Area to be Access and/or Equipment Tag No. (KKS No.) : Ash Disposal (see attached drawings)
Date : Time :
A. Prepartion
D. Slab /Floor
Access/Egress Fall inside the excavation Access to excavation must be by suitably safe method
E. Mansonry
Injury to muscles, nerves, disc and Good manual handling practices to be used (min. 2 person
Manual handling : lifting &
ligaments of the low back lift); Use hand gloves
carrying
Low back stain, ligament sprain Use mechanical aids where required
Install lightweight concrete
block
Installation of concrete block with step. Each step is limited
Wet wall collapse Personal Injury to 1 meter after the mortar dries.
Make sure the straightness concrete block installation
Worm safety glove
Skin & Eyes injury
Plaster Skin & Eyes irritation Worm eye protection and prepare water source near work
area to flush concrete from eye/s
F. Steel Structure
Fabrication (At
Workshop)
Accidental contact with grinder Workers will ensure the grinder’s guard is in place and fully
Can cause bad cuts
wheel operational before use.
G. Steel Structure
Installation
Ensure to fixed with adequate lashing, prior to transport
Follow on site transportation procedure and maintain speed
Damage to the material brought
Transport steel structure Load fall from vehicle limit
Personal injury
Provide escort during transport
Identify restricted area, install barricade & provide watchman
Damage to the material brought Designated a lifting supervisor to check load condition
Falling / overturning of load Worker hit / crushed material Ensure that load are properly positioned before installing
Unloading Work brought Identify restricted area, install barricade & provide watchman
Ensure that load are properly positioned before unlashing
Struct in between loads Personal injury
Install tag lines
Maintain House Keeping
Tripping to object & material Trip, slips, falls
Arranging temporary Identify restricted area, install barricade & provide watchman
storage, installing sleepers,
Damage to the material brought Designated a lifting supervisor to check load condition
etc
Falling / overturning of load Worker hit / crushed material Ensure sleepers are properly installing
brought Identify restricted area, install barricade & provide watchman
Painter shall be provided with standard PPE
Hazard to health : Accidentally Personal injury
No Hot work allowed. (at immediate area)
inhaled, ingseted, eyes & skin
Touch Up Painting Flammable liquids shall be stored and dispensed only from
irritation
approved type containers
Flammable material Fire No bulk storage of paint material at site (designated area
only)
Injury to muscles, nerves, disc and Good manual handling practices to be used (min. 2 person
Lifting and install roofing Manual handling : lifting &
ligaments of the low back lift); Use hand gloves
and cladding carrying
Low back stain, ligament sprain Use mechanical aids where required
The following test are required to assess the atmospheric conditions in the nominated space :
TEST REQUIRED
TEST FOR Permissible Exposure Limit (PEL)
YES NO
Ammonia Less than 25 ppm √
Carbon Dioxide Less than 5000 ppm √
Carbon Monoxide Less than 25 ppm √
Chlorine Less than 0.5 ppm √
Hydrogen Sulfide Less than 10 ppm √
Oxygen Greater than 19.5% & Less than 23.5% √
Ozone Less than 0.1 ppm √
Sulphur Dioxide Less than 2 ppm √
Hydrogen LEL = 4% & UEL = 75.6% √
LEL Less than/ ≤ 4% √
Ref. PI-05-03-01-F01 Page 11
Note :
1. Reference (OSHA PEL – 2013)
2. For clarification on the test required to be carried out refer PI-05-03-02 (Testing of Confined Space)