Leveraging Technology

for Lean Construction


Going Lean to Reduce Waste and Increase Profits
How Software Creates Greater Productivity for Industrial Contractors

What’s Inside
3 Introduction

4 What are Lean Business Principles?

5 How Does Lean Construction Work?

7 What are the Benefits of Lean Construction?

8 What Technology Works Best for Lean Construction?

10 Conclusions

2
Introduction
Lean business techniques can be applied to any industry and the construction industry
has the opportunity to reap many rewards from embracing it. Yet, the work required to
implement core lean business practices, such as the 5S system or Value Stream Mapping,
has long deterred the construction industry from jumping on the bandwagon. Only now
is lean construction starting to blossom, thanks to the work of the Lean Construction
Institute (LCI) and other industry leaders. Improvements in construction technology are
driving part of this surge in interest as new tools arrive to make it even easier to put lean
practices to work.

3
How Software Creates Greater Productivity for Industrial Contractors

What are Lean


Business Principles?
While lean business principles must be adapted for each industry, many of the concepts apply
universally. The history of lean thinking is still guiding lean construction today, so explore the
roots of the philosophy first before jumping straight into the system.

A Better Approach to Business The Needs of the Construction Industry


The origins of lean manufacturing date There’s never been a better time than
back to the 1950s and the Toyota Motor today for implementing lean principles
Corporation in Japan. After exploring the in the construction industry. With global
automation processes that revolutionized construction waste projected to nearly
Ford’s manufacturing process in the US, double by 2025, it’s clearly time for an
Eiji Toyoda created his Toyota Production intervention to reduce lost material
System, which inspired the eventual lean expenses and labor costs.2 Globally, rework
manufacturing system.1 The Just-in-Time costs average 5% of total construction
inventory management concept dates costs, which adds up to a loss of billions of
back to this original system and is still used dollars in potential profit from preventable
in lean construction today. mistakes.3 Lean construction can reduce
waste, prevent rework and eliminate losses
across the worksite.

4
How Does Lean
Construction Work?
Lean construction shares the same five guiding principles as lean manufacturing:

1. Identifying value

2. Mapping the value stream from beginning to end

3. Creating greater flow and fewer bottlenecks

4. Establishing a pull planning system to direct each step

5. Seeking perfection and constantly adjusting the previous four processes.

Applying each principle to construction’s biggest routine challenges results in happier


workers, fewer mistakes and higher total profits.

Embracing Increasing Complexity Defining the Value Stream


The rapidly increasing complexity of Many construction firms spend years or
construction processes and projects is even decades jumping from project to
making technology adoption mandatory project without taking the time to
for many firms. It’s no longer possible to consider and optimize their workflow
manage the thousands of documents methods. Value Stream Mapping is a|
and pieces of information necessary lean manufacturing concept that is
for completing even relatively basic easily applied to construction. By
residential and commercial projects. Lean approaching the project from the
construction techniques break down the customer’s point of view, the firm can
most complex bidding, change requests identify how they’re providing value and
and design processes into manageable map the optimal approach for maximizing
steps that are easily optimized. For it. Outlining the value stream simplifies
example, the 5S approach to organization planning for every stage of a construction
gives construction firms five actionable project, from initial design and engineering
steps to apply to their workflows.4 From work all the way to handover. Necessary
eliminating unnecessary information during materials, labor and other supplies are
the first stage to sustaining the practices identified before each stage of work begins
through the fifth stage, 5S philosophies rather than during the fray or only after
scale with the growing complexity of bottlenecks create delays.
modern construction.

5
How Software Creates Greater Productivity for Industrial Contractors

Targeting Waste Last Planner System


Annual production of construction waste The Last Planner System (LPS) is easily
on a global scale is expected to rise above applied to the construction workflow with
2 billion tons within the next six years.2 Not the right technology. Pull planning focuses
only will all that waste generate plenty of on starting with a coordinated plan for
landfill and recycling fees, it also represents each phase of a construction project rather
a lamentable quantity of materials that than addressing the steps of the work only
were purchased and not used. Lean after beginning a phase. Construction
construction techniques reduce multiple software helps identify which parts of
types of waste like:5 the project require the next round of
work requests to keep everything flowing
• Excessive inventory ordered “just smoothly. Construction projects that
in case,” rather than according finish on time also tend to come in under
to Just-in-Time principles.
budget, resulting in a greater profit for the
• Extra processing of materials, such company responsible for the work.
as cutting of dimensional lumber
or assembly of trusses, which
are never used in the project.

• Unnecessary transportation of
materials, workers or equipment
to a job site before the right time
or when not needed at all.

• Defects due to a lack of skilled labor,


poor training, outdated project
files and many other causes.

• Wasted motion and energy lost due


to unnecessary distances between
work site locations, poor storage
access and similar inefficiencies.

If waste can’t be prevented or reduced,


lean construction techniques will focus on
reclaiming the end products to generate a
secondary source of income. Closing the
loop on wasteful construction techniques
doesn’t just generate savings for the
construction firm, it also protects the
environment and improves the company’s
public image.

6
What are the Benefits
of Lean Construction?
In addition to offering a healthier profit margin and higher return on investment (ROI) for
the construction firm, lean construction techniques provide quite a few other benefits. These
secondary benefits may outweigh sheer profit alone as more than enough reason to embrace
lean techniques.

Higher Quality Work Improved Risk Management Processes


By identifying errors and mistakes as early Finally, advanced pull planning
as possible, lean construction techniques techniques provide plenty of
such as the LPS or A3 Problem-Solving opportunities for extra risk management.
Practices result in higher quality work. Planning out the risks and rewards of
Being able to send back designs for a construction project is essential on
revisions before materials are ordered projects financed by a construction firm,
and building systems are installed reduces but client-funded projects also deserve a
rework, increases worker job satisfaction close inspection. Getting involved with a
and improves their future work. This project that is destined to fail will waste
positive cycle reinforces itself with only the company’s time and reduce the total
minimal effort required to implement the profit, putting the firm at risk of loss even
lean construction techniques. on small projects.

Easier Time Attracting New


Generation of Workers
Since lean business principles are also
built around a strong respect for people,
construction firms embracing lean
methods find it easier to attract new
managers and skilled workers.
Well-educated workers fresh out of
university training programs for
business and construction management
are on the lookout for employers who use
cutting-edge technology and
management systems.

7
How Software Creates Greater Productivity for Industrial Contractors

What Technology
Works Best for Lean
Construction?
Practically any construction technology or tool that improves workflow efficiency and assists
in pull planning will work with lean construction philosophies. However, some tools are a better
fit than others. To assist a construction firm to adopt the lean mindset, build a collection that
includes at least one app for each of the following four categories.

Planning and Document Management Communication Apps


Document management software is the Eliminating delays in communication
fastest way to standardize workflows. between team members is easy with the
This improvement is essential for the right technology. Whether a firm prefers
construction industry since higher-level chat apps, message boards or internal
professionals report spending over a third email systems, there are plenty of tools
of their time on non-essential planning to fit every team size and budget. Some
tasks.6 PlanGrid minimizes time spent on document management tools like PlanGrid
routine updates and change requests, streamline communication-heavy process
leaving project engineers and managers like RFIs and change orders, so there’s no
free to focus on more important details. need to add a second app to the system.
Minimizing complications by reducing
the number of apps a team uses accords
perfectly with lean construction principles.

8
Just-in-Time Tools Building Information Modeling (BIM)
Construction benefits from the Just-in-Time The software and tools used for BIM are
(JIT) inventory principle just as much as some of the most advanced construction
manufacturing because wasted materials technologies available. Since lean
account for a large percentage of total philosophies focus on always improving
project costs. Ordering only exactly what’s the work cycle, embracing BIM is a must
needed for each stage of construction for staying lean. Improving a team’s
minimizes the chance of damage to clash detection, energy modeling and
building materials by poor site conditions 3-D imaging techniques can result in
like flooding or heat waves. Order measurable savings on even a single large-
overflows are also reduced, eliminating the scale project. BIM software can also use
need to write off wasted materials or hold AI and machine learning tools to compare
them over until the next project and pay dozens of sets of drawings for emissions
for secure storage. There’s no concern over and errors, reducing rework and change
an interruption in supplies slowing down request delays over the entire project.
the work either, since JIT systems automate
ordering to keep a steady, uninterrupted
flow to the worksite.

9
How Software Creates Greater Productivity for Industrial Contractors

Conclusions
Lean construction may have been around for a decade or more, but now is the perfect
time for considering a trial project. Construction technology has finally caught up with
the philosophy of lean management, making it easier than ever to put these good ideas
into action. Don’t let a lack of familiarity with apps and software hold a construction
team back from embracing a lean methodology. It only takes picking out a technique,
choosing a complementary app and giving it a try to see the difference it can make to a
construction firm’s bottom line.

References
[1] What is Lean?, The Lean Way.

[2] Report: Global construction waste will almost double by 2025, Construction Dive.

[3] Measuring the Impact of Rework on Construction Cost Performance, Journal of Construction Engineering and Management.

[4] What are the 5 S’s (5S) of Lean?, ASQ.

[5] Breaking Down the Principles of Lean Construction, ConstructConnect.

[6] The real-world case for lean construction, ConstructionDive.

Autodesk and PlanGrid are registered trademarks or trademarks of Autodesk, Inc., and/or its subsidiaries and/or
affiliates in the USA and/or other countries. All other brand names, product names, or trademarks belong to their
respective holders. Autodesk reserves the right to alter product and services offerings, and specifications and
pricing at any time without notice, and is not responsible for typographical or graphical errors that may appear
in this document. © 2019 Autodesk, Inc. All rights reserved.

10
See a Live Demo
or give us a call at +1 (415) 429-1227

PlanGrid’s Construction Productivity Software is the easiest and most cost-effective way to get substantial return
on your investment in construction mobile apps. By using PlanGrid you will:

• Complete projects faster: 90% of project costs occur in the field and not in the office. This includes
wasted time and project delays. With PlanGrid, you can reduce wasteful trips to the trailer and time delays,
while eliminating costly rework. PlanGrid also allows for faster collaboration and communication.

• Reduce costs: PlanGrid allows you to optimize productivity in the field, which
eliminates time waste that causes project overruns. By completing projects early
or on time with PlanGrid, contractors will benefit from reduced costs.

• Win more bids: The best way to bid more competitively is not just to track costs so you can provide
more accurate estimates — it’s to improve your overall productivity. PlanGrid’s Construction Productivity
Software will allow you to increase productivity so you can reduce costs and win more bids.

PlanGrid is construction productivity software used on more than 1 million projects across 90 countries.
Our software helps teams collaborate more efficiently with access to an intelligent record set on any device.

Available on the App Store Get it on Google Play Available on Windows


(3,904) (2,080)

11
Used on more than 1,500,000
projects around the world, PlanGrid
is the first construction productivity
software that allows contractors and
owners in commercial, heavy civil,
and other industries to collaborate,
collect, and share project information
from any desktop or mobile device
through the entire project lifecycle.

PlanGrid increases project efficiency by


streamlining document management,
providing construction teams with
easy access to all project information
from any device, and enabling
seamless collaboration within teams.

Connect with PlanGrid

© 2019 PlanGrid, Inc. All Rights Reserved.

United States Australia United Kingdom Canada Hong Kong


+1 (415) 963-4088 AUS 1800 316 406 +44 (0) 20 3695 0292 (800) 646-0796 +852 5808 3598
www.plangrid.com www.plangrid.com/au www.plangrid.com/gb www.plangrid.com/ca-en www.plangrid.com/zh
apac@plangrid.com emea@plangrid.com www.plangrid.com/ca-fr apac@plangrid.com

You might also like