORM 1).
E. Contact the Superintending/Chief engineer at least daily to report the latest observations and conditions. If
conditions change significantly, go to re-evaluation/decision section and follow relevant steps immediately
Site’s Engineers
F. Observe conditions in site periodically and provide decision support as appropriate.
G. Provide oversight to corrective actions or work as required.
Superintending/Chief Engineer
H. Direct specific and appropriate procedures to open/close the spillway‘s gates during the reservoir operation.
Dam Safety Organization’s Staff
I. Provide decision support and technical support to the Emergency Planning Manager as appropriate.

RE-EVALUATION / DECISION based upon ANNEX TABLE I


Evaluate conditions CONTINUOUSLY Using Annex Table I, determine if:

A. The event warrants downgrade to BLUE alert if ―Spillway flows are decreasing with no additional rainfall
occurring‖ (See See Table 1 for decision-support). All contacts in the Notification Flow Chart shall be
notified of downgrade from ORANGE to BLUE alert.
B. The event remains at the current Event Level (No change in situation).
C. The event warrants escalation to RED alert if either erosion of channel is advancing towards the dam or
spillway is flooding people downstream (See Table 1 for decision-support).

Based on this determination, follow the appropriate actions


B) EVENT/LEVEL REMAINS THE
A) EVENT LEVEL DOWNGRADE C) EVENT LEVEL ESCALATION
SAME

Monitor conditions until gate Continue recommended actions on this


Go to SHEET A3 (RED Alert)
operations cease sheet

ODISHA WATER RESOURCES DEPARTMENT


CENTRAL PROJECT MANAGEMENT UNIT
Emergency Action Plan
HIRAKUD DAM [OR10HH0003]

Event Description:
RED Reservoir water surface elevation is increasing and operation of spillway‘s
gates is demanded. Active erosion in downstream areas or advancing headcut SHEET A3
ALERT
that is threatening the dam toe. Discharges are above 20,000 m3/s or as per
Table 1 RED conditions
RECOMMENDED ACTIONS
Emergency Planning Manager (May be split responsibilities, i.e. One person at the dam handling on site actions and a different
person who can make notifications. APPLICABLE TO ALL ACTION DATA SHEETS)
B. Implement the ―Failure Condition Notification Flowchart‖, using pre-scripted message.
C. Identify the areas that would be potentially impacted by the emergency events
D. Recommend to the Districts Collectors and Disaster Management Authorities IMMEDIATE EVACUATION
downstream of the dam and affected areas as per Local Evacuation Plan.
E. Stay a safe distance away from the dam. The immediate concern is the safety of the downstream public
F. Record all information, observations, and actions on an Event Log Form (FORM 1).
Site’s Engineers
G. Observe conditions in site periodically and provide decision support as appropriate.
Superintending/Chief Engineer
H. Direct specific and appropriate procedures to open/close the spillway‘s gates during the reservoir operation.
Dam Safety Organization’s Staff
I. Provide decision support and technical support to the Emergency Planning Manager as appropriate.

RE-EVALUATION / DECISION based upon ANNEX TABLE I


Evaluate conditions CONTINUOUSLY Using Annex Table I, determine if:

A. The event warrants downgrade to BLUE alert if ―Spillway flows are decreasing with no additional rainfall
occurring‖ (Link to Table 1.3 Level GREEN ―Conditions‖). All contacts in the Notification Flow Chart shall be
notified of downgrade from RED to BLUE alert.
B. The event remains at the current Event Level (No change in situation).
C. Event may be Terminated only when either:
 Spillway flows have stopped with no additional rainfall occurring and it has been determined by
Dam safety Organization‘s staff is safe to impound water or;
 The dam has failed AND there is no longer a threat to the downstream public
All contacts on Notification Flow Chart shall be updated of changes

Based on this determination, follow the appropriate actions


B) EVENT/LEVEL RAMAINS THE
A) EVENT LEVEL DOWNGRADE C) EVENT LEVEL ESCALATION
SAME

Monitor conditions until damage is Continue recommended actions on this


Go to Termination and Follow- up
repaired sheet

ODISHA WATER RESOURCES DEPARTMENT


CENTRAL PROJECT MANAGEMENT UNIT
Emergency Action Plan
HIRAKUD DAM [OR10HH0003]

Event Description:
ORANGE
Potential Embankment Overtopping. Reservoir water surface elevation is one SHEET B2
ALERT (1) meter below the top of the dam.

RECOMMENDED ACTIONS
Emergency Planning Manager
A. Implement the ―Failure Condition Notification Flowchart‖, using pre-scripted message.
B. Identify the areas that would be potentially impacted by the emergency events
C. Make careful observation and inspection of every part of the dam; this should be done without compromising
the safety of anyone performing these tasks. Monitor water levels and spillway area for erosion every 15
minutes.
D. Record all information, observations, and actions on an Event Log Form (FORM 1).
E. Use ―a bottom drain, installed siphon or pumps located on-site‖ to provide additional drawdown of the lake
level.
F. Contact the Superintending/Chief engineer hourly to report the latest observations and conditions. If conditions
change significantly, go to re-evaluation/decision section and follow relevant steps immediately
Site’s Engineers
G. Observe conditions in site periodically and provide decision support as appropriate.
H. Provide oversight to corrective actions or work as required.
Superintending/Chief Engineer
I. Direct specific and appropriate procedures to open/close the spillway‘s gates during the reservoir operation.
Dam Safety Organization’s Staff
J. Provide decision support and technical support to the Emergency Planning Manager as appropriate.

RE-EVALUATION / DECISION based upon ANNEX TABLE I


Evaluate conditions CONTINUOUSLY Using Annex Table I, determine if:

D. The event warrants downgrade to BLUE alert if rainfall has stopped and slowing additional inflow to lake.
Reservoir levels are below MWL. All contacts in the Notification Flow Chart shall be notified of downgrade
from ORANGE to BLUE alert.
E. The event remains at the current Event Level (No change in situation).
F. The event warrants escalation to RED alert if water begins to overtop the embankment.

Based on this determination, follow the appropriate actions

A) EVENT LEVEL DOWNGRADE B) ORANGE ALERT (NO CHANGE) C) EVENT LEVEL ESCALATION

Declare BLUE alert and Monitor


Continue recommended actions on this
conditions until reservoir levels go Go to SHEET B3 (RED Alert)
sheet
below Full Reservoir Level (FRL)

ODISHA WATER RESOURCES DEPARTMENT


CENTRAL PROJECT MANAGEMENT UNIT
Emergency Action Plan
HIRAKUD DAM [OR10HH0003]

RED Event Description:


Embankment Overtopping. Water from the reservoir is flowing over the top of SHEET B3
ALERT
the dam.
RECOMMENDED ACTIONS
Emergency Planning Manager (May be split responsibilities, i.e. One person at the dam handling on site actions and a different
person who can make notifications. APPLICABLE TO ALL ACTION DATA SHEETS)
J. Implement the ―Failure Condition Notification Flowchart‖, using pre-scripted message.
K. Identify the areas that would be potentially impacted by the emergency events
L. Recommend to the Districts Collectors and Disaster Management Authorities IMMEDIATE EVACUATION
downstream of the dam and affected areas as per Local Evacuation Plan.
M. Stay a safe distance away from the dam. The immediate concern is the safety of the downstream public
N. Record all information, observations, and actions on an Event Log Form (FORM 1).
Site’s Engineers
O. Observe conditions from a safe place at dam site periodically and provide decision support as appropriate.
Superintending/Chief Engineer
P. Direct specific and appropriate procedures to open/close the spillway‘s gates during the reservoir operation.
Dam Safety Organization’s Staff
Q. Provide decision support and technical support to the Emergency Planning Manager as appropriate.

RE-EVALUATION / DECISION based upon ANNEX TABLE I


Evaluate the situation as events progress, or whenever conditions change. Determine whether:
A. The event remains at the current Event Level (No change in situation).
B. Event may be Terminated only when either:
 Spillway flows have stopped with no additional rainfall occurring and it has been determined by
Dam safety Organization‘s staff is safe to impound water or;
 The dam has failed AND there is no longer a threat to the downstream public
All contacts on Notification Flow Chart shall be updated of changes

Based on this determination, follow the appropriate actions


B) EVENT/LEVEL REMAINS THE
A) EVENT LEVEL DOWNGRADE C) TERMINATION
SAME

Monitor conditions until damage is Continue recommended actions on this


Go to Termination and Follow- up
repaired sheet

ODISHA WATER RESOURCES DEPARTMENT


CENTRAL PROJECT MANAGEMENT UNIT
Emergency Action Plan
HIRAKUD DAM [OR10HH0003]

BLUE Event Description:


Seepage through the dam body. New or minor seepage at toe, on slope of SHEET C1
ALERT
embankment, abutments or galleries, water flowing clear.
RECOMMENDED ACTIONS
Emergency Planning Manager (May be split responsibilities, i.e. One person at the dam handling on site actions and a different
person who can make notifications. APPLICABLE TO ALL ACTION DATA SHEETS)
A. Implement the ―Watch Condition Notification Flowchart‖, using pre-scripted message.
B. Make careful observation and inspection of every part of the dam; this should be done without compromising
the safety of anyone performing these tasks. Monitor water levels and seepage points for cloudy discharge or
increased flow rates every two hours. Attempt to determine source of seepage
C. Record all information, observations, and actions on an Event Log Form (FORM 1).
D. Contact the Superintending/Chief engineer at least daily to report the latest observations and conditions. If
conditions change significantly, go to re-evaluation/decision section and follow relevant steps immediately
Site’s Engineers
E. Observe conditions in site periodically and provide decision support as appropriate. Try to channel and
measure flow
F. Use wooden stakes or flagging to delineate seepage area.. Look for upstream whirpools.
Superintending/Chief Engineer
G. Review all pertinent information in order to recommend appropriate actions to the Emergency Planning
Manager in conjunction with Dam Safety Organization‘s Staff. Provide oversight to corrective actions or work as
required. Observe conditions in site periodically and provide decision support as appropriate.
Dam Safety Organization’s Staff
H. Provide decision support and technical support to the Emergency Planning Manager as appropriate.

RE-EVALUATION / DECISION based upon ANNEX TABLE I


Evaluate conditions at least daily, or whenever conditions change significantly. Using Annex Table I, determine
whether:
A. The event can be terminated if seepage flow has been remedied and it has been determined by Dam
Safety Organization‘s staff safe to impound water.
B. The event remains at the current Event Level (No change in situation).
C. The event warrants escalation to ORANGE alert if discharge becomes cloudy or increased flow rate.
All contacts on Notification Flow Chart shall be updated of changes

Based on this determination, follow the appropriate actions


B) EVENT/LEVEL REMAINS THE
A) TERMINATION C) EVENT LEVEL ESCALATION
SAME

Continue recommended actions on this


Go to Termination and Follow- up Go to SHEET C2 (ORANGE Alert)
sheet

ODISHA WATER RESOURCES DEPARTMENT


CENTRAL PROJECT MANAGEMENT UNIT
Emergency Action Plan
HIRAKUD DAM [OR10HH0003]

Event Description:
ORANGE
Seepage through the dam body. New, seriously or rapidly increasing seepage SHEET C2
ALERT flow rate at toe, on slope of embankment, abutments or galleries, water
flowing cloudy.
RECOMMENDED ACTIONS
Emergency Planning Manager
K. Implement the ―Failure Condition Notification Flowchart‖, using pre-scripted message.
L. Identify the areas that would be potentially impacted by the emergency events
M. Make careful observation and inspection of every part of the dam; this should be done without compromising
the safety of anyone performing these tasks. Monitor water levels and seepage points for cloudy discharge or
increased flow rates every two hours.
N. Record all information, observations, and actions on an Event Log Form (FORM 1).
O. Contact the Superintending/Chief engineer hourly to report the latest observations and conditions. If conditions
change significantly, go to re-evaluation/decision section and follow relevant steps immediately
Site’s Engineers
P. Observe conditions in site periodically and provide decision support as appropriate.
Q. If Conditions permit: plug the flow from upstream side with available material (bentonite or plastic sheeting).
Place an invert filter (layered sand and gravel) over the exit area to hold soil material in place.
R. Construct a large ring dike around the seepage area as appropriate.
S. Provide oversight to corrective actions or work as required.
Superintending/Chief Engineer
T. Study an emergency lowering of the reservoir.
Dam Safety Organization’s Staff
U. Provide decision support and technical support to the Emergency Planning Manager as appropriate.

RE-EVALUATION / DECISION based upon ANNEX TABLE I


Evaluate conditions at least twice daily, or whenever conditions change significantly. Using Annex Table I,
determine whether:
A. The event warrants downgrade to BLUE alert if water level in lake is lowered below level of seepage.
B. The event remains at the current Event Level (No change in situation).
C. The event warrants escalation to RED alert if the integrity of the dam appears to be threatened.
All contacts on Notification Flow Chart shall be updated of changes

Based on this determination, follow the appropriate actions

A) EVENT LEVEL DOWNGRADE B) ORANGE ALERT (NO CHANGE) C) EVENT LEVEL ESCALATION

Continue recommended actions on this


Go to SHEET C1(Blue Alert) Go to SHEET C3 (RED Alert)
sheet

ODISHA WATER RESOURCES DEPARTMENT


CENTRAL PROJECT MANAGEMENT UNIT
Emergency Action Plan
HIRAKUD DAM [OR10HH0003]

Event Description:
RED
Seepage through the dam body. Serious seepage at toe, on slope of SHEET C3
ALERT embankment, abutments, or galleries. Incontrollable muddy water flowing,
failure of the dam is imminent.
RECOMMENDED ACTIONS
Emergency Planning Manager (May be split responsibilities, i.e. One person at the dam handling on site actions and a different
person who can make notifications. APPLICABLE TO ALL ACTION DATA SHEETS)
A. Implement the ―Failure Condition Notification Flowchart‖, using pre-scripted message.
B. Identify the areas that would be potentially impacted by the emergency events
C. Recommend to the Districts Collectors and Disaster Management Authorities IMMEDIATE EVACUATION
downstream of the dam and affected areas as per Local Evacuation Plan.
D. Stay a safe distance away from the dam. The immediate concern is the safety of the downstream public
E. Record all information, observations, and actions on an Event Log Form (FORM 1).
Site’s Engineers
F. Observe conditions from a safe place at dam site periodically and provide decision support as appropriate.
G. Construct a large ring dike around the seepage area as appropriate.
Superintending/Chief Engineer
H. Provide decision support and technical support to the Emergency Planning Manager as appropriate.
Dam Safety Organization’s Staff
I. Provide decision support and technical support to the Emergency Planning Manager as appropriate.

RE-EVALUATION / DECISION based upon ANNEX TABLE I


Evaluate the situation as events progress, or whenever conditions change. Determine whether:
A. The event warrants downgrade to BLUE alert if seepage has stopped and water level in reservoir is lowered
below level of seepage.
B. The event remains at the current Event Level (No change in situation).
C. Event may be Terminated only when :
 The dam has failed AND there is no longer a threat to the downstream public. (Confirmed by Disaster
Management Authorities)
All contacts on Notification Flow Chart shall be updated of changes

Based on this determination, follow the appropriate actions


B) EVENT/LEVEL REMAINS THE
A) EVENT LEVEL DOWNGRADE C) TERMINATION
SAME

Monitor conditions until damage is Continue recommended actions on this


Go to Termination and Follow- up
repaired sheet

ODISHA WATER RESOURCES DEPARTMENT


CENTRAL PROJECT MANAGEMENT UNIT
Emergency Action Plan
HIRAKUD DAM [OR10HH0003]

BLUE Event Description:


Sinkholes anywhere in the embankment or within 150 m. downstream from the SHEET D1
ALERT
toe. No seepage or flowing water
RECOMMENDED ACTIONS
Emergency Planning Manager (May be split responsibilities, i.e. One person at the dam handling on site actions and a different
person who can make notifications. APPLICABLE TO ALL ACTION DATA SHEETS)
A. Implement the ―Watch Condition Notification Flowchart‖, using pre-scripted message.
B. Make careful observation and inspection of every part of the dam; this should be done without compromising
the safety of anyone performing these tasks.
C. Monitor water levels and change in diameter or depth of sinkhole every two hours. Attempt to determine source
of sinkhole
D. Record all information, observations, and actions on an Event Log Form (FORM 1).
E. Contact the Superintending/Chief engineer at least daily to report the latest observations and conditions. If
conditions change significantly, go to re-evaluation/decision section and follow relevant steps immediately
Site’s Engineers
F. Photograph and record the location, size and depth of the depression/sinkhole. Carefully walk the entire
embankment and downstream area looking for additional sinkholes, movement or seepage.
G. Use wooden stakes or flagging to delineate sinkhole area. Look for upstream whirlpools.
Superintending/Chief Engineer
H. Review all pertinent information in order to recommend appropriate actions to the Emergency Planning
Manager in conjunction with Dam Safety Organization‘s Staff. Provide oversight to corrective actions or work as
required. Observe conditions in site periodically and provide decision support as appropriate.
Dam Safety Organization’s Staff
I. Provide decision support and technical support to the Emergency Planning Manager as appropriate.

RE-EVALUATION / DECISION based upon ANNEX TABLE I


Evaluate conditions at least daily, or whenever conditions change significantly. Using Annex Table I, determine
whether:
A. The event can be terminated if sinkhole has been repaired and it has been determined by Dam Safety
Organization‘s staff safe to impound water.
B. The event remains at the current Event Level (No change in situation).
C. The event warrants escalation to ORANGE alert if size of sinkhole is increasing progressively or flowing water
(seepage) shows through the sinkhole.
All contacts on Notification Flow Chart shall be updated of changes

Based on this determination, follow the appropriate actions


B) EVENT/LEVEL REMAINS THE
A) TERMINATION C) EVENT LEVEL ESCALATION
SAME

Continue recommended actions on this


Go to Termination and Follow- up Go to SHEET D2 (ORANGE Alert)
sheet

ODISHA WATER RESOURCES DEPARTMENT


CENTRAL PROJECT MANAGEMENT UNIT
Emergency Action Plan
HIRAKUD DAM [OR10HH0003]

ORANGE Event Description:


Sinkholes with seepage or flowing water anywhere in the embankment or within SHEET D2
ALERT
150 m. downstream from the toe.
RECOMMENDED ACTIONS
Emergency Planning Manager
A. Implement the ―Failure Condition Notification Flowchart‖, using pre-scripted message.
B. Identify the areas that would be potentially impacted by the emergency events
C. Make careful observation and inspection of every part of the dam; this should be done without compromising
the safety of anyone performing these tasks.
D. Monitor water levels and change in diameter or depth of sinkhole every two hours.
E. Record all information, observations, and actions on an Event Log Form (FORM 1).
F. Contact the Superintending/Chief engineer hourly to report the latest observations and conditions. If conditions
change significantly, go to re-evaluation/decision section and follow relevant steps immediately
Site’s Engineers
G. Observe conditions in site periodically and provide decision support as appropriate.
H. If conditions permit: plug the flow from upstream side with available material (bentonite or plastic sheeting).
Place an invert filter (layered sand and gravel) over the exit area to hold soil material in place.
I. Construct a large ring dike around the seepage area as appropriate to reduce the flow rate.
J. Provide oversight to corrective actions or work as required.
Superintending/Chief Engineer
K. Study an emergency lowering of the reservoir.
Dam Safety Organization’s Staff
L. Provide decision support and technical support to the Emergency Planning Manager as appropriate.

RE-EVALUATION / DECISION based upon ANNEX TABLE I


Evaluate conditions at least twice daily, or whenever conditions change significantly. Using Annex Table I,
determine whether:
A. The event warrants downgrade to BLUE alert if water level in lake is lowered below bottom level of sinkhole.
B. The event remains at the current Event Level (No change in situation).
C. The event warrants escalation to RED alert if the sinkhole enlarges or new sinkholes begin to form.
All contacts on Notification Flow Chart shall be updated of changes

Based on this determination, follow the appropriate actions

A) EVENT LEVEL DOWNGRADE B) ORANGE ALERT (NO CHANGE) C) EVENT LEVEL ESCALATION

Continue recommended actions on this


Go to SHEET D1(Blue Alert) Go to SHEET D3 (RED Alert)
sheet

ODISHA WATER RESOURCES DEPARTMENT


CENTRAL PROJECT MANAGEMENT UNIT
Emergency Action Plan
HIRAKUD DAM [OR10HH0003]

RED Event Description:


Sinkholes rapidly enlarging with muddy water anywhere in the embankment or SHEET D3
ALERT
within 150 m. downstream from the toe.
RECOMMENDED ACTIONS
Emergency Planning Manager (May be split responsibilities, i.e. One person at the dam handling on site actions and a different
person who can make notifications. APPLICABLE TO ALL ACTION DATA SHEETS)
A. Implement the ―Failure Condition Notification Flowchart‖, using pre-scripted message.
B. Identify the areas that would be potentially impacted by the emergency events
C. Recommend to the Districts Collectors and Disaster Management Authorities IMMEDIATE EVACUATION
downstream of the dam and affected areas as per Local Evacuation Plan.
D. Stay a safe distance away from the dam. The immediate concern is the safety of the downstream public
E. Record all information, observations, and actions on an Event Log Form (FORM 1).
Site’s Engineers
F. Observe conditions from a safe place at dam site periodically and provide decision support as appropriate.
G. Construct a large ring dike around the seepage area as appropriate.
Superintending/Chief Engineer
H. Provide decision support and technical support to the Emergency Planning Manager as appropriate.
Dam Safety Organization’s Staff
I. Provide decision support and technical support to the Emergency Planning Manager as appropriate.

RE-EVALUATION / DECISION based upon ANNEX TABLE I


Evaluate the situation as events progress, or whenever conditions change. Determine whether:
A. The event warrants downgrade to BLUE alert if there is no longer an immediate impending threat of dam failure
and water level in lake is lowered below bottom level of sinkhole.
B. The event remains at the current Event Level (No change in situation).
C. Event may be Terminated only when :
 The dam has failed AND there is no longer a threat to the downstream public. (Confirmed by Disaster
Management Authorities)
All contacts on Notification Flow Chart shall be updated of changes

Based on this determination, follow the appropriate actions


B) EVENT/LEVEL REMAINS THE
A) EVENT LEVEL DOWNGRADE C) TERMINATION
SAME

Monitor conditions until damage is Continue recommended actions on this


Go to Termination and Follow- up
repaired sheet

ODISHA WATER RESOURCES DEPARTMENT


CENTRAL PROJECT MANAGEMENT UNIT
Emergency Action Plan
HIRAKUD DAM [OR10HH0003]

BLUE Event Description:


Embankment Cracking. Cracks in the embankment crest or slopes greater than SHEET E1
ALERT
½ cm or ¼ inch. wide and considerable length, without seepage.
RECOMMENDED ACTIONS
Emergency Planning Manager (May be split responsibilities, i.e. One person at the dam handling on site actions and a different
person who can make notifications. APPLICABLE TO ALL ACTION DATA SHEETS)
J. Implement the ―Watch Condition Notification Flowchart‖, using pre-scripted message.
K. Make careful observation and inspection of every part of the dam; this should be done without compromising
the safety of anyone performing these tasks.
L. Monitor water levels and crack widths for movement or seepage .
M. Record all information, observations, and actions on an Event Log Form (FORM 1).
N. Contact the Superintending/Chief engineer at least daily to report the latest observations and conditions. If
conditions change significantly, go to re-evaluation/decision section and follow relevant steps immediately
Site’s Engineers
O. Photograph and record the location, depth, length, width, and offset of each crack that has been discovered.
Stakes should be placed at the ends of the cracks, and the distance between the stakes measured and
recorded. Compare observations with earlier results.
P. Closely monitor the crack for changes and scarping.
Superintending/Chief Engineer
Q. Review all pertinent information in order to recommend appropriate actions to the Emergency Planning
Manager in conjunction with Dam Safety Organization‘s Staff. Provide oversight to corrective actions or work as
required. Observe conditions in site periodically and provide decision support as appropriate.
Dam Safety Organization’s Staff
R. Provide decision support and technical support to the Emergency Planning Manager as appropriate.

RE-EVALUATION / DECISION based upon ANNEX TABLE I


Evaluate conditions at least daily, or whenever conditions change significantly. Using Annex Table I, determine
whether:
A. The event can be terminated if it‘s determined that the dam no longer poses an immediate threat to downstream
by Dam Safety Organization‘s staff.
B. The event remains at the current Event Level (No change in situation).
C. The event warrants escalation to ORANGE alert if cracks are enlarging or water begins to flow from cracks.
All contacts on Notification Flow Chart shall be updated of changes

Based on this determination, follow the appropriate actions


B) EVENT/LEVEL REMAINS THE
A) TERMINATION C) EVENT LEVEL ESCALATION
SAME

Continue recommended actions on this


Go to Termination and Follow- up Go to SHEET E2 (ORANGE Alert)
sheet

ODISHA WATER RESOURCES DEPARTMENT


CENTRAL PROJECT MANAGEMENT UNIT
Emergency Action Plan
HIRAKUD DAM [OR10HH0003]

Event Description:
ORANGE
Embankment Cracking with movement. Cracks in the embankment crest or slopes SHEET E2
ALERT greater than ½ cm or ¼ inch. wide and considerable length, with active
movement and/or seepage through cracks.
RECOMMENDED ACTIONS
Emergency Planning Manager
A. Implement the ―Failure Condition Notification Flowchart‖, using pre-scripted message.
B. Identify the areas that would be potentially impacted by the emergency events
C. Make careful observation and inspection of every part of the dam; this should be done without compromising
the safety of anyone performing these tasks.
D. Monitor water levels and development of new cracks or movement hourly.
E. Record all information, observations, and actions on an Event Log Form (FORM 1).
F. Contact the Superintending/Chief engineer hourly to report the latest observations and conditions. If conditions
change significantly, go to re-evaluation/decision section and follow relevant steps immediately
Site’s Engineers
G. Observe conditions in site periodically and provide decision support as appropriate.
H. If conditions permit: Stabilize slides on the downstream slope by weighting the toe area below the slide with
additional soil, rock or gravel.
I. Construct a large ring dike around the seepage area as appropriate to reduce the flow rate if is the case.
J. Provide oversight to corrective actions or work as required.
Superintending/Chief Engineer
K. Study an emergency lowering of the reservoir.
Dam Safety Organization’s Staff
L. Provide decision support and technical support to the Emergency Planning Manager as appropriate.

RE-EVALUATION / DECISION based upon ANNEX TABLE I


Evaluate conditions at least twice daily, or whenever conditions change significantly. Using Annex Table I,
determine whether:
A. The event warrants downgrade to BLUE alert if water level in lake is lowered below below bottom level of
embankment fill. Event may not be terminated until repairs are made
B. The event remains at the current Event Level (No change in situation).
C. The event warrants escalation to RED alert if the integrity of the dam appears to be threatened by sudden or
rapidly proceeding slides.
All contacts on Notification Flow Chart shall be updated of changes

Based on this determination, follow the appropriate actions

A) EVENT LEVEL DOWNGRADE B) ORANGE ALERT (NO CHANGE) C) EVENT LEVEL ESCALATION

Continue recommended actions on this


Go to SHEET E1(Blue Alert) Go to SHEET E3 (RED Alert)
sheet

ODISHA WATER RESOURCES DEPARTMENT


CENTRAL PROJECT MANAGEMENT UNIT
Emergency Action Plan
HIRAKUD DAM [OR10HH0003]

RED Event Description:


Embankment Cracking and active movement. Sudden or rapidly proceeding SHEET E3
ALERT
slides of the embankment slopes. Cracks that extends to the reservoir elevation
RECOMMENDED ACTIONS
Emergency Planning Manager (May be split responsibilities, i.e. One person at the dam handling on site actions and a different
person who can make notifications. APPLICABLE TO ALL ACTION DATA SHEETS)
J. Implement the ―Failure Condition Notification Flowchart‖, using pre-scripted message.
K. Identify the areas that would be potentially impacted by the emergency events
L. Recommend to the Districts Collectors and Disaster Management Authorities IMMEDIATE EVACUATION
downstream of the dam and affected areas as per Local Evacuation Plan.
M. Stay a safe distance away from the dam. The immediate concern is the safety of the downstream public
N. Record all information, observations, and actions on an Event Log Form (FORM 1).
Site’s Engineers
O. Observe conditions from a safe place at dam site periodically and provide decision support as appropriate.
Superintending/Chief Engineer
P. Provide decision support and technical support to the Emergency Planning Manager as appropriate.
Dam Safety Organization’s Staff
Q. Provide decision support and technical support to the Emergency Planning Manager as appropriate.

RE-EVALUATION / DECISION based upon ANNEX TABLE I


Evaluate the situation as events progress, or whenever conditions change. Determine whether:
A. The event warrants downgrade if there is no longer an immediate impending threat of dam failure and water
level in lake is lowered below bottom level of embankment fill.
B. The event remains at the current Event Level (No change in situation).
C. Event may be Terminated only when :
 The dam has failed AND there is no longer a threat to the downstream public. (Confirmed by Disaster
Management Authorities)
All contacts on Notification Flow Chart shall be updated of changes

Based on this determination, follow the appropriate actions


B) EVENT/LEVEL REMAINS THE
A) EVENT LEVEL DOWNGRADE C) TERMINATION
SAME

Monitor conditions until damage is Continue recommended actions on this


Go to Termination and Follow- up
repaired sheet

ODISHA WATER RESOURCES DEPARTMENT


CENTRAL PROJECT MANAGEMENT UNIT
Emergency Action Plan
HIRAKUD DAM [OR10HH0003]

BLUE Event Description:


Concrete/Masonry Structure Cracking. Minor cracks (bigger than ¼ cm.) in the SHEET F1
ALERT
masonry/concrete structure, without leakage.
RECOMMENDED ACTIONS
Emergency Planning Manager (May be split responsibilities, i.e. One person at the dam handling on site actions and a different
person who can make notifications. APPLICABLE TO ALL ACTION DATA SHEETS)
A. Implement the ―Watch Condition Notification Flowchart‖, using pre-scripted message.
B. Make careful observation and inspection of every part of the dam; this should be done without compromising
the safety of anyone performing these tasks.
C. Monitor water levels in the reservoir. Install a measurement device to monitor progress/movement in crack(s)
D. Classify and describe the type of crack pattern and evaluate possible causes.
E. Record all information, observations, and actions on an Event Log Form (FORM 1).
F. Contact the Superintending/Chief engineer at least daily to report the latest observations and conditions. If
conditions change significantly, go to re-evaluation/decision section and follow relevant steps immediately
Site’s Engineers
G. Photograph and record the location, direction (longitudinal, vertical, diagonal, etc.), depth, length, width, and
offset of each crack that has been discovered. Compare observations with earlier results.
H. Closely monitor the crack for changes and look for structural damage, including misalignment, settlement,
vertical and horizontal displacement.
Superintending/Chief Engineer
I. Review all pertinent information in order to recommend appropriate actions to the Emergency Planning
Manager in conjunction with Dam Safety Organization‘s Staff. Provide oversight to corrective actions or work as
required. Observe conditions in site periodically and provide decision support as appropriate.
Dam Safety Organization’s Staff
J. Provide decision support and technical support to the Emergency Planning Manager as appropriate.

RE-EVALUATION / DECISION based upon ANNEX TABLE I


Evaluate conditions at least daily, or whenever conditions change significantly. Using Annex Table I, determine
whether:
A. The event can be terminated if it‘s determined that the dam no longer poses an immediate threat to downstream
by Dam Safety Organization‘s staff.
B. The event remains at the current Event Level (No change in situation).
C. The event warrants escalation to ORANGE alert if cracks are enlarging AND leakage begins to flow from
cracks.
All contacts on Notification Flow Chart shall be updated of changes

Based on this determination, follow the appropriate actions


B) EVENT/LEVEL REMAINS THE
A) TERMINATION C) EVENT LEVEL ESCALATION
SAME

Continue recommended actions on this


Go to Termination and Follow- up Go to SHEET F2 (ORANGE Alert)
sheet

ODISHA WATER RESOURCES DEPARTMENT


CENTRAL PROJECT MANAGEMENT UNIT
Emergency Action Plan
HIRAKUD DAM [OR10HH0003]

Event Description:
ORANGE
Concrete/Masonry Structure Cracking. Enlarging cracks (bigger than ¼ cm.) SHEET F2
ALERT and active movement in the masonry/concrete structure, with leakage passing
through.
RECOMMENDED ACTIONS
Emergency Planning Manager
A. Implement the ―Failure Condition Notification Flowchart‖, using pre-scripted message.
B. Identify the areas that would be potentially impacted by the emergency events
C. Make careful observation and inspection of every part of the dam; this should be done without compromising
the safety of anyone performing these tasks. Look closely for changes in the spillways and outlet structures that
may be affected by the structural. Items to check include vertical, horizontal and lateral displacements, structural
cracking, and tilting of spillway walls
D. Monitor water levels and development of new cracks or movement hourly.
E. Record all information, observations, and actions on an Event Log Form (FORM 1).
F. Contact the Superintending/Chief engineer hourly to report the latest observations and conditions. If conditions
change significantly, go to re-evaluation/decision section and follow relevant steps immediately
Site’s Engineers
G. Observe conditions in site periodically and provide decision support as appropriate.
H. If conditions permit: Dump large rock on downstream of moving concrete structure monolith to resist the
movement. Lower burlap on upstream face of crack(s) to reduce flow of soil particles
I. Provide oversight to corrective actions or work as required.
Superintending/Chief Engineer
J. Study an emergency lowering of the reservoir.
Dam Safety Organization’s Staff
K. Provide decision support and technical support to the Emergency Planning Manager as appropriate.

RE-EVALUATION / DECISION based upon ANNEX TABLE I


Evaluate conditions at least twice daily, or whenever conditions change significantly. Using Annex Table I,
determine whether:
D. The event warrants downgrade to BLUE alert if water level in lake is lowered to safe levels. Event may not be
terminated until repairs are made and causes of cracking/movement has been determined
E. The event remains at the current Event Level (No change in situation).
F. The event warrants escalation to RED alert if the integrity of the dam appears to be threatened by sudden or
rapidly proceeding movements/displacements.
All contacts on Notification Flow Chart shall be updated of changes

Based on this determination, follow the appropriate actions

A) EVENT LEVEL DOWNGRADE B) ORANGE ALERT (NO CHANGE) C) EVENT LEVEL ESCALATION

Continue recommended actions on this


Go to (Blue Alert) Go to SHEET F3 (RED Alert)
sheet

ODISHA WATER RESOURCES DEPARTMENT


CENTRAL PROJECT MANAGEMENT UNIT
Emergency Action Plan
HIRAKUD DAM [OR10HH0003]

Event Description:
RED
Concrete/Masonry Structure Cracking. Enlarging cracks with sudden or rapidly SHEET F3
ALERT proceeding movements/displacements in the masonry/concrete structure, with
severe leakage passing through.
RECOMMENDED ACTIONS
Emergency Planning Manager (May be split responsibilities, i.e. One person at the dam handling on site actions and a different
person who can make notifications. APPLICABLE TO ALL ACTION DATA SHEETS)
R. Implement the ―Failure Condition Notification Flowchart‖, using pre-scripted message.
S. Identify the areas that would be potentially impacted by the emergency events
T. Recommend to the Districts Collectors and Disaster Management Authorities IMMEDIATE EVACUATION
downstream of the dam and affected areas as per Local Evacuation Plan.
U. Stay a safe distance away from the dam. The immediate concern is the safety of the downstream public
V. Record all information, observations, and actions on an Event Log Form (FORM 1).
Site’s Engineers
W. Observe conditions from a safe place at dam site periodically and provide decision support as appropriate.
Superintending/Chief Engineer
X. Provide decision support and technical support to the Emergency Planning Manager as appropriate.
Dam Safety Organization’s Staff
Y. Provide decision support and technical support to the Emergency Planning Manager as appropriate.

RE-EVALUATION / DECISION based upon ANNEX TABLE I


Evaluate the situation as events progress, or whenever conditions change. Determine whether:
D. The event warrants downgrade to BLUE alert if there is no longer an immediate impending threat of dam failure
and water level in lake is lowered to a safe level. (Confirmed by Dam Safety Organization‘s staff)
E. The event remains at the current Event Level (No change in situation).
F. Event may be Terminated only when :
 The dam has failed AND there is no longer a threat to the downstream public. (Confirmed by Disaster
Management Authorities)
All contacts on Notification Flow Chart shall be updated of changes

Based on this determination, follow the appropriate actions


B) EVENT/LEVEL REMAINS THE
A) EVENT LEVEL DOWNGRADE C) TERMINATION
SAME

Monitor conditions until damage is Continue recommended actions on this


Go to Termination and Follow- up
repaired sheet

ODISHA WATER RESOURCES DEPARTMENT


CENTRAL PROJECT MANAGEMENT UNIT
Emergency Action Plan
HIRAKUD DAM [OR10HH0003]

BLUE Event Description:


Instrumentation readings are beyond predetermined/thresholds values. SHEET G1
ALERT
RECOMMENDED ACTIONS
Emergency Planning Manager (May be split responsibilities, i.e. One person at the dam handling on site actions and a different
person who can make notifications. APPLICABLE TO ALL ACTION DATA SHEETS)
A. Implement the ―Watch Condition Notification Flowchart‖, using pre-scripted message.
B. Make careful observation and inspection of every part of the dam related with the instruments measurements
C. Monitor water levels and instrument readings for changes or anomalies.
D. Record all information, observations, and actions on an Event Log Form (FORM 1).
E. Contact the Superintending/Chief engineer at least daily to report the latest observations and conditions.
F. If instrumentation readings at the dam are determined to indicate a potentially dangerous situation, go to the
re-evaluation/decision section and follow relevant steps immediately.
Site’s Engineers
G. Contact the Quality assurance/ monitoring Division to inform the anomalies
H. Closely monitor the instruments‘ performance and increase frequency readings to determine
negative/dangerous trends.
Superintending/Chief Engineer
I. Review all pertinent information in order to recommend appropriate actions to the Emergency Planning
Manager in conjunction with Dam Safety Organization‘s Staff. Provide oversight to corrective actions or work as
required. Observe conditions in site periodically and provide decision support as appropriate.
Dam Safety Organization’s Staff
J. Provide decision support and technical support to the Emergency Planning Manager as appropriate.

RE-EVALUATION / DECISION based upon ANNEX TABLE I


Evaluate conditions at least daily, or whenever conditions change significantly. Using Annex Table I, determine
whether:
A. The event can be terminated if instrumentation readings back to normal or if instrument reading determined to
be invalid.
B. The event remains at the current Event Level (No change in situation).
C. The event warrants escalation, (determined using Annex Table I) if instrumentation readings at the dam are
determined to indicate a potentially dangerous situation.
All contacts on Notification Flow Chart shall be updated of changes

Based on this determination, follow the appropriate actions


B) EVENT/LEVEL REMAINS THE
A) TERMINATION C) EVENT LEVEL ESCALATION
SAME
Go toSHEET D2 Annex Table I
Continue recommended actions on this to determine type of
Go to Termination and Follow- up
sheet event/dangerous situation revealed
by the instruments‘ anomalies

ODISHA WATER RESOURCES DEPARTMENT


CENTRAL PROJECT MANAGEMENT UNIT
Emergency Action Plan
HIRAKUD DAM [OR10HH0003]

Event Description:
BLUE Malfunction of Radial/Sluice Gate(s). Structural member of a gate, gate
operator broken or severely damage, which prevents operation or malfunction SHEET H1
ALERT
of the gate(s). No leakage or uncontrolled discharge is detected. Flood can be
routed without damaged/non-operational gate(s)
RECOMMENDED ACTIONS
Emergency Planning Manager
K. Implement the ―Watch Condition Notification Flowchart‖, using pre-scripted message.
L. Make careful observation and inspection of every part of spillway mechanisms.
M. Monitor water levels and flood forecasting reports continuously. Verify the rest of spillway‘s gates are operative
N. Record all information, observations, and actions on an Event Log Form (FORM 1).
O. Contact the Superintending/Chief engineer at least daily to report the latest observations and conditions.
P. If leakage or uncontrolled release is detected at the dam and indicate a potentially dangerous situation, go to
the re-evaluation/decision section and follow relevant steps immediately.
Q. If forecasting reports bring about the need to operate the damaged/non-operational gate(s) go to the re-
evaluation/decision section and follow relevant steps immediately.
Site’s Engineers
R. Contact the Hydro-Mechanical/ Maintenance Division to inform the anomalies
S. Monitor and supervise any remedial action and inform the Emergency Planning Manager about the progress.
T. Assure gauge stations and forecast data is transmitted with a higher frequency than during normal operations
Superintending/Chief Engineer
U. Review all pertinent information in order to recommend appropriate actions to the Emergency Planning
Manager in conjunction with Dam Safety Organization‘s Staff. Provide oversight to corrective actions or work as
required. Observe conditions in site periodically and provide decision support as appropriate.
Dam Safety Organization’s Staff
V. Provide decision support and technical support to the Emergency Planning Manager as appropriate.

RE-EVALUATION / DECISION based upon ANNEX TABLE I


Evaluate conditions at least daily, or whenever conditions change significantly. Using Annex Table I, determine:
D. The event can be terminated if gate(s) back to normal operation or anomalies/damages have been repaired.
E. The event remains at the current Event Level (No change in situation).
F. The event warrants escalation if:
 Considerable leakage or uncontrolled discharge is detected.
 Forecast data indicates that‘s is impossible handle the flood without the operation of the damaged/non-
operational gates

Based on this determination, follow the appropriate actions

A) TERMINATION B) BLUE EVENT REMAINS THE SAME C) EVENT LEVEL ESCALATION

Continue recommended actions on this


Go to Termination and Follow- up Go to SHEET H2 (RED Alert)
sheet

ODISHA WATER RESOURCES DEPARTMENT


CENTRAL PROJECT MANAGEMENT UNIT
Emergency Action Plan
HIRAKUD DAM [OR10HH0003]

Event Description:
ORANGE Malfunction of Radial/Sluice Gate(s). Structural member of a gate, gate
operator broken or severely damage, which prevents operation or malfunction SHEET H2
ALERT
of the gate(s). Considerable leakage or uncontrolled discharge is detected.
Flood cannot be routed without damaged/non-operational gate(s)
RECOMMENDED ACTIONS
Emergency Planning Manager
A. Implement the ―Failure Condition Notification Flowchart‖, using pre-scripted message.
B. Identify the areas that would be potentially impacted by the emergency events
C. Make careful observation and inspection of every part of spillway mechanisms.
D. Monitor water levels and flood forecasting reports continuously. Verify the rest of spillway‘s gates are operative
E. Record all information, observations, and actions on an Event Log Form (FORM 1).
F. Contact the Superintending/Chief engineer hourly to report the latest observations and conditions. If conditions
change significantly, go to re-evaluation/decision section and follow relevant steps immediately
Site’s Engineers
G. Observe conditions in site periodically and provide decision support as appropriate.
H. Provide oversight to corrective actions or work as required.
Superintending/Chief Engineer
I. Study an emergency lowering of the reservoir.
Dam Safety Organization’s Staff
J. Provide decision support and technical support to the Emergency Planning Manager as appropriate.

RE-EVALUATION / DECISION based upon ANNEX TABLE I


Evaluate conditions at least twice daily, or whenever conditions change significantly. Using Annex Table I,
determine whether:
G. The event warrants downgrade to BLUE alert if leakage was stopped but still repair actions should be done.
Event may not be terminated until repairs are made
H. The event remains at the current Event Level (No change in situation).
I. The event warrants escalation to RED alert if the leakage is rapidly increasing through the gate(s) or the failure
of the gate(s) is imminent. Unexpected discharges during non-flood season should be considered as high risk
events where an escalation in the level of alert is necessary.

Based on this determination, follow the appropriate actions

A) EVENT LEVEL DOWNGRADE B) ORANGE ALERT (NO CHANGE) C) EVENT LEVEL ESCALATION

Continue recommended actions on this


Go to SHEET G1(Blue Alert) Go to SHEET E3 (RED Alert)
sheet

ODISHA WATER RESOURCES DEPARTMENT


CENTRAL PROJECT MANAGEMENT UNIT
Emergency Action Plan
HIRAKUD DAM [OR10HH0003]

Event Description:
RED Failure of Radial/Sluice Gate(s). Structural member of a gate, gate operator
broken or severely damage, which prevents operation or malfunction of the SHEET H3
ALERT
gate(s). Unexpected high discharge is occurring. Flood cannot be routed without
damaged/non-operational gate(s)
RECOMMENDED ACTIONS
Emergency Planning Manager (May be split responsibilities, i.e. One person at the dam handling on site actions and a different
person who can make notifications. APPLICABLE TO ALL ACTION DATA SHEETS)
A. Implement the ―Failure Condition Notification Flowchart‖, using pre-scripted message.
B. Identify the areas that would be potentially impacted by the emergency events. During non-flood season special
attention should be done for those areas where the river stream has been encroached.
C. Recommend to the Districts Collectors and Disaster Management Authorities IMMEDIATE EVACUATION
downstream of the dam and affected areas as per Local Evacuation Plan.
D. Stay a safe distance away from the dam. The immediate concern is the safety of the downstream public
E. Record all information, observations, and actions on an Event Log Form (FORM 1).
Site’s Engineers
F. Observe conditions from a safe place at dam site periodically and provide decision support as appropriate.
Superintending/Chief Engineer
G. Provide decision support and technical support to the Emergency Planning Manager as appropriate.
Dam Safety Organization’s Staff
H. Provide decision support and technical support to the Emergency Planning Manager as appropriate.

RE-EVALUATION / DECISION based upon ANNEX TABLE I


Evaluate the situation as events progress, or whenever conditions change. Determine whether:
A. The event warrants downgrade if there is no longer an immediate impending threat of dam failure and water
level in lake is lowered below the crest level of spillway.
B. The event remains at the current Event Level (No change in situation).
C. Event may be Terminated only when :
 The gate(s) have failed AND there is no longer a threat to the downstream public. (Confirmed by Disaster
Management Authorities)
All contacts on Notification Flow Chart shall be updated of changes

Based on this determination, follow the appropriate actions


B) EVENT/LEVEL REMAINS THE
A) EVENT LEVEL DOWNGRADE C) TERMINATION
SAME

Monitor conditions until damage is Continue recommended actions on this


Go to Termination and Follow- up
repaired sheet

ODISHA WATER RESOURCES DEPARTMENT


CENTRAL PROJECT MANAGEMENT UNIT
Emergency Action Plan
HIRAKUD DAM [OR10HH0003]

BLUE Event Description:


Earthquake. Measurable earthquake felt or reported and dam appears to be SHEET I1
ALERT
stable
RECOMMENDED ACTIONS
Emergency Planning Manager
A. Implement the ―Watch Condition Notification Flowchart‖, using pre-scripted message.
B. Make careful observation and inspection of every part of the dam. This should be done without compromising
the safety of anyone performing these tasks.
C. Be prepared for additional aftershocks.
D. Record all information, observations, and actions on an Event Log Form (FORM 1).
E. Contact the Superintending/Chief engineer at least daily to report the latest observations and conditions.
F. If inspection has determined a potentially dangerous situation (See Annex Table I), go to the re-
evaluation/decision section below and follow relevant steps immediately.
Site’s Engineers
G. Conduct a comprehensive site inspection of the dam and appurtenant elements and prepare a report with the
most important findings
H. Monitor and supervise any remedial action and inform the Emergency Planning Manager about the progress.
I. Observe conditions in site periodically and provide decision support as appropriate.
Superintending/Chief Engineer
J. Review all pertinent information in order to recommend appropriate actions to the Emergency Planning
Manager in conjunction with Dam Safety Organization‘s Staff. Provide oversight to corrective actions or work as
required. Observe conditions in site periodically and provide decision support as appropriate.
Dam Safety Organization’s Staff
K. Provide decision support and technical support to the Emergency Planning Manager as appropriate.

RE-EVALUATION / DECISION based upon ANNEX TABLE I


Evaluate conditions at least daily, or whenever conditions change significantly. Using Annex Table I, determine
whether:
A. The event can be terminated if the dam is determined to be stable and a sufficient amount of time has passed.
Additional aftershocks are not expected..
B. The event remains at the current Event Level (No change in situation).
C. The event warrants escalation if inspection has determined a potentially dangerous situation
All contacts on Notification Flow Chart shall be updated of changes

Based on this determination, follow the appropriate actions

A) TERMINATION B) BLUE EVENT REMAINS THE SAME C) EVENT LEVEL ESCALATION

Continue recommended actions on this


Go to Termination and Follow- up Go to SHEET I2 (ORANGE Alert)
sheet

ODISHA WATER RESOURCES DEPARTMENT


CENTRAL PROJECT MANAGEMENT UNIT
Emergency Action Plan
HIRAKUD DAM [OR10HH0003]

ORANGE Event Description:


Earthquake. Earthquake resulting in visible damage to the dam or SHEET I2
ALERT
appurtenances which can cause a potential dangerous situation
RECOMMENDED ACTIONS
Emergency Planning Manager
A. Implement the ―Failure Condition Notification Flowchart‖, using pre-scripted message.
B. Identify the areas that would be potentially impacted by the potential failure of the damaged areas.
C. Be prepared for additional aftershocks.
D. Make careful observation and inspection of every part of the dam; this should be done without compromising
the safety of anyone performing these tasks.
E. Monitor water levels and development of new damages or movements hourly.
F. Record all information, observations, and actions on an Event Log Form (FORM 1).
G. Contact the Superintending/Chief engineer hourly to report the latest observations and conditions.
H. If visible damages aggravate rapidly go to re-evaluation/decision section and follow relevant steps
immediately.
Site’s Engineers
I. Observe conditions in site periodically and provide decision support as appropriate.
J. If conditions permit: conduct a comprehensive site inspection of the dam and appurtenant elements and prepare
a report with the most important findings.
K. Provide oversight to corrective actions or work as required.
Superintending/Chief Engineer
L. Analyze and decide if an emergency lowering of the reservoir is required.
Dam Safety Organization’s Staff
M. Provide decision support and technical support to the Emergency Planning Manager as appropriate.

RE-EVALUATION / DECISION based upon ANNEX TABLE I


Evaluate conditions at least twice daily, or whenever conditions change significantly. Using Annex Table I,
determine whether:
A. The event warrants downgrade to BLUE alert if water level in reservoir is lowered below bottom level of
embankment/dam damaged section. Event may not be terminated until repairs are made
B. The event remains at the current Event Level (No change in situation).
C. The event warrants escalation to RED alert if one or multiple of the following conditions have been observed:
uncontrolled release of water over dam or rapidly developing flow through cracks or rapidly developing
erosion through increased seepage are oserved
All contacts on Notification Flow Chart shall be updated of changes

Based on this determination, follow the appropriate actions

A) EVENT LEVEL DOWNGRADE B) ORANGE ALERT (NO CHANGE) C) EVENT LEVEL ESCALATION

Continue recommended actions on this


Go to (Blue Alert) Go to SHEET I3 (RED Alert)
sheet

ODISHA WATER RESOURCES DEPARTMENT


CENTRAL PROJECT MANAGEMENT UNIT
Emergency Action Plan
HIRAKUD DAM [OR10HH0003]

Event Description:
RED
Earthquake resulting in uncontrolled release of water over dam or rapidly SHEET I3
ALERT developing flow through cracks or rapidly developing erosion through
increased seepage
RECOMMENDED ACTIONS
Emergency Planning Manager (May be split responsibilities, i.e. One person at the dam handling on site actions and a different
person who can make notifications. APPLICABLE TO ALL ACTION DATA SHEETS)
A. Implement the ―Failure Condition Notification Flowchart‖, using pre-scripted message.
B. Identify the areas that would be potentially impacted by the emergency events.
C. Recommend to the Districts Collectors and Disaster Management Authorities IMMEDIATE EVACUATION
downstream of the dam and affected areas as per Local Evacuation Plan.
D. Stay a safe distance away from the dam. The immediate concern is the safety of the downstream public
E. Record all information, observations, and actions on an Event Log Form (FORM 1).
Site’s Engineers
F. Observe conditions from a safe place at dam site periodically and provide decision support as appropriate.
Superintending/Chief Engineer
G. Provide decision and technical support to the Emergency Planning Manager as appropriate.
Dam Safety Organization’s Staff
H. Provide decision and technical support to the Emergency Planning Manager as appropriate.

RE-EVALUATION / DECISION based upon ANNEX TABLE I


Evaluate the situation CONTINUOUSLY. Determine if:
A. The event warrants downgrade if there is no longer an immediate impending threat of dam failure and water
level in lake is lowered below the seepage/leakage zone level in the dam. This action shall be confirmed by the
Dam Safety Organization‘s staff
B. The event remains at the current Event Level (No change in situation).
C. Event may be Terminated only when :
 The dam has failed AND there is no longer a threat to the downstream public. (Confirmed by Disaster
Management Authorities)
All contacts on Notification Flow Chart shall be updated of changes

Based on this determination, follow the appropriate actions


B) EVENT/LEVEL REMAINS THE
A) EVENT LEVEL DOWNGRADE C) TERMINATION
SAME

Monitor conditions until damage is Continue recommended actions on this


Go to Termination and Follow- up
repaired sheet

ODISHA WATER RESOURCES DEPARTMENT


CENTRAL PROJECT MANAGEMENT UNIT
Emergency Action Plan
HIRAKUD DAM [OR10HH0003]

Event Description:
BLUE
Security Threat/Sabotage/Vandalism. Unverified bomb threat or verified SHEET J1
ALERT damage to the dam/appurtenances with no impacts in the functioning of the
dam.
RECOMMENDED ACTIONS
Emergency Planning Manager
L. Implement the ―Watch Condition Notification Flowchart‖, using pre-scripted message.
M. Notify Local Law enforcement authorities to help evaluate the situation.
N. Make careful observation and inspection of every part of the dam. This should be done without compromising
the safety of anyone performing these tasks.
O. Record all information, observations, and actions on an Event Log Form (FORM 1).
P. Contact the Superintending/Chief engineer at least daily to report the latest observations and conditions.
Q. If inspection has determined a potentially dangerous situation (See Annex Table I), go to the re-
evaluation/decision section below and follow relevant steps immediately.
Site’s Engineers
R. Access the dam only if area has been cleared by Law Enforcement (in case of bomb threat)
S. Observe conditions in site periodically and provide decision support as appropriate.
Superintending/Chief Engineer
T. Review all pertinent information in order to recommend appropriate actions to the Emergency Planning
Manager in conjunction with Dam Safety Organization‘s Staff. Provide oversight to corrective actions or work as
required. Observe conditions in site periodically and provide decision support as appropriate.
Dam Safety Organization’s Staff
U. Provide decision support and technical support to the Emergency Planning Manager as appropriate.

RE-EVALUATION / DECISION based upon ANNEX TABLE I


Evaluate conditions at least daily, or whenever conditions change significantly. Using Annex Table I, determine
whether:
D. The event can be terminated if the dam is determined to be stable and damages have been repaired. Local
law enforcement authority has confirmed there is no threat in the dam structure and surroundings.
E. The event remains at the current Event Level (No change in situation).
F. The event warrants escalation if inspection has determined a potentially dangerous situation (bomb threat is
confirmed)
All contacts on Notification Flow Chart shall be updated of changes

Based on this determination, follow the appropriate actions

A) TERMINATION B) BLUE EVENT REMAINS THE SAME C) EVENT LEVEL ESCALATION

Continue recommended actions on this


Go to Termination and Follow- up Go to SHEET J2 (ORANGE Alert)
sheet

ODISHA WATER RESOURCES DEPARTMENT


CENTRAL PROJECT MANAGEMENT UNIT
Emergency Action Plan
HIRAKUD DAM [OR10HH0003]

Event Description:
ORANGE Security Threat/Sabotage/Vandalism. Verified bomb threat that if carried out,
could result in damage the dam/appurtenances that impacts the functioning of SHEET J2
ALERT
the dam. Verified damages due to vandalism that impacts the normal
operation of the dam.
RECOMMENDED ACTIONS
Emergency Planning Manager
A. Implement the ―Failure Condition Notification Flowchart‖, using pre-scripted message.
B. Notify Local Law Enforcement authorities to help evaluate the situation.
C. Identify the areas that would be potentially impacted by the potential failure of the damaged areas.
D. Make careful observation and inspection of every part of the dam; this should be done without compromising
the safety of anyone performing these tasks.
E. Record all information, observations, and actions on an Event Log Form (FORM 1).
F. Contact the Superintending/Chief engineer hourly to report the latest observations and conditions.
G. If inspection has determined a potentially dangerous situation, go to the re-evaluation/decision section and
follow relevant steps immediately.
Site’s Engineers
H. Access the dam only if area has been cleared by Law Enforcement (in case of bomb threat)
I. If conditions permit: conduct a comprehensive site inspection of the dam and appurtenant elements and
prepare a report with the most important findings.
J. Provide oversight to corrective actions or work as required.
Superintending/Chief Engineer
K. Analyze and decide if an emergency lowering of the reservoir is required.
Dam Safety Organization’s Staff
L. Provide decision support and technical support to the Emergency Planning Manager as appropriate.

RE-EVALUATION / DECISION based upon ANNEX TABLE I


Evaluate conditions at least twice daily, or whenever conditions change significantly. Using Annex Table I,
determine whether:
D. The event warrants downgrade to BLUE alert if water level in reservoir is lowered below bottom level of
embankment/dam damaged section. Event may not be terminated until repairs are made
E. The event remains at the current Event Level (No change in situation).
F. The event warrants escalation to RED alert if one or multiple of the following conditions have been observed:
uncontrolled release of water over dam or rapidly developing flow through cracks or rapidly developing
erosion through increased seepage are observed
All contacts on Notification Flow Chart shall be updated of changes

Based on this determination, follow the appropriate actions

A) EVENT LEVEL DOWNGRADE B) ORANGE ALERT (NO CHANGE) C) EVENT LEVEL ESCALATION

Continue recommended actions on this


Go to (Blue Alert) Go to SHEET J3 (RED Alert)
sheet

ODISHA WATER RESOURCES DEPARTMENT


CENTRAL PROJECT MANAGEMENT UNIT
Emergency Action Plan
HIRAKUD DAM [OR10HH0003]

Event Description:
RED
Security Threat/Sabotage/Vandalism. Detonated bomb resulting in visible SHEET J3
ALERT damage to the dam and appurtenances OR uncontrolled water release due to
sabotage/vandalism damages.
RECOMMENDED ACTIONS
Emergency Planning Manager (May be split responsibilities, i.e. One person at the dam handling on site actions and a different
person who can make notifications. APPLICABLE TO ALL ACTION DATA SHEETS)
A. Implement the ―Failure Condition Notification Flowchart‖, using pre-scripted message.
B. Identify the areas that would be potentially impacted by the emergency events.
C. Recommend to the Districts Collectors and Disaster Management Authorities IMMEDIATE EVACUATION
downstream of the dam and affected areas as per Local Evacuation Plan.
D. Stay a safe distance away from the dam. The immediate concern is the safety of the downstream public
E. Record all information, observations, and actions on an Event Log Form (FORM 1).
Site’s Engineers
F. Advise Emergency planning Manager of dangerous conditions at the dam.
Superintending/Chief Engineer
G. Provide decision and technical support to the Emergency Planning Manager as appropriate.
Dam Safety Organization’s Staff
H. Provide decision and technical support to the Emergency Planning Manager as appropriate.

RE-EVALUATION / DECISION based upon ANNEX TABLE I


Evaluate the situation CONTINUOUSLY. Determine if:
A. The event warrants downgrade if there is no longer an immediate impending threat of dam failure and water
level in lake is lowered to safe level. This action shall be confirmed by the Dam Safety Organization‘s staff and
Local Law Enforcement Authority.
B. The event remains at the current Event Level (No change in situation).
C. Event may be Terminated only when :
 The dam has failed AND there is no longer a threat to the downstream public. (Confirmed by Disaster
Management Authorities)
All contacts on Notification Flow Chart shall be updated of changes

Based on this determination, follow the appropriate actions


B) EVENT/LEVEL REMAINS THE
A) EVENT LEVEL DOWNGRADE C) TERMINATION
SAME

Monitor conditions until damage is Continue recommended actions on this


Go to Termination and Follow- up
repaired sheet

ODISHA WATER RESOURCES DEPARTMENT


CENTRAL PROJECT MANAGEMENT UNIT
Emergency Action Plan
HIRAKUD DAM [OR10HH0003]
FORM 1
UNUSUAL OR EMERGENCY EVENT LOG
(To be completed during the emergency)

Dam name: __HIRAKUD____________ District: ___SAMBALPUR_______________

When and how was the event detected? : _____________________________________________________

_______________________________________________________________________________________

Weather conditions: ______________________________________________________________________

General description of the emergency situation: ________________________________________________

_______________________________________________________________________________________

Emergency level determination:_________________ Made by: ___________________________________

Actions and Event Progression

Date Time Action/event progression Recorded by

ODISHA WATER RESOURCES DEPARTMENT


Date Time Action/event progression Recorded by

CENTRAL PROJECT MANAGEMENT UNIT


Emergency Action Plan
HIRAKUD DAM [OR10HH0003]
ANNEXURE 5
Supplies and Resources

The following equipment and supplies may be necessary for use during a dam emergency. Contact
information for local/national contractors who can provide the following items during an emergency is listed
below. For supplies owned by the dam owner, the dam owner‘s name and the specific location of the supplies
have been denoted

Contractor Type Name, Title, Phone Remarks


Contact Name: Surjeet Singh Vedi Services: Ready Mix Concrete, Sand bags, sand
Company Name: and gravel, pumps, geomenbranes, bentonite,
Mobile Ph.1: 9437062416 earth works
Office Ph.1: Mobilization / Response Time: Immediate
Email: Pre-Agreement: YES
Contact Name: Suryamani Gochhayat Services: Ready Mix Concrete, Sand bags, sand
Company Name: and gravel, pumps, earth works
Civil Works Mobile Ph: 7008391914 Mobilization / Response Time: Immediate
Office Ph: Pre-Agreement: NO
Email:
Contact Name: Nabin Kumar Mishra Services: Ready Mix Concrete, Sand bags,
Company Name: pumps, geomenbranes, bentonite
Mobile Ph: 9861167547 Mobilization / Response Time: Moderate
Office Ph: Pre-Agreement: NO
Email:
Contact Name: Satwik Swain Services: Electro/Mechanical works and repairs
Company Name: Eastern Engineering (supplier and service). Supply, Installation and
Pvt. Ltd. Maintenance of lighting.
Mobile Ph: +91 94 37 167981 Mobilization / Response Time: High (Cuttack)
Office Ph: +91 671 2342113 Pre-Agreement: NO
Email: engineering.eastern@yahoo.in Web-Site: http://www.easternengineering.in
Contact Name: Nabin Kumar Mishra Services: Mechanical works
Electro/Mechanical Company Name: Mobilization / Response Time: Immediate
Works Mobile Ph: +91-9861167547 Pre-Agreement: NO
Office Ph: Web-Site: not available
Email: nabin.mishra1967@gmail.com
Contact Name: Dhiren Behera Services: Mechanical Supplier
Company Name: Mobilization / Response Time: Immediate
Mobile Ph: +91-9437402413 Pre-Agreement: NO
Office Ph: Web-Site: not available
Email:
Contact Name: Rajesh Swain Services: Electrical Contractor
Company Name: Mobilization / Response Time: Immediate
Mobile Ph. 1: +91-9438677889 Pre-Agreement: NO
Office Ph. 1: Web-Site:
Email:
Electrical Works Contact Name: Kishor Majhi Services: Electrical Contractor
Company Name: Mobilization / Response Time: Immediate
Mobile Ph: 9937103803 Pre-Agreement: NO
Office Ph: Web-Site: not available
Email:
Contact Name: Jayanarayan Services: Electrical Contractor
Mohapatra Mobilization / Response Time:

ODISHA WATER RESOURCES DEPARTMENT


Contractor Type Name, Title, Phone Remarks
Company Name: Pre-Agreement: NO
Mobile Ph: +91-9861242178 Web-Site: not available
Office Ph:
Email:
Contact Name: Services: Geothechnical Instrumentation
Company Name: SysTel (supplier and service)
Instrumentation Services Pvt. Ltd. Mobilization / Response Time: Low (Uttar
Mobile Ph: +91 8127369742 Pradesh)
Office ph.:+91 0522 495 3344 Pre-Agreement: NO
Web-Site: www.sisplgroup.com
Contact Name: Services: Geothechnical/Structural
Company Name: Slope Indicator Co. Instrumentation (supplier and service)
Instrumentation Rep. Mobilization / Response Time: Low (Uttar
Office Ph. 1: +91-11-2643 5279 Pradesh)
Office Ph. 2: +91-11-2643 5280 Pre-Agreement: NO
Web-Site: www.slopeindicator.com
Contact Name: Services: Meteorological Instrumentation
Company Name: SGS Weather and (supplier and service)
Environmental Systems Mobilization / Response Time: Low (Delhi)
Office Ph. 1: +91-124-4810917 Pre-Agreement: NO
Office Ph. 2: +91-124- 4810918 Web-Site: http://www.sgsweather.com
Fax: +91-124-4000184
Contact Name: Mohammed Sadiq Services: Pumps, Underwater Inspections,
Company Name: Dolphin Diving welding, Hydro jetting
Services Pvt. Ltd. Mobilization / Response Time: Moderate
Mobile Ph.: +91-9885786765 (Andhra Pradesh)
Office Ph. : +91-891-2712572 Pre-Agreement: NO
Fax:+91-891-2712572 Web-Site:
http://www.dolphindivingservices.com/
Contact Name: Services: Diving & ROV Services, underwater
Company Name: SEAFOLK inspections
Diving Contractors & Engineering Mobilization / Response Time: Low (Gujarat)
Special Services Pvt. Ltd. Pre-Agreement: NO
Works/Equipment Mobile Ph. 1: +91-9509797622 Website: http://www.seafolkdive.com
Mobile Ph. 2: +91-09784122118
Office Ph.1:+91-2882661700
Contact Name: Dinesh K. Yadav Services: Prevention, Detection and
Company Name: Asha underwater Repair/arrest of leakage in sluice, service gate.
Services Pvt. Ltd. Spot Dreding and Trash removal from fore
Mobile Ph. 1: +91-9820554228 bays, intakes. Underwater inspections
Office Ph. 1: +91-251-2232598 Mobilization / Response Time: Moderate
Office Ph. 2: +91-251-2231712 (Andhra Pradesh)
Pre-Agreement: NO
Web-Site: http://ashaunderwater.com/
ISO 9001 : 2008 CERTIFICATION
Contact Name: Services: Hydraulic/Hydrology consultancy.
Consultants Company Name: National Institute of Academic Institution
(Hydraulic, Hydrology, Roorkee-247667, Mobilization/Response Time: Low
Geotechnical, Mobile Ph. 1: +91- 1332-272106 (Uttarakhand)
Mechanical, Mobile Ph. 2: +91-1332-272108 Pre-Agreement: NO
Structural) Office Ph. 1: +91-1332- 249218
Contact Name: Services: Geotechnical/Structural Consultancy

CENTRAL PROJECT MANAGEMENT UNIT


Emergency Action Plan
HIRAKUD DAM [OR10HH0003]
Contractor Type Name, Title, Phone Remarks
Company Name: Central Water & Mobilization / Response Time: Low (Pune)
Power Research Station (CWPRS), Pre-Agreement: NO
Pune
Mobile Ph. 1:+91(20)24103200
Mobile Ph. 2:+91(20) 24380511
Office Ph.1: +91(20) 24380825
Contact Name: Services: Geothechnical/Structural Consultancy
Company Name: Central Soil And Mobilization / Response Time: Low (Delhi)
Materials Research Station (CSMRS) Pre-Agreement: NO
Office Ph. 1:+91-11-26967985
Office Ph. 2: :+91-11- 26961894
Contact Name: Simanchal Padhi Services: Rent Bulldozers, Backhoe Loaders,
Title: Civil Contractor Motor Graders, Trenchers, Dump Trucks, crawler
Mobile Ph.1: +91-9438677889 loaders
Mobilization / Response Time: Immediate
Pre-Agreement: NO
Contact Name: Sanat Kumar Mohanty Services: Rent Bulldozers, Backhoe Loaders,
Heavy Equipment Company Name: Motor Graders, Trenchers, Dump Trucks, crawler
(Cranes, Mobile Ph.1: +91-8895450339 loaders
Bulldozers,etc) Mobilization / Response Time: Immediate
Pre-Agreement: NO
Contact Name: Surendra Kumar Dutta Services: Rent Bulldozers, Backhoe Loaders,
Company Name: Motor Graders, Trenchers, Dump Trucks, crawler
Mobile Ph: +91-9438002011 loaders
Mobilization / Response Time: Immediate
Pre-Agreement: NO
Contact Name: Sarojdhoj Josh Services: Data Acquisition and Monitoring. Early
Company Name: R T Solutions Pvt. Warning Systems. IT services (Web/Application
Ltd. Development). Wireless and Radio
Office Ph. 1:+91-8046052346 Communication Equipment
Office Ph. 2: +977-1-5538687 Mobilization / Response Time: Low (Delhi &
Nepal)
Pre-Agreement: NO
Website: https://www.rts.com.np/
Contact Name: Vinneet Sheth Services: Wireless and Radio Communication
Communications Company Name: Space Equipment. Voice and Data Communication.
(Warning Systems, Communications and Electronics Early Warning Systems (Supplier)
CCTV, IT, Wireless Mobile Ph. 1:+91-8048763358 Response Time / Mobilization: Low (Gujarat)
Communications) Pre-Agreement: NO
Website: http://www.space-comm.co.in
Contact Name: Ranvir Soni Services: Wireless and Radio Communication
Company Name: Meatech Solutions Equipment. Automatic Weather Stations.
Pvt. Ltd. Disaster Warning Systems. Topographical
Mobile Ph. 1:+91- 9810955787 Survey
Mobile Ph. 2: +91 9831073081 Mobilization / Response Time: Moderate
(Kolkata and Delhi)
Pre-Agreement: NO
Web-Site: http://www.meatechsolutions.com
.

ODISHA WATER RESOURCES DEPARTMENT


CENTRAL PROJECT MANAGEMENT UNIT
Emergency Action Plan
HIRAKUD DAM [OR10HH0003]
ANNEXURE 6
Sample Public Announcements

Note: These messages are communicated to downstream residents to alert the public of impending danger.
The Emergency Planning Manager should coordinate with the India Meteorological Department, the District
Disaster Management Authority, and the District Collectors (Table 5, page 3) prior to release. Messages can
be communicated via radio, television, bulk SMSs of local mobile networks, and other media outlets.

Announcement for a Slowly Developing “Watch” Condition (BLUE Emergency Level)

Odisha Water Resources Department has declared a BLUE Level ―Watch‖ condition for Hirakud Dam, Project
Identification Code OR10HH0003 as of [time and date]. [Briefly describe the problem or condition.] Although
there is no immediate danger of the dam failing, [Describe what actions are being taken to monitor and control
the situation.] [State the quantity of any releases from the reservoir.]

Announcement for a Worsening “Watch” Condition (BLUE Emergency Level)

Odisha Water Resources Department has declared a BLUE Level ―Watch‖ condition for Hirakud Dam, Project
Identification Code OR10HH0003 as of [time and date]. [Briefly describe the problem or condition.] Although
there is no immediate danger of the dam failing a possibility now exists that the dam will fail [or describe any
other consequence] if correction efforts are unsuccessful. [Describe what actions are being taken to monitor and
correct the situation.] [State the quantity of any releases from the reservoir]. Additional news will be made
available as soon as it is received.

Announcement for a Probable “Failure” Condition (ORANGE Emergency Level)

Urgent! This is an emergency message. Odisha Water Resources Department has announced that Hirakud
Dam, Project Identification Code OR10HH0003 is probably going to fail [or describe any other consequence]
[Describe what actions are being taken to monitor and control the situation.] It is possible that the dam will fail
in [##] hours. Residents in low lying areas along the Mahanadi Lower Basin, as well as the town of
Sambalpur [Or Indicate the specific towns/villages to be evacuated according to the expected scenario], should
prepare for immediate evacuation. Additional news will be made available as soon as it is received.

Announcement of an Impending “Failure” Condition (RED Emergency Level)

Emergency! This is an emergency message. Hirakud Dam, Project Identification Code OR10HH0003 is going
to fail at any moment [or describe any other consequence]. Residents who have not yet done so should
immediately evacuate the city of Sambalpur and low-lying areas along the Lower Mahanadi Basin [Or
Indicate the specific towns/villages to be evacuated according to the expected scenario]. The flood waters have
already reached [Highway] and [Road]. Additional news will be made available as soon as it is received.

Announcement of an Ongoing “Failure” Condition (RED Emergency Level)

Emergency! This is an emergency message. Hirakud Dam, Project Identification Code OR10HH0003 failed [or
describe any other consequence] at [time and date]. Residents who have not yet done so should immediately
evacuate the city of Sambalpur and low-lying areas along the Lower Mahanadi Basin [Or Indicate the
specific towns/villages to be evacuated according to the expected scenario]. The flood waters have already
reached [Highway] and [Road]. Additional news will be made available as soon as it is received.

ODISHA WATER RESOURCES DEPARTMENT


CENTRAL PROJECT MANAGEMENT UNIT
Emergency Action Plan
HIRAKUD DAM [OR10HH0003]
ANNEXURE 7
Dam Description

Official Dam Name: Hirakud Dam Project


Name of Stream: Mahanadi_______________________________________________________________________
Dam Location: Sambalpur District, Odisha _____
Latitude/Longitude: 21° 32‘ 0‖ / 83° 52‘ 0‖
Seismic Zone: Zone III Year of Starting of Dam Construction: 1948
Year of First Impoundment: 1957 Year of Commissioning of Dam Project: 1957
Name of Immediate Upstream Dam: Bango Dam Name of Immediate Downstream Dam: Mundali Barrage
Emergency Planning Manager: Er. Chinmoy Ranjan Rout, Main Dam Division Phone Number: +91-8895483648

Main Dam
Type Combination of concrete gravity, masonry and zoned earth fill
section
Length 4,800 meters
Maximum Height 60.96 meters
Top Width 9.14 meters
Top of Embankment Elevation 195.68 meters-msl
Drainage Area 83,400 square kilometers

Main Spillway (Left and Right Crest Gate Spillway)


Type Gated Spillway with Ogee Weir
Dissipation Mechanism Sky Jump bucket
Size of Crest Gates Width: 15.54 m. , Height: 6.20 m.
No. Crest Gates 34 (21 on left and 13 on right)
Crest Elevation 185.298 meters
Capacity 15,632 cumecs

Main Spillway (Under Sluices)


Type Vertical Lift Gates
Size of Under Sluices Width: 3.658 m. , Height: 6.20 m.
No. Under Sluices 64 (40 on left and 24 on right)
Sill Elevation 185.298 meters
Capacity 26,818 cumecs

Reservoir
Full Reservoir Level 192.024 meters-msl
Live Storage Capacity 4,823 millions of cubic meters
Gross Storage Capacity 5,896 millions of cubic meters
Reservoir Spread Area at FRL 743 square kilometers

ODISHA WATER RESOURCES DEPARTMENT


CENTRAL PROJECT MANAGEMENT UNIT
Emergency Action Plan
HIRAKUD DAM [OR10HH0003]
ANNEXURE 8
Annual EAP Evaluation Checklist

Evaluation Year: Evaluation done by:

Was the annual dam inspection □ Yes If yes, has the EAP been □ Yes
conducted? □ No revised to include any signs □ No
of failures observed during
the inspection?

Was weed clearing, animal burrow □ Yes If yes, describe actions taken and date:
removal, or other maintenance required? □ No

Was the outlet gate operable? □ Yes If no, describe actions taken and date:
□ No

Does the Notification Flowcharts require □ Yes If yes, list the dates of the contact information
revision? □ No revision and redistribution:

(Note that revision of the contact


information will not require EAP approval;
however, the revised contact information
pages will need to be redistributed as
replacement pages.)

Was annual training or a tabletop drill □ Yes If yes, specify: □ Training □ Drill
conducted? □ No
Date conducted:

Are inspection and training records □ Yes


included in the EAP? □ No

Was the EAP reviewed? □ Yes If yes, review date:


□ No

Were changes required to the EAP? □ Yes If yes, date of revised EAP approval:
□ No

ODISHA WATER RESOURCES DEPARTMENT


CENTRAL PROJECT MANAGEMENT UNIT
Emergency Action Plan
HIRAKUD DAM [OR10HH0003]
ANNEXURE 9
Plan Review and Update

This plan will be reviewed and updated annually and tabletop drills will be carried out at least once every
five years. Document these reviews below.

Date of review: Participants:

Date of review: Participants:

Date of review: Participants:

Date of review: Participants:

Date of tabletop drill: Participants:

ODISHA WATER RESOURCES DEPARTMENT


CENTRAL PROJECT MANAGEMENT UNIT
Emergency Action Plan
HIRAKUD DAM [OR10HH0003]
ANNEXURE 10
Training Record

Use this form to record training sessions. All items in the EAP should be thoroughly reviewed during training.
Appropriate Odisha WRD‘s employees and EAP responsible should attend a training session annually (or
participate in a simulated drill).

TRAINING LOCATION:

DATE: TIME: INSTRUCTOR:

CLASS SIGN-IN:

Type of Simulation Conducted: Specify Emergency Type:

□ Emergency water release

□ Watch condition

□ Possible dam failure

□ Imminent dam failure

□ Actual dam failure

Comments, Results of Drill:

Revisions Needed to EAP Based on Results of Drill?

□ Yes □ No If yes, list revisions required:

ODISHA WATER RESOURCES DEPARTMENT


ODISHA WATER RESOURCES DEPARTMENT / CENTRAL WATER COMMISSION

Vision

To remain as a premier organisation with best technical and managerial


expertise for providing advisory services on matters relating to dam safety.

Mission

To provide expert services to State Dam Safety Organisations, dam owners,


dam operating agencies and others concerned for ensuring safe functioning of
dams with a view to protect human life, property and the environment.

Values

Integrity: Act with integrity and honesty in all our actions and practices.

Commitment: Ensure good working conditions for employees and encourage


professional excellence.

Transparency: Ensure clear, accurate and complete information in


communications with stakeholders and take all decisions openly based on
reliable information.

Quality of service: Provide state-of-the-art technical and managerial services


within agreed time frame.

Quality Policy

We provide technical and managerial assistance to dam owners and State Dam
Safety Organizations for proper surveillance, inspection, operation and
maintenance of all dams and appurtenant works in India to ensure safe
functioning of dams and protecting human life, property and the environment.

We develop and nurture competent manpower and equip ourselves with state
of the art technical infrastructure to provide expert services to all