You are on page 1of 12

JOB SAFETY ANALYSIS

(RISK ASSESSMENT)

Area to be Access and/or Equipment Tag No. (KKS No.) : Ash Disposal (see attached drawings)

Work to be Done : PAVING FACTORY

LOW HIGH Underwater Work Confined Space Excavation Hot Work


Risk Category Job :
Refer to Paiton Instruction : PI-05-03-01 Complex Lifting Work Working at High On Line Low & High Voltage
Work Order No. : Priority No. PAS Application No.
Work Period Date & Time Start Date & Time Finish
Operation
Applicant Health & Safety Work Parties Engineer
Supervisor
Signature :

Date : Time :

Work sequence Hazards Risk Control Measures

A. Prepartion

Ref. PI-05-03-01-F01 Page 1


Work sequence Hazards Risk Control Measures
Mobilization tools,  Good manual handling practices to be used (min. 2 person
equipment and materials lift); Use hand gloves
to the work place  Use mechanical aids where required

Manual handling Musculoskeletal injuries

 Ensure all electrical equipment in good condition and


Electrical applies for knowing how to use properly
Electrical Shock Personal injury or death
equipment & lighting  Ensure all electrical equipment has been checked before use
and has valid tagging
The excavation must be planned before work commences to
identify hazards and assess risk (refer to PP-09-19 Control of
B. Foundation (1,5 x 1,5m)
Excavation and PI09-19-01 Excavation). Sufficient equipment
and materials must be made available throughout the works.
 Ensure working tools in good condition and knowing how to
Beaten by working tools Personal injury
use properly
Sharps material laydown on the
Personal injury  Wear safety Shoes or safety boots
ground
Land clearance Injury to muscles, nerves, disc and  Good manual handling practices to be used (min. 2 person
Manual handling : lifting &
ligaments of the low back lift); Use hand gloves
carrying
Low back stain, ligament sprain  Use mechanical aids where required
Venomous insect & reptile
Bite wounds, Cut from sharp
Sharps material lay down on the  Wearing safety shoes or safety boots, and gloves
material
ground
Excavate as deep as ± 1,7
 Identify and assess any hazardous substance likely to be
meter (dimension 2,0x2,0 Hazardous Substance Personal injury
encountered or used
meter)
 The excavation work must be planned before work commences to
identify hazards and assess risk (Refer to pp-09-19 Control of
Excavation and PI09-19-01 Excavation).
Personal injury  Sufficient equipment and materials must be made available |
Poor Planing
throughout the works
 Appoint a temporary works supervisor (or responsible person), to
supervise the whole of the works, ensuring that the co-ordinator is

Ref. PI-05-03-01-F01 Page 2


Work sequence Hazards Risk Control Measures
fully briefed and conversant with equipment, installation method &
scheme layout.
 Appoint a temporary works designer when excavations are deemed
to require a support system
 Plans, drawings, etc. must be conveyed to the excavation
Due to boulder type soil supervisor.
condition,the types of ground
collapse risk control Unauthorised access Personal injury  Provide adequate barriers, signs and warning lights to
depending on how deep can prevent unauthorized person entering the site
be excavate. If the deep is
more than ankle used  Identify confined space and deal with them inaccordance
benching and shoring Confined space Trapped inside the excavation
with the confined space procedur erfer to PP-05-03, Confine
(multiplex 20mm and struts) space procedure and PI-05-03-02 Testing of Confine space
 Make sure spoil storage areas must be clearly identified
Spoil Storage Overturning
these should be minimum 2 meter away from the excavation
 Access to excavation must be by suitably safe method
(ladder)
 Personnel must not use the trench support system as a
Access/Egress Fall inside the excavation
climbing frame
 Provide suitable ladder – to be fixed at 75 degrees to the
horizontal ( 1 in 4). Tie securely at the top
 Rebar end and tie wire must turned down into reinforcement
Sharp edge. Cut from reinforcement bar end or
cage
Bar bending and tie wire

arragement rebar
Bending rebar Stains and sprains  Sufficient rest periode between jobs and avoid repetitious
twisting
 Provide adequate shoring to hold wet concrete when pouring
Install formwork for Collapse formwork cause by
pedestal (450 x 450 mm)
Struck down, wedge  Design formwork must be based on calculation from
improper shoring /stager
engineering
 Wearing rubber safety shoes; avoid walking backwards and
Wet concrete cover
Slip, fall, trip or twist ankle or knee make sure steel reinforcement not sags/give way because
reinforcement bar
not enough ties
Placing concrete
 Worm eye protection and prepare water source near work
Wet concrete splashes in eyes Eyes injury
area to flush concrete from eye/s

C. Sloof (200 x 300 cm)

Ref. PI-05-03-01-F01 Page 3


Work sequence Hazards Risk Control Measures
Grinder wheel throws off sparks
 Rebar cutters will wear safety glasses, gloves, hearing
Cutting rebar and hot bits of metal
protection, and hardhats.
Install rebar
Mill scale, sharp/sheared ends of
Setting and tying rebar tie wire can injure hands  Workers tying rebar will wear safety gloves.

 Provide adequate shoring to hold wet concrete when pouring


Collapse formwork cause by
Install formwork Struck down, wedge  Design formwork must be based on calculation from
improper shoring /stager
engineering
 Wearing rubber safety shoes; avoid walking backwards and
Wet concrete cover
Slip, fall, trip or twist ankle or knee make sure steel reinforcement not sags/give way because
reinforcement bar
not enough ties
Placing concrete
 Worm eye protection and prepare water source near work
Wet concrete splashes in eyes Eyes injury
area to flush concrete from eye/s

D. Slab /Floor

Grinder wheel throws off sparks


 Rebar cutters will wear safety glasses, gloves, hearing
Cutting rebar and hot bits of metal
protection, and hardhats.
Install rebar
Mill scale, sharp/sheared ends of
Setting and tying rebar tie wire can injure hands  Workers tying rebar will wear safety gloves.

 Provide adequate shoring to hold wet concrete when pouring


Collapse formwork cause by
Install formwork Struck down, wedge  Design formwork must be based on calculation from
improper shoring /stager
engineering
 Wearing rubber safety shoes; avoid walking backwards and
Wet concrete cover
Slip, fall, trip or twist ankle or knee make sure steel reinforcement not sags/give way because
reinforcement bar
not enough ties
Placing concrete
 Worm eye protection and prepare water source near work
Wet concrete splashes in eyes Eyes injury
area to flush concrete from eye/s

E. Install PPE pipe


diam.50 for Sanitary

Ref. PI-05-03-01-F01 Page 4


Work sequence Hazards Risk Control Measures

 Ensure working tools in good condition and knowing how to


Beaten by working tools Personal injury
use properly
Excavate as deep as 0,5
meter Personal injury, fall inside  Provide adequate barriers, signs and warning lights to
Unauthorised access
excavation prevent unauthorized person entering the site
For PPE pipe installation
under ground  Make sure spoil storage areas must be clearly identified
Spoil Storage Overturning
(minimum 2 meter away from the excavation)

Access/Egress Fall inside the excavation  Access to excavation must be by suitably safe method

 Ensure working tools in good condition and knowing how to


Beaten by working tools Personal injury
use properly
Welding PPE pipe dim.50
 Ensure working tool in good condition and knowing how to
Burn Skin injury use properly
 Use lether glove
 Ensure working tools in good condition and knowing how to
Beaten by working tools Personal injury
use properly
Laydown PPE pipe dim.50  Good manual handling practices to be used (min. 2 person
Injury to muscles, nerves, disc and
Manual handling : lifting & lift); Use hand gloves
ligaments of the low back
carrying  Use mechanical aids where required
Low back stain, ligament sprain
 Ensure working tools in good condition and knowing how to
Beaten by working tools Personal injury use properly

 Make sure spoil storage areas must be clearly identified


Backfill Soil slide Buried, personal injury (minimum 2 meter away from the excavation)
 Wearing of the requiredPPE’s
Injury to muscles, nerves, disc and  Good manual handling practices to be used (min. 2 person
Manual handling : lifting &
ligaments of the low back lift); Use hand gloves
carrying
Low back stain, ligament sprain Use mechanical aids where required

E. Mansonry

Ref. PI-05-03-01-F01 Page 5


Work sequence Hazards Risk Control Measures

Injury to muscles, nerves, disc and  Good manual handling practices to be used (min. 2 person
Manual handling : lifting &
ligaments of the low back lift); Use hand gloves
carrying
Low back stain, ligament sprain  Use mechanical aids where required
Install lightweight concrete
block
 Installation of concrete block with step. Each step is limited
Wet wall collapse Personal Injury to 1 meter after the mortar dries.
 Make sure the straightness concrete block installation
 Worm safety glove
Skin & Eyes injury
Plaster Skin & Eyes irritation  Worm eye protection and prepare water source near work
area to flush concrete from eye/s

F. Steel Structure
Fabrication (At
Workshop)

 Ensure the worker already got training


Grinder wheel throws off sparks  Put barricade around work area to prevent entry by
and hot bits of metal Skin & eyes injury unauthorized person
 Ensure fire extinguisher has been prepare
Cutting steel  Worm Safety gloves and eye protection

Accidental contact with grinder  Workers will ensure the grinder’s guard is in place and fully
Can cause bad cuts
wheel operational before use.

 Put barricade and safety sign


 Remove any flammable materials from hot work area,
relocate or protect (fire proof blanket)
Fire Burns
 Ensure fir extinguisher has been prepared
Welding  Ensure competent person undertakes all welding task
 Provide fire watcher

Welding screens to be used where appropriate: use face


Weld Flash Eyes injury
shield (welding cap)

Ref. PI-05-03-01-F01 Page 6


Work sequence Hazards Risk Control Measures

 Put barricade and safety sign


 Remove any flammable materials from hot work area,
relocate or protect (fire proof blanket)
Sparks of fire and fumes Skin injury
 Ensure fir extinguisher has been prepared
 Wear appropriate PPE while welding
Ensure surrounding work crews area aware of hot work

 Painter shall be provided with standard PPE


Hazard to health : Accidentally Personal injury  No Hot work allowed. (at immediate area)
inhaled, ingseted, eyes & skin  Flammable liquids shall be stored and dispensed only from
Painting irritation approved type containers
 No bulk storage of paint material at site (designated area
Flammable material Fire only)
 MSDS for the paint need to be place prior to work starting

G. Steel Structure
Installation
 Ensure to fixed with adequate lashing, prior to transport
 Follow on site transportation procedure and maintain speed
Damage to the material brought
Transport steel structure Load fall from vehicle limit
Personal injury
 Provide escort during transport
 Identify restricted area, install barricade & provide watchman
Damage to the material brought  Designated a lifting supervisor to check load condition
Falling / overturning of load Worker hit / crushed material  Ensure that load are properly positioned before installing
Unloading Work brought  Identify restricted area, install barricade & provide watchman
 Ensure that load are properly positioned before unlashing
Struct in between loads Personal injury
 Install tag lines
 Maintain House Keeping
Tripping to object & material Trip, slips, falls
Arranging temporary  Identify restricted area, install barricade & provide watchman
storage, installing sleepers,
Damage to the material brought  Designated a lifting supervisor to check load condition
etc
Falling / overturning of load Worker hit / crushed material  Ensure sleepers are properly installing
brought  Identify restricted area, install barricade & provide watchman
 Painter shall be provided with standard PPE
Hazard to health : Accidentally Personal injury
 No Hot work allowed. (at immediate area)
inhaled, ingseted, eyes & skin
Touch Up Painting  Flammable liquids shall be stored and dispensed only from
irritation
approved type containers
Flammable material Fire  No bulk storage of paint material at site (designated area
only)

Ref. PI-05-03-01-F01 Page 7


Work sequence Hazards Risk Control Measures
 MSDS for the paint need to be place prior to work starting
 Cans/bottles for storage paint/thinner must be labeled from
IMPOMI
 Install scaffolding by certificate scaffolder & tag by IPMOMI
Assembly of platform & Damage to exsisting facilities/
Scaffolding crumple safety officer. Always check regularly
scaffold on the ground equipment , personal injury
 Secure exsisting facilities/equipment
 Do not climb scaffold frame. Do not remove rails or bracing,
slip, fall or stepping through do not move scaffolding. Always close the hatch when
Personal injury or dead
open door hatch entering new level
 Wear full body harness double lanyard
Working on the scaffolding
getting hit in the head from tools  Know what is below and above you at all time. Use standard
or equipment dropped from Personal injury safety helmet. Use safety rope where necessary to secure
above items
 There is a dropping hazard. Take a minimum of equipment
Damage the installed equipment or
Dropped items and secure loose item. Use pocket, buckets, rope, or bags to
component below
keep item secure
 Conduct Tool Box meeting, wear proper PPE, Explanation
Damage to the crane / structure
Slip, Stumble safety standard and procedure installation before
Lifting/erection steel near
commencing each activity
structure :
1. Setting crane Damage to the material brought
 Ensure that loads are properly positioned before unlashing
2. Slinging work Struck in between loads Worker hit / crushed material
 Install tag lines
3. Inching up brought
Damage to the material brought
(By mobile crane) Worker hit / crushed material
Jamming / hitting  Give a clear & signal after checking that it is safe
brought
Damage to the structure near
 Ensure working tools in a good condition and knowing how
Beaten by working tools
Tighten bolt and nut to use properly
Personal injury
connecting the steel frame  Sufficient rest period between jobs and avoid repetitious
Strains and sprains
twisting

F. Install roofing &


cladding

Injury to muscles, nerves, disc and  Good manual handling practices to be used (min. 2 person
Lifting and install roofing Manual handling : lifting &
ligaments of the low back lift); Use hand gloves
and cladding carrying
Low back stain, ligament sprain  Use mechanical aids where required

Ref. PI-05-03-01-F01 Page 8


Work sequence Hazards Risk Control Measures
 Provide static line to which lanyard can be attached when
woring on roof
Fall overboard Personal injury or dead
 Wear full body harness double lanyard when working install
cladding from scaffolding

Ref. PI-05-03-01-F01 Page 9


Work sequence Hazards Risk Control Measures
 Ensure the worker already got training
Grinder wheel throws off sparks  Put barricade around work area to prevent entry by
and hot bits of metal Skin & eyes injury unauthorized person
Cutting roofing and  Ensure fire extinguisher has been prepare
cladding  Worm Safety gloves and eye protection
Accidental contact with grinder  Workers will ensure the grinder’s guard is in place and fully
wheel
Can cause bad cuts operational before use.

 Sufficient rest period between jobs and avoid repetitious


Strains and sprains Musculoskeletal injuries
Roofing and cladding twisting
fastener using tap screw
 Ensure working tools in good condition and knowing how to
Beaten by working tools Personal injury
use properly
G. Electrical Installation
(lightning arrester,
lighting, and
receptacle)
 Use full body harness properly
Work at heights Fall from height
Pulling cable and install  All scaffolding must be taging by IPMOMI safety officer
lighting (under & above
ground)  Make sure spoil storage areas must be clearly identified
Spoil Storage Overturning
(minimum 2 meter away from the excavation)
In-appropriate tools & PPE
 Ensure the correct tools & required PPEs are ready to use
cause hit by material & Personal injury
prior to carriying electrical isolation
equipment
Electrical isolation
Personal injury
Unintendend shutdown of other  Identifity the equipment to be isolated and the safety
Damage to exsisting facilities/
equipment / system overide to be carried out prior to isolation
equipment
 Identify & confirm the switchgear feeding electrical power to
the equipment; isolate safety electrical isolation through
Energized Unauthorized energizing Electrical shock proper tools
 install sign and do not operated without the permission from
engineering
 Dust mask for housekeeping crew when necessary
Dust dispersion Respiration system injury
 Bundles bind or contained securely to prevent slippage
H. Housekeeping
 Keep tools, equipment, extension cords, ropes etc. Out of
Disorganized tool & material Trip, slips, falls
walk ways

Ref. PI-05-03-01-F01 Page 10


Additional Note :
1. No isolation.
2. Normal work hour.
3.
4.
5.

The following test are required to assess the atmospheric conditions in the nominated space :
TEST REQUIRED
TEST FOR Permissible Exposure Limit (PEL)
YES NO
Ammonia Less than 25 ppm √
Carbon Dioxide Less than 5000 ppm √
Carbon Monoxide Less than 25 ppm √
Chlorine Less than 0.5 ppm √
Hydrogen Sulfide Less than 10 ppm √
Oxygen Greater than 19.5% & Less than 23.5% √
Ozone Less than 0.1 ppm √
Sulphur Dioxide Less than 2 ppm √
Hydrogen LEL = 4% & UEL = 75.6% √
LEL Less than/ ≤ 4% √
Ref. PI-05-03-01-F01 Page 11
Note :
1. Reference (OSHA PEL – 2013)
2. For clarification on the test required to be carried out refer PI-05-03-02 (Testing of Confined Space)

Ref. PI-05-03-01-F01 Page 12