You are on page 1of 3

*as of 1/25/2019.

Program is subject to change

Tuesday, January 29, 2019


Multi-Sector
9:40 AM - 11:55 AM - 2:40 PM -
TRACK 8:00 AM - 9:40 AM
10:15 AM
10:15 AM - 10:45 AM 10:50 AM - 11:20 AM 11:25 AM - 11:55 AM
1:00 PM
1:00 PM - 1:30 PM 1:35 PM - 2:05 PM 2:10 PM - 2:40 PM
3:15 PM
3:15 PM - 3:45 PM 3:50 PM - 4:20 PM 4:25 PM - 4:55 PM

Ultrasonic Applications Engineering Application of X-ray Backscatter Introduction to Advanced Onstream Corrosion Monitoring for
Chevron NDE Performance The Potential Role of Permanently Pulsed Eddy Current - Inspection Automated Radiography of In-service Non-instrusive Inspection (NII) of
Inspection / NDE - 1 Using Phased Array - Bruce Devices for Moisture Detection in Nondestructive Testing - Avinash Industrial Process Piping - Sam
Demonstration Qualification Testing - Installed NDT Sensors - John Nyholt, Basics and Uses - Ethan Williams, Piping - John Musgrave, Mistras Pressure Vessels - Jonathan Burns,
Ballroom A Pellegrino, Sensor Networks, Inc. Insulation - George Williamson, BP Ripla, Lloyd's Register Central and Ternowchek, Mistras Group, Inc.
Michael Sens, Chevron (0377) John Nyholt Consulting, LLC (0002) Magnetec Inspection, Inc. (0134) Group. Inc. (0232) Mistras Group, Inc. (0233)
(0015) (0028) South America, Ltd. (0194) (0229)
OPENING SESSSION / KEYNOTE SPEAKER:
Review of Applications Using UAV Sourced Integrity Information Inspection Coordination Standardization for Value vs Cost MI Quality Construction Quality Management
Inspection / NDE - 2 Mountains We Have Climbed – Mountains We Robotic Inspection for Industrial Preview of API RP 588 Source
Break in Updated FMC/TFM Methods - Becomes Part of the O&G Digital Lunch in Break in Improvemnet of Source Inspection Assurance/Quality Control Process - and Functional Checkout - Luke
Still Need to Climb - John Reynolds, Principal Assets - Brandon Tigges, Gecko Inspection - Peter Hunt, Peter Hunt Panel Discussion: Quality - Source Inspection
Ballroom C Exhibit Hall Dominique Braconnier, The Phased Revolution - Patrick Saracco, Exhibit Hall Consulting (0287) Exhibit Hall Performance - Ysolda Rujano, PREGO Energy Holley Baker, Mistras Group, Inc. Miller, Marathon Petroleum Company
Robotics, Inc. (0326)
Consultant, Intertek Array Company (0325) Cyberhawk Innovations (0136) Quality Consulting (0212) (0231) (0182)

Proposed Updates to ASME B31.3 Post Weld Predicting Dissimilar Weld Metal Weld Existing Concrete Ringwall
ASME Post Construction Standards - ASME Sec IX Reviewing Welding The Inspection of Thermal Insulation Corrosion Under Insulation - A Advances in Real Time Imaging for Water Repellancy of Industrial
AIM/Engineering Schooner Heat Treat and Minimum Temperature Failures Using Machine Learning Foundation Assessments - Kurt Tyler,
Past Present and Future - Clay Documents 101 - Grady Hatton, Pro- and CUI - Ron King, National Proactive vs. Reactive Approach - CUI Inspection - Eric Neff, QSA Insulation - Jack Blundell, Rockwool
Room Requirements - Phillip Prueter, The Equity Techniques - Martin Gascon, Intertek Wiss Jenney Elstner Associates
Engineering Group, Inc. (0263) Rodery, C&S Technology, LLC (0309) Surve Technical Service, LLC (0070) Insulation Association (0020) Kara Boyer, PinnacleART (0243) Global, Inc. (0314) Technical Insulations (0218)
(0127) (0159) ****

Downstream
9:40 AM - 11:55 AM - 2:40 PM -
TRACK 8:00 AM - 9:40 AM
10:15 AM
10:15 AM - 10:45 AM 10:50 AM - 11:20 AM 11:25 AM - 11:55 AM
1:00 PM
1:00 PM - 1:30 PM 1:35 PM - 2:05 PM 2:10 PM - 2:40 PM
3:15 PM
3:15 PM - 3:45 PM 3:50 PM - 4:20 PM 4:25 PM - 4:55 PM
Lunch in Exhibit Break in Exhibit
Opportunities to Better Capture the In-Service Flange Raised Face
Solving the Mysteries of Critical Hall Corrosion Under Insulation of Guided Wave Ultrasonics GWUT for Hall
Inspection / NDE - Galleon Tubular Management Decision Tree - Zachary Inspector/Technician Experience and the Need
Value of Today's Advanced NDT Operating Small Pipe - Josh Yoakam,
Potential MI Concerns with Clad and Weld
Inspection Utilizing TFM Phased Array
Burnett, Pro-Surve Technical Services, LLC for Detailed Inspection Plans - Dana Baham, Check Valves - Chad Patschke, Ethos Chemical Plant Pressure Vessels - Touch Point Corrosion - David Overlaid Piping due to Fabrication Issues -
I Room (0113) Becht Engineering Company, Inc. (0306) Technologies - John Burke, INVISTA HollyFrontier Companies (0075) Mark Geisenhoff, Flint Hills Resources (0425) - Mark Schramm, Pro-Surve Technical
Mechanical Integrity Solutions (0042) Andres Salazar, Worleyparsons (0061) Alleyne, Guided-Ultrasonics (0432)
(0318) Services (0114)

Establishing Integrity Operating API RP 932-B Hydroprocessing Unit Managing Ammonium Bisulfide
Case Studies: Soda Ash Related Failure of Methanol Reformer Outlet Caustic SCC of Gr. T22 (2-1/4Cr) Experience with 800HT Coker
Corrosion / Metallurgy - Case Study: Sigma-Phase Embrittlement of a
Windows (IOWs) for Refinery Fired
Pigtails - Muhammad Bilal, Saudi
Lessons Learned from New Stainless Steel
Superheater Tube Welds - Sri
REAC Systems, 3rd Edition Update - Corrosion and IOW Implementation -
OPENING SESSSION / KEYNOTE SPEAKER: Wash Piping Failures in Hydrotreaters Fired Heater’s Convection Coils - Benjamin Fabrication - Krista Heidersbach, Stress Furnace Tubes - Nathaniel Griffen,
Ballroom B Heaters - Tim Hill, Quest Integrity Jim Edmondson, Becht Engineering Michael Cayard, Flint Hills Resources,
- James McVay, Andeavor (0163) Bryant, Celanese Corporation (0017) International Petrochemical Company Engineering Services, Inc. (0429) Chimbli, Stress Engineering Services, Phillips 66 (0288)
Mountains We Have Climbed – Mountains We (0344) Company, Inc. (0078) LLC (0068)
Break in (0289) Inc. (0328)
Still Need to Climb - John Reynolds, Principal Exhibit Hall FFS Case Study: Evaluation of Crack-like FFS: Discussion of the Cracking Assessment Remaining Life Assessment of Heater Tubes Case Study: FFS Program P91 Making Sense of Piping Vibration
AIM / Engineering Clipper Consultant, Intertek Flaws at Ring Joint Grooves - Melanie
Using 3-D Laser Scanning for FFS
Input Parameters and Related Estimation
Fitness-for-Service: The Fire Damage
Using MPC Omega Method - Sudharsanan Operating in the Creep Rande - Lange
Vibration Integrity Management – New Process Piping Vibration Assessment
Measurements - Rob Swindell, Wood
Finite Element Models - Michael Assessment Process and Lessons Learned - Tools to Avoid Fatigue Failure - and Mitigation - Scot McNeill, Stress
Room Sarzynski, Wiss Janney Elstner Associates, Methods - Daniel Ayewah, Stress Engineering Gyorgy Szasz, Stress Engineering Services,
Soundararajan, Abudhabi National Oil Kimball, Stress Engineering Services, (0338)
Inc. (0162) Cifuentes, TXF Ingenieria (0193) Services, Inc. (0340) Company-Refining (0264) Michael Cyca, Wood (0337) Engineering Services, Inc. (0203)
Inc. (0302) Inc. (0208)
RBI / HTHA HTHA Advanced Vulnerability
Advanced Complementary HTHA
HTHA PANEL How People, Processes and Interaction of RBI, IOWs and CCDs in
(AIM / Engineering Subtrack) Inspection and New API 941 NDE How Risk-Based Inspection
Assessments, Inspections, and FFS Incipient Hydrogen Damage in a 1Cr including Technology provide RBI Program Mechanical Integrity Programs -
Guidance - Joseph Krynicki, Challenged My Life - Brent Ray,
Yacht Room Approach - Arthur Jensen, PBF
ExxonMobil Research and
Reformer Reactor - Clay White, (0400) 0228 ("On-Stream Acoustic Emission Monitoring for Instantaneous Detection of HTHA Cracking")
Marathon Petroleum Company (0003)
Success - Monica Hernandez, Lloyd;s Juergen Deininger, TUEV SUED
Energy (0363) 0022 ("Recent NDE Developments and FFS status from E2G HTHA JIP") Register Energy Canada, Ltd. (0144) Industry Services, GmbH (0171)
Engineering Company (0031)

Midstream
9:40 AM - 11:55 AM - 2:40 PM -
TRACK 8:00 AM - 9:40 AM
10:15 AM
10:15 AM - 10:45 AM 10:50 AM - 11:20 AM 11:25 AM - 11:55 AM
1:00 PM
1:00 PM - 1:30 PM 1:35 PM - 2:05 PM 2:10 PM - 2:40 PM
3:15 PM
3:15 PM - 3:45 PM 3:50 PM - 4:20 PM 4:25 PM - 4:55 PM

Mobile Reporting and Tracking for Real-Time Distributed Monitoring & Using Satellite-Based Hyperspectral Imagery
The Digital Integrity Dig”. What? Success Through Data Implementation A Practicum on Pressure Testing - Full-Scale Testing to Develop a
Inspection / NDE/Eng. & Improved Pipeline Integrity Measurement for Pipeline Asset Integrity - for Pipeline Integrity, Leak Detection and Panel: Midstream is Becoming Mainstream: Technology and Innovation in the
OPENING SESSSION / KEYNOTE SPEAKER: Management, Rana Ghosh, Intertek
Why? And How?”, Paul Muir, Mobideo Challenges - Larry Green, Williams Compilation of Best Practices - Sheri Dean Rheaume, Baker Hughes, a GE
Pipeline Leak Rate Estimation Tool - Compliance - Peter Weaver, Orbital Sidekick Midstream Sector
Analysis Galleon II Room Mountains We Have Climbed – Mountains We (0155) Company (0332) Baucom, RCP, Inc. (0158) Company (0331) Sanjay Tiku, BMT Canada, Ltd. (0348) (0133)
(0080)
Break in Lunch in Break in
Still Need to Climb - John Reynolds, Principal Exhibit Hall Exhibit Hall Exhibit Hall
Consultant, Intertek Rectifier Selection: "What's Right for Benefits of Coating Inspection - Successful UT Examination of a Interpreting Internal Corrosion
Alternating Current Interference on Methods for Mitigating Corrosion - Lessons Learned Hard Spots Failures - Internal Corrosion Monitoring The Mechanical Aspects of Internal
Corrosion / Metallurgy your Application" - Don Olson, IRT Brandon Neuberger - Capital Modified Storage Tank Shell-to- Coupon Data – What does it Mean? -
Pipelines - Anthony Ashiofu, Jr., Lance Witt, Integrity Measurement & Nigel Strike, Boardwalk Pipeline Methods - Lance Witt, Integrity Corrosion Monitoring - Jerry Brown,
Harbor Room Integrated Rectifier Technologies, Inc. Inspectors (435) / Moderator: Don Bottom Weld - Juan Carlos Ruiz-Rico Jane Brown, Brown Corrosion
RK&K (0405) Control (0412) Partners, LP (0404) Measurement and Control (0411) Brown Corrosion Services, Inc. (0413)
(0043) Olson (0058) Services, Inc. (0410)

Upstream
9:40 AM - 11:55 AM - 2:40 PM -
TRACK 8:00 AM 0 9:40 AM
10:15 AM
10:15 AM - 10:45 AM 10:50 AM - 11:20 AM 11:25 AM - 11:55 AM
1:00 PM
1:00 PM - 1:30 PM 1:35 PM - 2:05 PM 2:10 PM - 2:40 PM
3:15 PM
3:15 PM - 3:45 PM 3:50 PM - 4:20 PM 4:25 PM - 4:55 PM

CLASS and CAIP Oil Tanker Survey Identification of Base Metal Cracking in
Popular O&G Inspections Using PAUT Subsea Inspection with Game Deployment of Robotic Tool to Verify Advances in Phased Array Inspection
Inspection / NDE Spinnaker Using Drones and Software - Patrick Stainless Steel Lined High Temperature
Planar Array Tool for Volumetric Surface Advances in Nondestructive Assessment of
OPENING SESSSION / KEYNOTE SPEAKER: and TFM - Dillon Smith and Guillaume Changing MEC Technology - Andreas
Saracco, Cyberhawk Innovations
Integrity of Spar Platform Ballast Tank of API 620 LNG Tanks - Chris Reactors - Stanley Botton, Stanley F. Botton
Defect Detection and Measurement - Dan Used Oilfield Coiled Tubing - Roderic Stanley,
Room Mountains We Have Climbed – Mountains We Neau, M2M NDT, Inc. (0047) Boenisch, Innospection, Ltd. (0054) _ Esteban Cesan, SONOMATIC (#TBD) Magruder, Olympus NDT (0246) NDT Consultants (0431)
Keck, Exxam Systems, LLC (0286) NDE Information Consultants (0293)
(0137)
Break in Lunch in Exhibit Break in Exhibit
Still Need to Climb - John Reynolds, Principal Exhibit Hall Hall Hall
Consultant, Intertek Erosion and Sand Management in the Mitigation & Control Strategy for Implementing Electrochemical Impedance Evaluation of Compatibility Between SS430,
Erosion in Bypass of Level Control Gathering System Integrity Evaluation
Corrosion/Metallurgy Wear Resistance PVD Coatings - Unconventional Business - Juan Organic Acid Corrosion - Afizza Izzma
CRA Metal Cladding with High Velocity Unexpected SCC Failures on High pressure Spectroscopy as a Tool to Determine Biofilm
SS304, and SS316L Alloys and Peracetic Acid
Valve in Gas Plants - Hatam Mehraz, - Christopher Perez, ShellSEPCO Thermal Spray in Upstream Static Equipment - 316SS Offshore Block Valves, Riza Khan, In- Formation on the Carbon Steel Surfaces - Raicelina
Galleon III Room David Bell, Phygen (0418) Gonzalez, Shell Upstream Americas Mustapa, PETRONAS Carigali Sdn Iain Hall, Integrated Global Solutions (0427) Corr-Tech, Ltd. (0350) Ramos Nalco Champion, An Ecolab Company
in Presence of Chlorides - Yolanda De-Abreau
Saudi Aramco (0032) (0428) (0424)
Unconventionals (0417) Bhd (0038) (0422)
*as of 1/25/2019. Program is subject to change

Wednesday, January 30, 2019


Multi-Sector
9:40 AM - 11:55 AM - 2:40 PM -
TRACK 8:00 AM - 8:30 AM 8:35 AM - 9:05 AM 9:10 AM - 9:40 AM
10:15 AM
10:15 AM - 10:45 AM 10:50 AM - 11:20 AM 11:25 AM - 11:55 AM
1:00 PM
1:00 PM - 1:30 PM 1:35 PM - 2:05 PM 2:10 PM - 2:40 PM
3:15 PM
3:15 PM - 3:45 PM 3:50 PM - 4:20 PM 4:25 PM - 4:55 PM

Installed Sensors and Cloud Software for Nondestructive - Base Asset Management Corrosion Blisters and Blooms Handheld Analyzer for Carbon, CE Effects of Weld Type Variation on Phased Array Assisted Analysis Omnidirectional Magnostrictive Transducer Inspection of Heat Recovery Steam
Automated Guided Wave Monitoring -
Inspection / NDE - 1 Continuous Monitoring and Analytics - Ken Techniques for High Pressure LDPE Evaluation - Pulse Eddy Current Eddy Current Array vs Penetrant Testing for
Determination in Pipeline, Refinery TFM Image Techniques - Emilie Software for Weld Inspections - for Guided Wave Testing of Large Shells - Generators Using Nondestructive
Holditch, Baker Hughes, a GE Company
Panel Discussion: Permanently Mounted Sensors Equipment - Myles Parr, Structural Integrity
Inspecting Stainless Steel - James Bittner,
Sergey Vinogradov, Southwest Research
Thomas Vogt, Guided Ultrasonics,
Ballroom A Testing - Timothy Rush, Mistras Olympus Corporation of the Americas (0237) Materials - Don Sackett, SciAps, Inc. Peloquin, Olympus Scientific Nicholas Bublitz, VeryPhase, Inc. Testing - Shawn Gowatski, TesTex,
(0330) Associates (0238) Institute (0282) Ltd. (0312)
Group, Inc. (0235) (0385) Solutions Americas (0273) (0274) Inc. (0301)
The Three Key Pieces of an Integrity Field Practice of Magnetic Flux Inspection Careers - Where to Begin Development of a Pipeline Baseline Heat Exchanger inspections Proactive Systematic Approach to
Continuing Education for Inspectors - Inspector Training Post Certification: Performance Evaluation of Anti- Benefits of DDA X-ray for Corrosion Alignining Fitness for Service for
Inspection / NDE - 2 Management System - Jeremy Staats and Leakage Methodology- Some Pitfalls - API and ICP - A Guide to Involvement - Break in and Where to go to Next - Kimberly Lunch in Construction Inspector Career to Reduce Costs and Unscheduled Break in Identify and Prioritize Structural
Randall Stremmel, RPS Welding Cultivate & Grow Inspection Leaders, Condensation Coatings Kareem Damage Mechanisms - Brian Fiber Reinforced Polymers - Geoff
Ballroom C Steve Bolinger, Becht Engineering Company, Roderic Stanley, NDE Information Terry McLane, HollyFrontier (0126) Exhibit Hall Meszaros, Codes and Standards Exhibit Hall Roadmap - Ritch Rappel, Rappel Downtime - Timothy Rush, Mistras Exhibit Hall Infrastructure - Tom Kline, Structural
Inc. (0393) Consultants (0062) Tony Medina, PinnacleART (0215) Khali Yansab (SABIC) (0304) Anderson, Acuren (0389) Clarkson, UTComp, Inc. (0168)
Consultants (0093) Training Institute (0343) Inspections, Ltd. (0165) Group, Inc. (0224) Technologies (0023)
Asset Integrity Management – Next Generation Asset Performance Turnaround Management - Maximizing MI Reliability of Nondestructive Testing Increasing Uptime in Plant Reliability Benefits of Implementing an Remote Acoustic Emission Fitness for Service (FFS) Developments in
Realizing the Full Potential of an Continuous Monitoring of Assets -
AIM/Engineering Schooner Training and Experience or Management - David Drerup, The Role of Emerging Technology in Driving
Program Value During Shutdowns - John Data for Fitness for Service by Deploying Asset Monitoring Appropriate Data Management Monitoring of Critical Fixed Fatigue Screening Criteria for Piping
Shutdown/Turnaroung/Outage (STO)
Bailey, Innovatice Inspection Solutions
Integrity Data Management System - Mike Wechsler, Mistras Group, Inc. Vibration Assessments - Michael Bifano, The
Room Techniques? - Peter Millar, MMD Operational Sustainability, LLC Success - Paul Muir, Mobideo (0132) Assessments - Morteza Jafari, ABSG Solutions - Arturo Nunez, Mistras System - Natalie Mc Intosh, Lloyd;s Equipment - Steven Garcia,
(0185) Stephen Flory, PinnacleART (0179) (0225) Equity Engineering Group, Inc. (0214)
Equipment and Service (0024) (0087) Consulting, Inc. (0249) Group, Inc. (0230) Register (0196) Ameriscan, LLC (0206)

Downstream
9:40 AM - 11:55 AM - 2:40 PM -
TRACK 8:00 AM - 8:30 AM 8:35 AM - 9:05 AM 9:10 AM - 9:40 AM
10:15 AM
10:15 AM - 10:45 AM 10:50 AM - 11:20 AM 11:25 AM - 11:55 AM
1:00 PM
1:00 PM - 1:30 PM 1:35 PM - 2:05 PM 2:10 PM - 2:40 PM
3:15 PM
3:15 PM - 3:45 PM 3:50 PM - 4:20 PM 4:25 PM - 4:55 PM

Continuous Thickness Monitoring in Process Heater Tube Temperature Phased Array Detection and Long Range Wireless UT Sensor Contact Point Corrosion detection using
The Value of a Baseline Inspection: CML Optimization / Allocation - Grady
Inspection / NDE Galleon High-Temperature Service - Tim High Temperature (400 degF) Phase Array Identification and Inspection of Critical
Monitoring: Best Practices - Frank Carburization Inspections for Radiant Tubes
Piping CMLs: Optimizing Numbers, Placement, and Data Analysis
Metallurgical Analysis of Creep Adoption: Corrosion Monitoring & Guided Current Testing (GCT) - Paul Nash,
Ultrasonic Examinations in Lieu of Thermowells - Jay Hawkins, Marathon Fired Heater Coils - Tim Haugen, within Ethylene Cracking Furnaces - Wichit Hatton, Pro-Surve Technical Caron Steel Inspection subsiduary of Versa
I Room Stevenson, Ionix Advanced Radiography - David Bajula, Acuren (0388) Petroleum Corporation (0437) Liu, Code Inspection RI Techniques Yokyongpraserd, SCG Chemicals, Ltd. (0187) Fatigue Cracking - Terry Haigler, Inspection - Steve Strachan, Sensor
Quest Integrity (0099) Services, LLC (0071) Integrity (0317)
Technologies (0201) (0025) Intertek (0145) Networks, Inc. (0101)
Compressor Inter-cooler tube Failures by Microbial Corrosion: Post- Union Oil Wet H2S Cracking Incident Elimination of Backing Gas in Using Advanced Analysis to Reduce Localized Corrosion Inspection
Micro-Biologically Induced Corrosion - Construction Damage and Mitigation - RCA of Tube Failure in Waste Heat Plant and Circuit Wide CCD/IOW 35 years Later - Gerrit Buchheim, Heat Treating - A Journey through Austenitic Stainless Steel Welds - Hydrogen Bakeout Times - Scott Review of Recent HF Alkylation Locations for HF Alkylation Unit in
Corrosion / Metallurgy - Muhammad Bilal, Saudi International
ASME Section IX Welding - Process,
William (Bill) Schaal, Gilbane (0290) Boiler - Hassan AlHammad, Kemya (a Implementation Process - Brian Jack, Becht Engineering Company, Inc. Time and Temperature - Andrew Charles Patrick, ALS Maverick Bouse, WJE Associates (0151) Procedure and Performance - James Harris, Piping Failures at HollyFrontier - Refinery - Huang Lin, Lloyd's
Ballroom B Petrochemical Company (0294)
SABIC & ExxonMobil JV) (0255) E2G (0122) (0391) Bohm, Fulcrum Reliability (0097) Testing Laboratories, Inc. (0019) Marathon Petroleum Corporation (0021) Terry McLane, HollyFrontier (0374) Register Energy Associates (0396)
Break in Lunch in Break in
Eight Pillars of Mechanical Integrity - MI Fundamentals: Roadmap to Q1 Exhibit Hall Automating Time/Condition-based Inspection Exhibit Hall Using Mechanical Integrity Exhibit Hall MPT - Where Are We Heading With API 934F
Evaluating the Damage Tolerance of Coke
AIM / Engineering Clipper Steven Bolinger, Becht Engineering Pressure Vessels 101 ASME Design by Rule Performance - William Minter, Strategy Development - Vipin Nair, GE Digital
Mechanical Integrity Program Development When Life Gets in the Way: Discontinuous
Improvements in Planning a Successful
and API 579 -Gerrit Buchheim and Jim
Drum Support Skirt Designs - Seetha
Fitness for Service (FFS) Reevaluating
for Pressure Vessels - Marvin Coats,
and Scott White, Flint Hills Resources
Panel Discussion: Big Data and You for New Construction - Matthew Caserta, Vacuum Rings - Melanie Sarzynski, Wiss McLaughlin, Becht Engineering Company,
Kummari, The Equity Engineering Group,
Distance to a Structural Discontinuity - Scott
Room Company, Inc. Hellier/Codewest (0279)
PinnacleART Becht Engineering Company, Inc. (0204) Janney Elstner Associates, Inc., (0160)
Turnaround - Wilfredo Rivera, GE Digital Inc. Bouse, WJE Associates (0152)
(0359) (0174) (0426) (0313) Inc. (0149)
(0392)

Owner User Modification of API-581 RBI Model for Creep Based on RBI Model for Creep Based on Case Study: Steam System Risk Optimizing Pressure Relief Valve Qualitative RBI Approach For Heat Risk-Based Inspection Methodology Using Actual Pop Test Results to
RBI / HTHA Benefits & Limitations of using RBI Enhanced RBI for Exchanger Evergreening an RBI-Based Fired Heater Risk-Based Inspection
Levels of Inspection Effectiveness Larson Miller Parameters - Panos Larson Miller Parameters - Panos Mitigation using RBI - Robert Sladek, Inspection Intervals - Nancy Faulk, Exchanger Damages Mitigation - for Bundles, Tanks and Furnace Determine PRD Risk - Hassan
(AIM / Engineering Subtrack) on ASTs - John Britton, DNV GL Bundles - Ricardo Gonzalez, TOTAL Inspection Program - Ben Charlton, Methodology - Phil Henry, The Equity
Procedures - Mark Vining, Mistras Topalis, DNV/GL and Lynne Kaley, Topalis, DNV/GL and Lynne Kaley, Asset Optimization Consultants Siemens Ahmad Raza Khan Rana, Dalhouse Tubes - Lynne Kaley, Trinity Bridge, (Shervin) Sadeghi, Lloyd;s Register
Yacht Room (0091) SA (0069) Valero Three Rivers (0315) Engineering Group, Inc. (0299)
Group, Inc. (0072) Trinity Bridge, LLC (0283) Trinity Bridge, LLC (0283) (0241) (0180) University (0161) LLC (0285) (0153)

Midstream
9:40 AM - 11:55 AM - 2:40 PM -
TRACK 8:00 AM - 8:30 AM 8:35 AM - 9:05 AM 9:10 AM - 9:40 AM
10:15 AM
10:15 AM - 10:45 AM 10:50 AM - 11:20 AM 11:25 AM - 11:55 AM
1:00 PM
1:00 PM - 1:30 PM 1:35 PM - 2:05 PM 2:10 PM - 2:40 PM
3:15 PM
3:15 PM - 3:45 PM 3:50 PM - 4:20 PM 4:25 PM - 4:55 PM

NDE Performance Verification for Understanding Crack ILI Performance Pipeline Dent Integrity Management Remote Detection of Stress In-line Screening of Small Diameter Improvements in Crack Depth Sizing A Proven Methodology for Integrity
Deformation Program Performance Effect of Pipeline Deposits on MFL Guided Waves for Structural Health Use of Drones to Inspect Aerial Improving Safety Through
Inspection / NDE /Eng, & Pipeline Operators, Sarah Johnson, Using In-the-Ditch NDE - Karmun Guide Development - API RP1183, Magnetization to Inspect and Map Pipelines Using Free-floating Smart and Benefits for Integrity Assessment of Facilities Piping -
Evaluation - Michael Snow, Enbridge Sensors - John van Pol, Ingu Sizing Accuracy of Pinholes - Joel Monitoring of Pipeline - Sang Kim, Pipeline Crossings - David Hunter, Technology and Innovation - Jason
Analysis - Harbor Room Marathon Pipe Line and Andri Doucette, Enbridge Liquids Pipelines Mark Piazza, Colonial Pipeline Pipelines - Paul Jarram, Speir Hunter Management - Ryan Sikes, NDT Juan Carlos Ruiz-Rico, DNV GL
Liquids Pipeline (0384) Solutions, Inc. (0265) Falk, Desjardins Integrity, Ltd. (0324) Guides Wave Analysis, LLC (0205) Pond & Company (0352) Forte, Insitu (0079)
Orphanides, API (0139) (0362) Break in Company (0345) Limited (0039) Lunch in Global, LLC (0319) Break in (0074)

The Unique Inspection Requirements The Next Generation CP for Double Exhibit Hall Exhibit Hall Exhibit Hall
Tank Tales: Storage Tank Failure and Current Corrosion Protection not The Inspection of Vented, Fiberglass Approaching API 653 Tank Internal Lining for Fuel Grade Ethanol: Why Seismic Loading of Aboveground Storage Use of Corrosion Coupons and ER
Storage Tanks Pipeline and Tank Floor Inspection with
of Bolted CHIME Tanks - John Bottom Tanks has Arrived- Louis Inspections as Business Opportunities - Tanks: Design and Fitness-For-Service
Game Changing MEC Technology - Andreas Damage Investigations - Ana Benz, working?, VCI can help! - Kelly Baker, Storage Tanks - John Cornell, H.I.R. Lennar Perez, CITGO Petroleum Corporation
Has it Been So Challenging? - David Considerations - Phillip Prueter, The Equity
Probes for AST's - Louis Koszewski, Panel Discussion: Robotics in Tank Inspection
Spinnaker Room Boenisch, Innospection, Ltd. (0053) Cornell, H.I.R. Technical Services Koszewski, US Tank Protectors, Inc.
IRISNDT (0029) Zerust Oil & Gas (0046) Technical Services (0129) (0399) Cushman, West Virginia Paint (0433) Engineering Group (0148) US Tank Protectors (0178)
(0128) (0177)

Upstream
9:40 AM - 11:55 AM - 2:40 PM -
TRACK 8:00 AM - 8:30 AM 8:35 AM - 9:05 AM 9:10 AM - 9:40 AM
10:15 AM
10:15 AM - 10:45 AM 10:50 AM - 11:20 AM 11:25 AM - 11:55 AM
1:00 PM
1:00 PM - 1:30 PM 1:35 PM - 2:05 PM 2:10 AM - 2:40 PM
3:15 PM
3:15 PM - 3:45 PM 3:50 PM - 4:20 PM 4:25 PM - 4:55 PM
Break in Exhibit
New Advances in Contact Point Advances in PIpeline Leak Detection - Field Evaluation of Eddy Current Hall A Wireless, Battery Free Permanently
Inspection / NDE
Corrosion Technology - Brian Ronnie Little, SPL Leak Detection Probe - David Brown, VM Products Installed Ultrasonic Sensor - Tom In
Galleon II Room Beresford, VIR Inspection, LLC (0368) (0370) (0415) Knowles Jackson, Inductosense (0256)
Lunch in Exhibit Break in Exhibit
Hall Hall
Maintaining Aging Infrastructures in Pipeline Metal Loss Evaluations per API 579- Assessing Performance of a Corrosion Moving from Conformance to Improving Quality in Offshore
Carpon Fiber Pipe _ The End of SURF RBI - Cost Effective Solutions Asset Integrity Management Best Inspection Process: The "What", Proactive Design Criterion to Maximize
AIM / Engineering Galleon Upsream Operations - A Continuum 1/ASME FFS-1 Fitness-For-Service Rules -
Monitoring of Structural Integrity of Offshore
Dead Leg Inspection Management Control Program & Data Analytics - Jamie Improvement: A Case for Quality Projects: Adding Value Through
Kraig Shipley, The Equity Engineering
Structures in Cold Regions - Arpit Dev, OMCI Upstrream Corrosion _ Matthew to Mitigate Identified Risks - Eric Practices - Tony Poulassichidis, "When", "Who" and "How" - Tony Integrity of Facility Assets - Meshary Al-
Davidson, Lloyd;sRegister Energy Americas,
III Room of Approaches - Travis Harrington, Rig Technical and Support Services (0311) Systems - Eric Onya, SNEPCo (0320) Management - Joey Poret, Chevron Inspection - Joey Poret, Chevron
Group, Inc. (0278) Massey #439 Allen, DNV GL (0057) Anadarko (0063) Poulassichidis, Anadarko (0064) Bahli (0073) Inc. (0077)
Anadarko (0005) Corporation (0085) Corporation (0086)
*as of 1/25/2019. Program is subject to change

Thursday, January 31, 2019


Multi-Sector
9:40 AM - 11:55 AM -
TRACK 8:00 AM - 8:30 AM 8:35 AM - 9:05 AM 9:10 AM - 9:40 AM
10:15 AM
10:15 AM - 10:45 AM 10:50 AM - 11:20 AM 11:25 AM - 11:55 AM
1:00 PM
1:00 PM - 1:30 PM 1:35 PM - 2:05 PM 2:10 PM - 2:40 PM
Instrumented Indentation Tests to Improving Inspection Reliability With
Using Autonomous Drones for
Inspection / NDE - 1 Measure Tensile Properties in Field -
Review of Several New Improvements to Full
Advanced Nondestructive Testing The Ultimate Safety Moment - David
Ultrasonic Inspection of Flare Stacks - Matrix Capture of Total Focusing Method -
Ballroom A Dongseong Ro, Frontics America Alan Caulder, Advanced OEM Solutions (0323 Techniques - Shannon Matthewson, Bajula, Acuren (0387)
Jamie Branch, Apellix (0117)
(0222) Wood (0336)
Mobile/Digital Inspection and Testing Pressure Safety Valve Integrity The Value of Using Dimensional Technologies
Moving Ultrasonic Data Without
Inspection / NDE - 2 for Mechanical Integrity Programs - Management Using Risk and Break in for Digitalization of the Physical Asset - Boxed Lunch
Cabling - Mike Wechsler, Mistras
Ballroom C Russ Davis, Mistras Group, Inc. Reliability Method - Steve Matthews, Exhibit Hall Matthew Craig, Becht Engineering Company, Foyer
Group, Inc. (0226) Inc. (0394) ***
(0227)*** Petrofac (0295)

Quantifying Infrared Temperature Introduction to a Proposed Rewrite of API-579 Detection and Sizing of Stress
AIM/Engineering Developing and Sustaining Future Mechanica Success Through Data Implementation When Life Gets in the Way: Discontinuous
Integrity Specialists/Leaders - Clay Rodery, Challenges - Larry Green, Williams Company Vacuum Rings - Melanie Sarzynski, Wiss Corrections From Art to Science - Part 3 Procedures - Seetha Kummari, The Corrosion Cracking - Timothy Rush,
Schooner Room C&S Technology, LLC (0308) (0332) Jenney Elstner Associates, Inc. (0160) Nagy Wassef, Quest Integrity (0357) Equity Engineering Group, Inc. (0166) Mistras Group, Inc. (0234)

Downstream
9:40 AM - 11:55 AM -
TRACK 8:00 AM - 8:30 AM 8:35 AM - 9:05 AM 9:10 AM - 9:40 AM
10:15 AM
10:15 AM - 10:45 AM 10:50 AM - 11:20 AM 11:25 AM - 11:55 AM
1:00 PM
1:00 PM - 1:30 PM 1:35 PM - 2:05 PM 2:10 PM - 2:40 PM

Discussing Structural Tmin for Latest Advancements in PMI by XRF Unmanned Data Management – Common Errors when Conducting Cracking Development of a Wall-Sticking Case Study: Wall Loss Due to Flow
Components of a Modern PMI A105/A106 QA QC and Metallurgical
Inspection / NDE Piping: Update to API 574, Table 6 - & LIBS Handheld Analyzers - Mark
Digitalization and Standardization of Visual
Inspections and Beyond - Danny and Bulging Inspections of Coke Drums - Drone for Non-Destructive Ultrasonic Accelerated Corrosion - Lange
Program - Michael Hull, Olympus Inspection Data for Business Intelligence -
Mahmod Samman, Houston Engineering
Considerations - Puneet Saggar,
Galleon I Room Kraig Shipley, The Equity Lessard, ThermoFisher Scientific Ross Boyd, TruQC, LLC (0353) Landry, Premium Inspection & Testing - Rami Mattar, Amerapex Kimball, Stress Engineering Services,
(0358) Solutions, LLC (0200) Lloyd's Register (0176)
Engineering Group, Inc. (0280) (0346) Testing Group (0367) (0055) Inc. (0209)

Duplex Stainless Steel REACs in Case Study of Premature Cracking on Case Studies Demonstrating
Corrosion Resistance Performance of Nickel-cobalt A105/A106 Metallurgical and Brittle Damage Mechanisms in old Mn-Mo Alkaline Carbonate Stress Corrosion
Corrosion / Metallurgy Electroplating on High-Strength Steel Fasteners for Refinery Hydroprocessing Units _ Stainless steel Gas Cooler - Roxanna Alvarez Classification Of Corrosion Failures - Corrosion concerns (Design and
Upstream/Downstream Applications - Omar Rosas, Fracture Considerations - Puneet Vessels - David Moore, Becht Cracking - A Case Study - Mike Guerra, Lloyd's Register Energy Americas,
TBD
Hilton Crystal Ballroom David Moore, Becht Engineering Gerald Hunt, Scientific Testing (0198) Material Selection) - Vishal Lagad,
Doxsteel Fasteners (0334) Saggar, Lloyd's Register (0156) Engineering Company, Inc. (0143) Schmidt, CHS, Inc. (0183) Inc. (0157)
Services, Inc. (0436) Lloyd's Register (0124)
Break in Boxed Lunch
ASME B&PV Code VIII-2: Background,
Performance-Based Assessment of an Investigating the Root Cause of a Exhibit Hall Spring Hanger Pipe Support Inspection and Lessons Learned in Piping Foyer Integrity Maps for a Refinery - Steven Common Pitfalls of a PRV Reliability
Simplified Fracture Mechanics for ASME B31.3 Piping Achieving Mechanical Integrity: A
AIM / Engineering Initiatives and Cost Savings - James
Incinerator Stack Using Field Measurements -
Heater Convection Tube Leak - Arthur Using a Minimum Allowable Temperature Method - Kraig Maintenance - Chuck Thornton, Versa Troubleshooting and Design - Bolinger, Becht Engineering Company, Program - Chad Patschke, Ethos
Holistic Approach -Gregory Weber,
Kenny Farrow, Stress Engineering Services,
Galleon III Room Sowinski, The Equity Engineering Group, Inc. Jensen, PBF Energy Shipley, The Equity Engineering Group, Inc. Integrity Group108 Charles (Chuck) Becht, Becht Inc. Mechanical Integrity Solutions, LLC
Canada (0281) Fidelis Associates (0327)
(0298) (0300) (0360) (0366)
(0354) (0375) Engineering Company, Inc. (0421)

RBI / HTHA Can you Manage RBI Records real- Risk-based Inspection Applied to IOW's: Why You Need Them & How to IOWs - Implementation Experience
Non-Intrusive NDT and Customized Utilizing RBI to Evaluate Feed and Case Study: Qualitative Risk
time during a Turnaround? Russian Refineries - Karina Justify Within Your Organization - and Lessons Learned - Vishal Lagad, RBI Best Practices Jimmie George,
(AIM / Engineering Subtrack) RBI Solutions - Siddarth Sanhavi, Other Operational Changes - Clay Assessment of a Refrigeration TBD
Absolutely! - Guy Bogar, TGR Allogulova, ZAO "GIAP-DIST Center" Phil Garcia, PinnacleART Lloyd's Register The Equity Engineering Group (0118)
Clipper Room PinnacleART (0329) White (0398) System - Robert Sladek, AOC (0083)
Industrial Services (0108) (0103) (0130) (0172)

Midstream
9:40 AM - 11:55 AM -
TRACK 8:00 AM - 8:30 AM 8:35 AM - 9:05 AM 9:10 AM - 9:40 AM
10:15 AM
10:15 AM - 10:45 AM 10:50 AM - 11:20 AM 11:25 AM - 11:55 AM
1:00 PM
1:00 PM - 1:30 PM 1:35 PM - 2:05 PM 2:10 AM - 2:40 PM

Corrosion Under Insulation in Improved Methods for Estimating Reverse Engineering for OSHA Compliance Suitability for Service: Undocumented
Inspection / NDE/Eng & Pipelines. A Case Study - Bernardo
Engineering Analysis of Backfilling Practices
for Pipeline Maintenance Activities - Aaron
Fatigue Life of ERW Pipelines - when Design Documentation is Missing, Ryan Pressure Vessels and State Specials - Daniel
Managing Corrosion in Slug Catchers -
Mandar Kulkami, Stress Engineering
Advances in Leak Detection - Ronnie Little,
Capturing Best Practices for Third Party
Inspections of Facilities Construction - Andy TBD
Cuervo, G2 Integrated Solutions Jones, The Equity Engineering Group, Inc. Schardine, Applied Technical Services, Inc. SPL Leak Detection (0370)
Analysis Harbor Room Dinovitzer, BMT Fleet Technology, Ltd. (0347) Sanjay Tiku, BMT Fleet Technology, Services, Inc. (0333) Duncan, Enbridge (0173)
(0271) (0310)
(0210) Ltd. (0349) Break in Boxed Lunch
Exhibit Hall Foyer
DNA Testing, What is it and How Can Codes & Standards Review of Elextrically Lessons Learned on Implementing a
Corrosion / Metallurgy Troubleshooting Rectifiers, C.M. Resistive Pipeline Coatings - Bob Buchanan,
Dead Legs - Prioritization, Remedies and
Process Safety Approach to Assess Pipeline
it Help? - Tom Pickthall, EnhanceCo, Seal for Life Industries (0408) see previous Failures - Jerry Brown, Brown Corrosion
Integrity Barriers - Adriana Paiva, Shell (0423)
Successful NDE Facility Integrity Panel: 2019 Midstream Recap TBD
Spinnaker Room Nelson Witt, JA Electronics Services, Inc. (0409) Program Kendall McKinzey, PAALP #438
Inc. (0207) cell

Upstream
9:40 AM - 11:55 AM -
TRACK 8:00 AM - 8:30 AM 8:35 AM - 9:05 AM 9:10 AM - 9:40 AM
10:15 AM
10:15 AM - 10:45 AM 10:50 AM - 11:20 AM 11:25 AM - 11:55 AM
1:00 PM
1:00 PM - 1:30 PM 1:35 PM - 2:05 PM 2:10 AM - 2:40 PM

Verification and Validation of Standard An Inspired Approach to Inspection Offshore Well Casing Repair & Remediation Update of API 12 Series Tank Specification
AIM / Engineering Hammer Union Designs for API Methodology for Upstream Production Tanks Alternatives - Chanat Sirisoonthorn, Chevron
Ensuring Piping Integrity for Oil & Gas Asset
Performance Management - Haitham
and Inspection Documents - George QA/QC – Cost versus Value - Holley Boxed Lunch Aging Asset Optimisation - Hossam Aboegla,
Subcommittee 8, Task Group 5, Daniel Elizabeth Brueckner, G.K. Hills Consulting, Thailand Exploration and Production, Ltd. Morovich, Tank and Environmental Baker, Mistras Group, Inc. (0221) Foyer Lloyd's Register Energy (0296)
Yacht Room Ayewah, Stress Engineering (0341) Ltd. (0120) (0121)
AlKanderi, Kuwait Oil Company (0123)
Technologies, Inc. (0181)

You might also like