PPE Name Available

Stock
Goggles White 9
Full Cover Goggles 41
Fire Proximity Suits 2
PVC Suit 4
Gum Boots 3
Safety Shoes 33
Toe Guards 5
Yellow Helmets 8
White Helmets 2
Gray Helmets 9
Red Helmets 1
Safety Harness 6
Nitrile Gloves 24
PVC Gloves 3
Latex Gloves 2
Cotton Gloves 103
Ammonia Catridges 4
Oeganic Catridges 6
Dust Masks 64
Helmet Stoppers 2
Ear Muffs 2
Ear Plugs 43
Spark Arestors 10
SCABA 3
safety Cones 6

Power MIS July-Dec 2019


EB Units LT DG Units HT DG units Total Units Dispatches Units /
Month
consumed consumed consumed consumed (MT) MT
July'19 145200 8346 10817 164363 10677 15.4
August'19 142980 5323 0 148303 11424 13.0
September'19 159540 7965 1894 169399 12460 13.6
October'19 204684 10014 981 215679 16533 13.0
November'19 184368 17533 9537 211438 14835 14.3
December'19 186421 5628 877 192926 11439 16.9
Total 1023193 54809 24106 1102108 77368.4 14.36
Unloading Line Defects List - Inspection Dt: 24-09-2019 & 25-09-2019

CCPL Inspection was carried out and the following deviations were observed. List of CCPL locations
and respective defects are noted.

Consolidated Result

Defect Qty (Sets)


S.No Description
category
ULL PCL

Minor Repair 42 108


1 Concrete pillar
Repair 34 2

2 L-Cleat Repair 28 24

3 Full Clamp Repair 19 27

4 Top Clamp Repair 10 0

5 Fasteners Repair 35 7

6 Insulation Repair 33 20

Insulation-SS
7 Missing 28 23
Straps

Fabrication requirement:

Fabrication Quantity

Part to be Qty (Nos)


fabricated ULL PCL

L-Cleat 56 48

Bottom Clamp 19 27

Top Clamp 58 54

Fasteners 256 136

Insulation 33 20

Insulation-SS
28 23
Straps
Change Locations
Full Top Pedestal
Pedestal L-Cleats Fasteners Insulation Insulation
S.No Camps Clamps Minor
Repair Repair Repair Repair SS-Straps
Repair Repair Repair
1 677 1295 217 187 40 1355 177 467
2 1095 1305 237 357 495 1575 237 477
3 1265 1315 332 787 627 1635 277 887
4 1345 1325 336 797 653 1655 287 913
5 1355 1375 347 807 707 1665 317 919
6 1395 1395 495 817 1115 2705 336 967
7 1455 1405 627 827 1185 2725 367 1075
8 1485 1415 707 887 1205 2745 437 1085
9 1515 1425 777 907 1225 447 1095
10 1565 1535 1008 1015 1235 487 1105
11 1575 1075 1025 1245 557 1115
12 1615 1085 1035 1265 607 1125
13 1635 1115 1095 1305 632 1145
14 1735 1155 1105 1335 677 1195
15 1752 1185 1355 1425 727 1205
16 1765 1205 1405 1712 747 1275
17 1795 1215 1455 1718 757 1525
18 1975 1225 1495 1725 797 1575
19 1985 1235 1515 2365 837 1675
20 1265 1635 2370 857 1695
21 1295 1705 2390 913 1705
22 1305 1765 2395 937 1735
23 1335 2078 2495 1015 1775
24 1415 2105 2515 1035 2078
25 1425 2215 2545 1045 2195
26 1445 2235 2555 1065 2370
27 1475 2255 2682 1370 2735
28 1485 2345 2775 1712 2745
29 1752 2435 1718
30 1825 2445 1785
31 2115 2485 1795
32 2468 2515 1845
33 2475 2555 2115
34 2635 2575
35 2592
36 2615
37 2675
38 2682
39 2695
40 2758
41 2765
42 2775
Precooling Line Defects List - Inspection Dt: 24-09-2019 & 25-09-2019
Change Locations
Pedestal Pedestal Pedestal
Full
Pedestal Minor Minor Minor L-Cleats Fasteners Insulation Insulation
S.No Camps
Repair Repair - Repair - Repair - Repair Repair Repair SS-Straps
Repair
1 2 3
1 493 647 218 1210 1821 576 442 188 338
2 496 990 242 1224 1828 675 493 330 650
3 647 262 1240 1834 685 496 488 660
4 660 268 1243 1839 715 660 492 903
5 664 278 1249 1844 724 692 544 1000
6 685 288 1254 1851 734 695 596 1195
7 692 302 1260 1856 790 1363 754 1720
8 695 352 1265 1946 827 819 1723
9 724 488 1280 1962 886 1199 1758
10 819 492 1290 2071 930 1513 1762
11 827 506 1298 2082 1015 1734 1766
12 1037 572 1304 2178 1027 1738 1784
13 832 586 1328 2201 1086 1742 1876
14 1140 619 1373 2313 1124 1752 1881
15 1144 629 1405 2333 1144 1766 1891
16 1147 639 1463 2427 1542 1891 2054
17 1154 642 1483 2663 1653 2077 2197
18 1188 660 1487 2678 1710 2107 2361
19 1205 669 1493 2685 1771 2739 2363
20 1363 700 1513 2713 2359 2828 2693
21 1370 705 1555 2733 2395 2722
22 1438 739 1559 2828 2412 2739
23 2060 760 1564 2832 2493 2777
24 2071 766 1574 PCL I/V 2733
25 2632 837 1604
26 2754 856 1607
27 2763 871 1613
28 903 1638
29 914 1669
30 924 1684
31 930 1694
32 937 1698
33 961 1710
34 970 1720
35 1080 1758
36 1114 1762
37 1130 1776
38 1134 1784
39 1144 1790
40 1154 1794
41 1159 1800
42 1180 1813
Thermographic inspection of LPG storage tank insulation, LPG pumps and Transformers has been
carried out on 30th September 2019 by SOUTHERN INSPECTION SERVICES. The inspection was
carried out in two phases morning and evening.

Camera Serial Number Ti32 – 10060564

Model Ti – 32 Thermal Imager

Camera Manufacturer FLUKE


Settlement Monitoring

Tank settlement:
Settlement Monitoring of T101B has been carried out at the terminal by Hamilton
Material Testings Private Limited from 03.11.2019 to 05.11.2019.
It is seen that the maximum settlement of the piles at storage level of 6800 tons is
3mm, with reference to the initial storage level of 1230 tons. If extrapolated for Zero
storage level to 8,500 tonnes full storage level, the maximum settlement works out
to 3mm. This is less than the order of settlement which was obtained in the
settlement monitoring of the same tank last year. This order of settlement is well
within the permissible settlement of 25mm for pile groups as per Indian Standard
IS:2911(Part-4)1985 (reaffirmed 2000, Edition 2.1(1989-05): CODE OF PRACTICE
FOR DESIGN AND CONSTRUCTION OF PILE FOUNDATIONS PART 4 LOAD TEST ON
PILES
Compressive strength of piles:
The results of compressive strength of concrete of 15 Piles tested and the minimum
compressive strength obtained is 30.06 N/mm2 (4360 psi), which correspondence
to M26 Grade concrete which is significantly more than the design Grade of M20.
Therefore, in terms of compressive strength of concrete in the pile, the piles are safe.

It is certified by the testing company that the settlement of tank is in safe limits and
the piles are of good compressive strength.
Painting Report
Paint has been procured in bulk to carry out the patch up work of corroded equipment
and structures. The terminal was inspected to find corroded equipment and structures
and the same have been noted. The painting work of the noted has been carried out.
So far 1400 square meters painting has been done.
1. We have painted 1.A1 and A2 compressors.
2. T101B staircase.
3. Refurbished loading arms.
4. Cooling water pump base plates.
5. Fire water pumps base plates.
6. Corroded patches on T101B have been chirped and painted every month.
7. 6. Oil jetty platform cleaning and painting done.
8. 7. CCPL supports.
9. 8. E 401- End covers were cleaned and painted.
10. 9. T 402 platform painting done.
11. 10. Painting work done for instructions boards, name boards, walkway and
weighbridge ramp.