You are on page 1of 6

JOB SAFETY ANALYSIS

(RISK ASSESSMENT)

Area to be Access and/or Equipment Tag No. (KKS No.) : FGD Unit 8 (see attached drawings)

Work to be Done : REMOVE EXSISTING STRAINER AND INSTALLATION NEW BRACKET STRAINER UNIT 8

LOW HIGH Underwater Work Confined Space Excavation Hot Work


Risk Category Job :
Refer to Paiton Instruction : PI-05-03-01 Complex Lifting Work Working at High On Line Low & High Voltage
Work Order No. : Priority No. PAS Application No.
Work Period Date & Time Start Date & Time Finish
Applicant

Signature
:
(Work Parties)

Date : Time :

Work sequence Hazards Risk Control Measures

A. Prepartion

Mobilization tools,  Good manual handling practices to be used (min. 2 person lift);
Manual handling Musculoskeletal injuries
equipment and materials to Use hand gloves
the work place  Use mechanical aids where required
 Ensure all electrical equipment in good condition and knowing
Electrical Shock Personal injury or death
Electrical applies for how to use properly
equipment & lighting  Ensure all electrical equipment has been checked before use
and has valid tagging

Ref. PI-05-03-01-F01 Page 1


Work sequence Hazards Risk Control Measures
B. FabricatIon steel
structure (at Workshop Material stainles steel 304
Contractor)
Sharp edge. Cut from metal profil  Wearing leather glove

 Ensure the worker already got training


Grinder wheel throws off sparks  Put barricade around work area to prevent entry by
and hot bits of metal Skin & eyes injury unauthorized person
Cuting metal profil
 Ensure fire extinguisher has been prepare
 Worm Safety gloves and eye protection
Accidental contact with grinder
 Workers will ensure the grinder’s guard is in place and fully
wheel can cause bad cuts
operational before use.

 Put barricade and safety sign


 Remove any flammable materials from hot work area, relocate
or protect (fire proof blanket)
Fire Burns
 Ensure fir extinguisher has been prepared
 Ensure competent person undertakes all welding task
 Provide fire watcher

Welding steel structure  Welding screens to be used where appropriate: use face
Weld Flash Eyes injury
shield (welding cap)

 Put barricade and safety sign


 Remove any flammable materials from hot work area, relocate
or protect (fire proof blanket)
Sparks of fire and fumes Skin injury
 Ensure fir extinguisher has been prepared
 Wear appropriate PPE while welding
 Ensure surrounding work crews area aware of hot work
 Painter shall be provided with standard PPE
 No Hot work allowed. (at immediate area)
Hazard to health : Accidentally Personal injury
 Flammable liquids shall be stored and dispensed only from
inhaled, ingseted, eyes & skin
approved type containers
Painting irritation
 No bulk storage of paint material at site (designated area only)
Flammable material Fire  MSDS for the paint need to be place prior to work starting
 Cans/bottles for storage paint/thinner must be labeled from
IMPOMI

Ref. PI-05-03-01-F01 Page 2


Work sequence Hazards Risk Control Measures

C. Fabrication FRP pipa and


Workshop PT. Karya Mandiri’s Surabaya
fitting

D. Installation at site Mobilization material from emergency stair at turbine building

 Designated a supervisor to check load condition


Damage to the material brought  Ensure that load are properly positioned before unloading
Falling / overturning of load
Personal injury  Identify restricted area, install barricade & provide watchman
 Ensure sleepers are properly installing
Loading/unloading check
Injury to muscles, nerves, disc and  Good manual handling practices to be used (min. 2 person
Manual handling : lifting &
ligaments of the low back lift); Use hand gloves
carrying
Low back stain, ligament sprain  Use mechanical aids where required

FRP pipe 14”

 Ensure the worker already got training


Dismantled exsisting FRP Grinder wheel throws off sparks  Put barricade around work area to prevent entry by
pipe line, suport, grating and and hot bits of metal Skin & eyes injury unauthorized person
Strainer  Ensure fire extinguisher has been prepare
 Worm Safety gloves and eye protection
Using angle grinder and cuting
Accidental contact with grinder  Workers will ensure the grinder’s guard is in place and fully
torch Can cause bad cuts
wheel operational before use.
All activity must be  Put barricade and safety sign
coordinating by authorized  Remove any flammable materials from hot work area, relocate
person only from POMI or protect (fire proof blanket)
Fire Burns
 Ensure fir extinguisher has been prepared
Used chain block
 Ensure competent person undertakes all welding task
Provide fire watcher
Injury to muscles, nerves, disc and  Good manual handling practices to be used (min. 2 person
Manual handling : lifting &
ligaments of the low back lift); Use hand gloves
carrying
Low back stain, ligament sprain Use mechanical aids where required

Ref. PI-05-03-01-F01 Page 3


Work sequence Hazards Risk Control Measures

 Ensure working tools in good condition and knowing how to


Beaten by working tools Personal injury
use properly

Damage to exsisting facilities/


 Designated a engineer to check the dismantling sequence
Pieces of FRP pipe and fitting equipment , personal injury
 Identify restricted area, install barricade & provide watchman
falling / overturning
Secure existing equipment below dismantling area
Worker hit / crushed - pinch point

 Dust mask N95 for working crew


Dust dispersion Respiration system injury

 Conduct Tool Box meeting, wear proper PPE, Explanation


Damage to the crane / structure
Slip, Stumble safety standard and procedure installation before commencing
Lifting/erection strainer and near
each activity
FRP Pipe :
Damage to the material brought
1. Setting crane  Ensure that loads are properly positioned before unlashing
2. Slinging work Struck in between loads Worker hit / crushed material
 Install tag lines
3. Inching up brought
Damage to the material brought
(By mobile crane) Worker hit / crushed material
Jamming / hitting  Give a clear & signal after checking that it is safe
brought
Damage to the structure near
 Do not climb scaffold frame. Do not remove rails or bracing, do
stepping through open door
Personal injury from slip, fall not move scaffolding. Always close the hatch when entering
hatch
new level
Working on heights/
scaffolding  Know what is below and above you at all time. Use standard
from getting hit in the head from
safety helmet. Use safety rope where necessary to secure
tools or equipment dropped from Personal injury
items
above

 Ensure working tools in a good condition and knowing how to
Beaten by working tools
Tighten bolt and nut use properly
Personal injury
connecting the steel frame  Sufficient rest period between jobs and avoid repetitious
Strains and sprains
twisting

Ref. PI-05-03-01-F01 Page 4


Work sequence Hazards Risk Control Measures

 FRP instllaler shall be provided with standard PPE


 No Hot work allowed. (at immediate area)
Hazard to health : Accidentally Personal injury
 Flammable liquids shall be stored and dispensed only from
inhaled, ingseted, eyes & skin
approved type containers
irritation
 No bulk storage of paint material at site (designated area only)
Flammable material Fire  MSDS for the resin need to be place prior to work starting
 Cans/bottles for storage paint/thinner must be labeled from
IMPOMI

 Ensure the worker already got training


Grinder wheel throws off sparks  Put barricade around work area to prevent entry by
and hot bits of metal Skin & eyes injury unauthorized person
 Ensure fire extinguisher has been prepare
FRP pipe and fitting  Worm Safety gloves and eye protection
installation
Accidental contact with grinder  Workers will ensure the grinder’s guard is in place and fully
Can cause bad cuts
wheel operational before use.
 Put barricade and safety sign
 Remove any flammable materials from hot work area, relocate
or protect (fire proof blanket)
Fire Burns
 Ensure fir extinguisher has been prepared
 Ensure competent person undertakes all welding task
Provide fire watcher
Injury to muscles, nerves, disc and  Good manual handling practices to be used (min. 2 person
Manual handling : lifting &
ligaments of the low back lift); Use hand gloves
carrying
Low back stain, ligament sprain Use mechanical aids where required
 Ensure working tools in good condition and knowing how to
Beaten by working tools Personal injury
use properly
 Dust mask for housekeeping crew when necessary
Dust dispersion Respiration system injury
 Bundles bind or contained securely to prevent slippage
E. Housekeeping
 Keep tools, equipment, extension cords, ropes etc. Out of walk
Disorganized tool & material Trip, slips, falls
ways

Ref. PI-05-03-01-F01 Page 5


Additional Control Measures (please specify : state the other measures such as special work procedures, special emergency procedures etc) :
1.
2.
3.
4.
5.

The following test are required to assess the atmospheric conditions in the nominated space :
TEST REQUIRED
TEST FOR Permissible Exposure Limit (PEL)
YES NO
Ammonia Less than 25 ppm
Carbon Dioxide Less than 5000 ppm
Carbon Monoxide Less than 25 ppm
Chlorine Less than 0.5 ppm
Hydrogen Sulfide Less than 10 ppm
Oxygen Greater than 19.5% & Less than 23.5%
Ozone Less than 0.1 ppm
Sulphur Dioxide Less than 2 ppm
Hydrogen LEL = 4% & UEL = 75.6%
LEL Less than/ ≤ 4%
Note :
1. Reference (OSHA PEL – 2013)
2. For clarification on the test required to be carried out refer PI-05-03-02 (Testing of Confined Space)

Ref. PI-05-03-01-F01 Page 6