01 DL-00 Drawing Lists 02 DL-01 General Specification 03 DL-02 General Layout Plan 04 DL-03 Curve Summary 05 DL-04 Line Curve & Transaction Angle 06 DL-05 Flyover Plan 07 DL-06 Chainage Coordintes 08 DL-07 Road Vertical Section 09 DL-08 Road Typical Cross Section 10 DL-09 Excavation Cross Section 11 DL-10 Excavation and Backfilling 12 DL-11 Pavement Structure 13 DL-12 Pavement Quantity Summary 14 DL-13 Retaining Wall Elevation 15 DL-14 Retaining Wall Configuration 16 DL-15 Slope Stability Protection 17 DL-16 Protective Barrier Detail 18 DL-17 Flyover Control Line Volume 2: Bridge Ramp C No. Name Title Pages Size Remark 01 QL-00 Drawing Lists of Bridge Ramp C 02 QL-01 Design Specification of Bridge Ramp C 03 QL-02 Summary Table of Major Project Quantity of Bridge Ramp C 04 QL-03 Plan of Construction Site of Bridge Ramp C 05 QL-04 Bridge Ramp C Layout Plan 06 QL-05 Coordinate Plan of Pile Foundation of Bridge Ramp C 07 QL-06 General Arrangement of Abutment C0 08 QL-07 General Arrangement of Pier 09 QL-08 Rebar Arrangement of Pile Foundation 10 QL-09 Rebar Arrangement of Abutment 11 QL-10 Rebar Arrangement of Connection Beam 12 QL-11 Rebar Arrangement of Pile Cap 13 QL-12 Rebar Arrangement of Pier Column 14 QL-13 Rebar Arrangement of Bent Cap 15 QL-14 General Arrangement of 1st Section Box-girder 16 QL-15 General Arrangement of 2nd Section Box-girder 17 QL-16 Setting out Coordinate of Box-Girder 18 QL-17 Pre-stressed Rebar Arrangement of 2nd Section Box-girder 19 QL-18 Rebar Arrangement of 1st Section Box-girder 20 QL-19 Rebar Arrangement of 2nd Section Box-girder 21 QL-20 Rebar Arrangement of Beam Box-Girder 22 QL-21 Rebar Arrangement of Middle Diaphram 23 QL-22 Detail Notch and Anchorage of 2nd Section Box-Girder 24 QL-23 Bearing Support Arrangement of Bridge Ramp C 25 QL-24 Rebar Arrangement of Bottom Wedge And PadStone 26 QL-25 Rebar Arrangement of Restain Block of Bottom Box-Girder 27 QL-26 Structure and Rebar of Barrier and Steel Handrail on Box-girder 28 QL-27 Rebar Arrangement of Deck Pavement 29 QL-28 General Arrangement of Expansion Joints 30 QL-29 Detail Londitudinal Joints Between Bridge Ramp C And Exisiting Flyover Bridge 31 QL-30 Detail Drainage System of Bridge Ramp C 32 QL-31 Rebar Arrangement of Approach Slab 33 QL-32 Rebar Arrangement of Construction Opening Volume 3: Drainage System No. Name Title Pages Size Remark 01 GP-00 Drawing List of Drainage System 02 GP-01 Design Specification of Drainage Sytem 03 GP-02 Table Main Equipement and Material 04 GP-03 Road Standard Cross Section Piping Arrangement 05 GP-04 Existing and New Design Drainage System Layout plan 06 GP-05 Longitudinal Profile of New Design Drainage System 07 GP-06 Detail Manhole and Water pipe along Ramp E 08 GP-07 Detail Manhole and Water pipe Under Ramp C 09 GP-08 Detail Manhole and Water pipe along Ramp D Volume 4: Lighting System No. Name Title Pages Size Remark 01 DQ-00 Drawing List of Lighting System 02 DQ-01 Table Main Equipement and Material 03 DQ-02 Design Specification 04 DQ-03 General Lighting System Layout Plan 05 DQ-04 Detail Lighting Pole Component 06 DQ-05 Detail Lighting Pole Elevation 07 DQ-06 Detail Foundation of Lighting Pole 08 DQ-07 Detail Electricity Cabinet and Foundation 09 DQ-08 Diagram Lighting System for Electricity Cabinet 10 DQ-09 Wiring Diagram of Lighting System Method Statement of Project MFI NO. Name Title Pages Size Remark 01 MMS-00 Method Statement Lists 02 MMS-01 Method Bored Pile Foundation 03 MMS-02 Method Changing location of Cable Optic and Electric 04 MMS-03 Method Expand Temporary Road along Ramp E 05 MMS-04 Method Driving Sheet Pile for C1, C4, & C5 06 MMS-05 Method Formwork Support for Foundation 07 MMS-06 Method Formwork Support for Column 08 MMS-07 Method Formwork Support for Bent Cap 09 MMS-08 Method Formwork Support for 1st Section Box-Girder By Steel Tube 10 MMS-09 Method Formwork Support for 2nd Section Box-Girder By Steel H-Section 11 MMS-10 Method Bearing Support Installation 12 MMS-11 Method Coring Concrete Test 13 MMS-12 Method Pavement and Subgrade Capacity Test 14 MMS-13 Method Pre-stressed Installation 15 MMS-14 Method Repair Retaining Wall at Location C1 16 MMS-15 Method Parapet Formwork Support and Steel Handrail Installation 17 MMS-16 Method Construction Opening for Box-Girder 18 MMS-17 Method Expansion Joints Installation 19 MMS-18 Method Rubber Cushion Installation 20 MMS-19 Method Remove Formwork Support of Steel H-Section 21 MMS-20 Method Excavation for Drainage System along Ramp E 22 MMS-21 Method Repair Demaged Concrete for 2nd Section Box-girder 23 MMS-22 Method Coring Box-Girder and Exchange Steel Strain 24 MMS-23 Method Construction Work for Retaining Wall 1 & 2 25 MMS-24 Method General Pavement work and Improvement 26 MMS-25 Method Concrete Curb Installation 27 MMS-26 Method Load Test for Flyover Bridge Ramp C